Study Guide: High-Speed Rail Projects in Argentina: Case Studies and Analysis

Cheat Sheet:
High-Speed Rail Projects in Argentina: Case Studies and Analysis Study Guide

The TAVe Project: Conception and Scope

The Buenos Aires–Rosario–Córdoba high-speed railway project was officially abbreviated as TAVe, an acronym for 'Tren de Alta Velocidad de Argentina'.

Answer: True

Explanation: The source states the project was officially abbreviated as TAVe, standing for 'Tren de Alta Velocidad de Argentina'.

Return to Game

The planned high-speed rail network was intended to span a total length of 440 kilometers.

Answer: False

Explanation: The planned length of the network was 710 kilometers, which is approximately 440 miles, not 440 kilometers.

Return to Game

Was the initial announcement of the Buenos Aires–Rosario–Córdoba high-speed railway project made by President Cristina Fernández de Kirchner?

Answer: False

Explanation: The project was initially announced by then-President Néstor Kirchner, not Cristina Fernández de Kirchner.

Return to Game

Had it been completed, the TAVe project would have been the first high-speed rail network in South America.

Answer: True

Explanation: The source states that if completed, it would have been the first high-speed rail network in South America.

Return to Game

The total estimated cost for the Buenos Aires–Rosario–Córdoba high-speed railway project was approximately US$4 billion.

Answer: True

Explanation: The source explicitly states the total cost was approximately US$4 billion.

Return to Game

In 2006, Buenos Aires and its metropolitan area accounted for almost one-third of Argentina's total national population.

Answer: True

Explanation: The source states that in 2006, Buenos Aires and its metropolitan area accounted for almost one-third of Argentina's total national population.

Return to Game

At the time of the project announcement, was Rosario the second-largest city in Argentina?

Answer: False

Explanation: Rosario was the third-largest city in Argentina, not the second-largest, at the time of the project announcement.

Return to Game

Córdoba is situated approximately 440 kilometers from Buenos Aires.

Answer: False

Explanation: Córdoba was situated approximately 710 kilometers (440 miles) from Buenos Aires, not 440 kilometers.

Return to Game

The three cities of Buenos Aires, Rosario, and Córdoba collectively represented more than one-third of Argentina's overall population when the project was conceived.

Answer: True

Explanation: The source states that these three cities collectively accounted for 15 million inhabitants, representing more than one-third of Argentina's overall population of 40 million.

Return to Game

Was the high-speed rail project primarily conceived to stimulate tourism between the major cities?

Answer: False

Explanation: The high-speed rail was primarily seen as a way to support the growth of Argentina's farm sector and contribute to regional economic development, not primarily to boost tourism.

Return to Game

Prior to the high-speed rail project, was air travel the predominant mode of transportation between Buenos Aires, Rosario, and Córdoba?

Answer: False

Explanation: Before the high-speed rail project, the main form of transportation between these cities was by road, with air travel following far behind.

Return to Game

Was the TAVe high-speed railway project under the ownership of a private consortium?

Answer: False

Explanation: The TAVe high-speed railway project was owned by the Government of Argentina, not a private consortium.

Return to Game

Was the high-speed railway designed to serve the provinces of Buenos Aires, Santa Fe, and Córdoba?

Answer: True

Explanation: The high-speed railway was planned to serve the provinces of Buenos Aires, Santa Fe, and Córdoba.

Return to Game

What was the official acronym for the Buenos Aires–Rosario–Córdoba high-speed railway project?

Answer: TAVe

Explanation: The official abbreviation for the Buenos Aires–Rosario–Córdoba high-speed railway project was TAVe, standing for 'Tren de Alta Velocidad de Argentina'.

Return to Game

Which three major Argentine cities were intended to be connected by the TAVe high-speed railway?

Answer: Buenos Aires, Rosario, and Córdoba

Explanation: The TAVe high-speed railway was designed to connect the Argentine cities of Buenos Aires, Rosario, and Córdoba.

Return to Game

What was the projected total length of the Buenos Aires–Rosario–Córdoba high-speed rail network, expressed in kilometers?

Answer: 710 kilometers

Explanation: The total planned length of the high-speed rail network was 710 kilometers.

Return to Game

Who initially announced the Buenos Aires–Rosario–Córdoba high-speed railway project?

Answer: Néstor Kirchner

Explanation: The project was initially announced by then-President Néstor Kirchner.

Return to Game

What unique historical significance would the Buenos Aires–Rosario–Córdoba high-speed railway have held if successfully completed?

Answer: It would have been the first high-speed rail network in South America.

Explanation: Had it been completed, the Buenos Aires–Rosario–Córdoba high-speed railway would have been the first high-speed rail network in South America.

Return to Game

What was the estimated total cost of the Buenos Aires–Rosario–Córdoba high-speed railway project?

Answer: US$4 billion

Explanation: The estimated total cost of the Buenos Aires–Rosario–Córdoba high-speed railway project was approximately US$4 billion.

Return to Game

In 2006, what approximate proportion of Argentina's total national population was encompassed by Buenos Aires and its metropolitan area?

Answer: Almost one-third

Explanation: In 2006, Buenos Aires and its metropolitan area accounted for almost one-third of Argentina's total national population.

Return to Game

According to the provided source, how is Buenos Aires characterized within the Argentine national context?

Answer: The economic and political center

Explanation: Buenos Aires is described as the economic and political center of Argentina.

Return to Game

At the time of the project's announcement, what was Rosario's economic function within Argentina?

Answer: A vital part of the agricultural and industrial core

Explanation: Rosario functioned as a major port and was a vital part of the agricultural and industrial core of Argentina's littoral region.

Return to Game

When the project was initially conceived, what was the collective population count for Buenos Aires, Rosario, and Córdoba?

Answer: 15 million

Explanation: The three cities of Buenos Aires, Rosario, and Córdoba collectively accounted for 15 million inhabitants.

Return to Game

What was the anticipated impact of the high-speed rail project on Argentina's existing railway infrastructure?

Answer: It was anticipated to be an essential component in the revival of railways.

Explanation: The high-speed rail was anticipated to be an essential component in the revival of railways in Argentina.

Return to Game

Which entity held ownership of the proposed Buenos Aires–Rosario–Córdoba high-speed railway project?

Answer: The Government of Argentina

Explanation: The proposed Buenos Aires–Rosario–Córdoba high-speed railway project was owned by the Government of Argentina.

Return to Game

Which of the following Argentine provinces was explicitly NOT designated for service by the high-speed railway?

Answer: Mendoza

Explanation: The high-speed railway was planned to serve the provinces of Buenos Aires, Santa Fe, and Córdoba.

Return to Game

The TAVe Project: Technical Design and Operations

The TAVe high-speed train was projected to achieve a maximum operational speed of 250 kilometers per hour.

Answer: False

Explanation: The TAVe high-speed train was projected to operate at an average speed of 250 kilometers per hour, but its top speed was projected to be 320 kilometers per hour.

Return to Game

Was the high-speed electric train designed to operate with overhead catenary power lines on a narrow gauge track?

Answer: False

Explanation: The high-speed electric train was designed to operate on a standard gauge track, not a narrow gauge track.

Return to Game

Was the railway primarily planned to utilize a double-track system, with a single-track segment near Córdoba?

Answer: False

Explanation: The railway was planned to run mainly on single-track, with a 55-kilometer section of double-track between Buenos Aires and Rosario, not mainly on double-track.

Return to Game

Was Alstom selected to supply eight single-deck TGV trains for the TAVe project?

Answer: False

Explanation: Alstom was chosen to provide eight double-deck TGV 'Cobra' trains, not single-deck trains.

Return to Game

The new high-speed line was projected to reduce the Buenos Aires—Rosario journey time to 85 minutes.

Answer: True

Explanation: The source states that the new high-speed line was projected to reduce the Buenos Aires—Rosario journey time to 85 minutes.

Return to Game

The projected total journey time from Buenos Aires to Córdoba using the high-speed railway would be approximately 2 hours and 55 minutes.

Answer: True

Explanation: The source indicates the total journey time from Buenos Aires to Córdoba would be approximately 2 hours and 55 minutes.

Return to Game

The plan anticipated 20 train services daily, carrying about 7,500 passengers along the central corridor.

Answer: True

Explanation: The plan anticipated 20 train services daily, expected to carry about 7,500 passengers along the central corridor.

Return to Game

Was Plaza Constitución station in Buenos Aires designated as a terminus for the high-speed railway line?

Answer: False

Explanation: Retiro station in Buenos Aires, not Plaza Constitución, was designated as a terminus for the high-speed railway line.

Return to Game

What was the maximum projected operational speed for the TAVe high-speed train?

Answer: 320 kilometers per hour

Explanation: The TAVe high-speed train was projected to reach a top speed of 320 kilometers per hour.

Return to Game

What standard track gauge was specified for the TAVe high-speed electric train?

Answer: 1,435 millimeters

Explanation: The high-speed electric train was designed to operate on a standard gauge track of 1,435 millimeters.

Return to Game

Describe the planned track configuration for the segment of the railway between Buenos Aires and Rosario.

Answer: A 55-kilometer section of double-track

Explanation: The railway was planned to include a 55-kilometer section of double-track between Buenos Aires and Rosario.

Return to Game

Which specific type of trains was Alstom selected to supply for the TAVe project?

Answer: Double-deck TGV 'Cobra' trains

Explanation: Alstom was chosen to provide eight double-deck TGV 'Cobra' trains for the TAVe project.

Return to Game

By what margin was the high-speed rail projected to reduce the Buenos Aires—Rosario journey time in comparison to an intercity bus?

Answer: From four hours to 85 minutes

Explanation: The new high-speed line was projected to reduce the Buenos Aires—Rosario journey time from approximately four hours by intercity bus to 85 minutes.

Return to Game

What was the estimated total travel duration from Buenos Aires to Córdoba via the proposed high-speed railway?

Answer: 2 hours 55 minutes

Explanation: The projected total journey time from Buenos Aires to Córdoba using the high-speed railway would be approximately 2 hours and 55 minutes.

Return to Game

Which of the following urban centers was NOT identified as a planned intermediate stop for the TAVe project?

Answer: La Plata

Explanation: The planned intermediate stops included Pilar, Campana, San Pedro, San Nicolás de los Arroyos, Cañada de Gómez, Marcos Juárez, Bell Ville, and Villa María, but not La Plata.

Return to Game

Which railway stations were designated as the terminal points for the Buenos Aires–Rosario–Córdoba high-speed railway?

Answer: Retiro and Córdoba

Explanation: Retiro station in Buenos Aires and Córdoba station were designated as the termini for the high-speed railway line.

Return to Game

Based on the source material, what specific class of vehicles was envisioned for deployment on the TAVe high-speed railway?

Answer: TGV duplex (double-deck) trains

Explanation: The source material references an image of a TGV duplex of French SNCF, indicating that similar double-deck vehicles would have been used for the TAVe project.

Return to Game

The TAVe Project: Bidding, Financing, and Dismissal

Did the French company Alstom intend to resume the high-speed rail project following its initial suspension?

Answer: True

Explanation: The source indicates that Alstom had intended to resume the project after its initial dismissal.

Return to Game

Four European firms, including Siemens and CAF, initially presented themselves as bidders for the high-speed railway project.

Answer: True

Explanation: The source confirms that four European firms, including Siemens and CAF, initially presented themselves as bidders.

Return to Game

The 'Veloxia' grouping was the only consortium that came forward as a bidder for the TAVe project.

Answer: True

Explanation: The source states that only the 'Veloxia' grouping came forward as a bidder.

Return to Game

Veloxia was formally selected on January 16, 2008, with IECSA undertaking civil engineering and Alstom supplying trains.

Answer: True

Explanation: The source confirms Veloxia was formally selected on January 16, 2008, with the specified roles for IECSA and Alstom.

Return to Game

The turnkey contract for the high-speed line was formally signed by President Cristina Fernández de Kirchner on April 29, 2008.

Answer: True

Explanation: The source states that the turnkey contract was formally signed by President Cristina Fernández de Kirchner on April 29, 2008.

Return to Game

Was the project placed 'on stand-by' in February 2009 primarily due to a shift in the Argentine government's strategic priorities?

Answer: False

Explanation: The project was put 'on stand-by' in February 2009 due to the 2008 financial crisis, not a change in government priorities.

Return to Game

Was the Buenos Aires–Rosario–Córdoba high-speed railway project definitively terminated in December 2012?

Answer: True

Explanation: The project was definitively dismissed in December 2012.

Return to Game

What was the principal reason articulated for the termination of the Buenos Aires–Rosario–Córdoba high-speed railway project?

Answer: The 2008 financial crisis

Explanation: The entire project was dismissed primarily due to the 2008 financial crisis.

Return to Game

Which French company intended to resume the high-speed rail project after its initial dismissal?

Answer: Alstom

Explanation: The French company Alstom had intended to resume the project after its initial dismissal.

Return to Game

Which of the following entities was NOT among the four European firms that initially submitted bids for the high-speed railway project?

Answer: Bombardier

Explanation: The four European firms that initially bid for the project were Alstom, Siemens, CAF, and Impregilo; Bombardier was not listed among them.

Return to Game

What specific financing stipulation was imposed upon the construction firm participating in the project?

Answer: The firm would be responsible for financing 50% of the cost.

Explanation: Pre-contractual conditions stated that while the national state would pay for the whole sum of the project, the firm in charge of the construction would be responsible for financing 50% of the cost.

Return to Game

In June 2007, which consortium was formally designated as the preferred bidder for the project?

Answer: The Veloxia grouping

Explanation: Only the 'Veloxia' grouping came forward as a bidder and was subsequently selected as the preferred bidder on June 20, 2007.

Return to Game

On what date was the Veloxia consortium formally selected for the TAVe project?

Answer: January 16, 2008

Explanation: Veloxia was formally selected on January 16, 2008.

Return to Game

On April 29, 2008, who formally executed the turnkey contract for the construction of the high-speed line?

Answer: Cristina Fernández de Kirchner

Explanation: The turnkey contract for the construction of the high-speed line was formally signed by President Cristina Fernández de Kirchner with the Veloxia consortium on April 29, 2008.

Return to Game

When was the Buenos Aires–Rosario–Córdoba high-speed railway project officially and definitively terminated?

Answer: December 2012

Explanation: The project was definitively dismissed in December 2012.

Return to Game

Other High-Speed Rail Initiatives in Argentina

Was another high-speed railway project proposed in Argentina intended to connect Buenos Aires with the city of Mendoza?

Answer: False

Explanation: Another high-speed railway project proposed in Argentina connected Buenos Aires to the seaside city of Mar del Plata, not Mendoza.

Return to Game

In 1999, a consortium including Adtranz, Siemens, and Ferrostaal proposed a Mar del Plata high-speed rail project.

Answer: True

Explanation: The source states that in 1999, a consortium including Adtranz, Siemens, and Ferrostaal proposed a Mar del Plata high-speed rail project.

Return to Game

The 1999 Mar del Plata high-speed rail proposal had an estimated cost of US$600 million.

Answer: True

Explanation: The 1999 proposal for the Mar del Plata high-speed rail had an estimated cost of US$600 million.

Return to Game

Did the 1999 plans for the Mar del Plata high-speed rail connection encompass service to coastal cities such as Necochea and Villa Gesell?

Answer: False

Explanation: The 1999 plans for the Mar del Plata connection included service to Pinamar, Miramar, and Necochea, but not Villa Gesell.

Return to Game

Did the 2009 bidding process for the Constitución–Mar del Plata line stipulate a maximum speed of 250 kilometers per hour?

Answer: False

Explanation: The 2009 bidding process for the Constitución–Mar del Plata line planned for a maximum speed of 320 kilometers per hour, with an average speed of 250 kilometers per hour.

Return to Game

The 2009 high-speed rail proposal to Mar del Plata projected a journey time of less than two hours with only two planned stops.

Answer: True

Explanation: The 2009 high-speed rail proposal projected a journey time of less than two hours to Mar del Plata, with only two planned stops.

Return to Game

Did the historical 'El Marplatense' train service from the 1950s complete the journey to Mar del Plata in less than 3 hours?

Answer: False

Explanation: The 'El Marplatense' service from the 1950s completed the run to Mar del Plata in 3 hours and 45 minutes, not under 3 hours.

Return to Game

The 'El Marplatense' train service ceased operations in 2015.

Answer: True

Explanation: The 'El Marplatense' train service ceased operations in 2015.

Return to Game

Beyond the TAVe, what other high-speed railway initiative was proposed in Argentina, linking Buenos Aires to a coastal city?

Answer: Buenos Aires to Mar del Plata

Explanation: Another high-speed railway project proposed in Argentina was a 400-kilometer route connecting Constitución station in Buenos Aires to the seaside beach resort city and major fishing port of Mar del Plata.

Return to Game

In 1999, which corporate entities constituted the consortium that put forth a high-speed rail project for Mar del Plata?

Answer: Adtranz, Siemens, Ferrostaal

Explanation: In 1999, a consortium formed by the companies Adtranz, Siemens, and Ferrostaal introduced a project for the Mar del Plata connection.

Return to Game

What was the projected financial outlay for the 1999 Mar del Plata high-speed rail proposal?

Answer: US$600 million

Explanation: The 1999 proposal for the Mar del Plata high-speed rail had an estimated cost of US$600 million.

Return to Game

Which of the following coastal municipalities was slated for service under the 1999 Mar del Plata high-speed rail plan?

Answer: Pinamar

Explanation: The 1999 plans for the Mar del Plata connection also included service to other coastal cities such as Pinamar, Miramar, and Necochea.

Return to Game

During the 2009 bidding process, what was the stipulated maximum operational speed for the Constitución–Mar del Plata line?

Answer: 320 kilometers per hour

Explanation: In the 2009 bidding process for the Constitución–Mar del Plata line, the new route was planned to enable an average speed of 250 kilometers per hour and a maximum speed of 320 kilometers per hour.

Return to Game

For the 2009 high-speed rail proposal to Mar del Plata, how many intermediate stops were projected?

Answer: Two

Explanation: The 2009 high-speed rail proposal projected a journey time of less than two hours to Mar del Plata, with only two planned stops in Dolores and Chascomús.

Return to Game

In what ways does the contemporary rail service to Mar del Plata differ from the historical 'El Marplatense' service of the 1950s?

Answer: Current service is significantly longer and disrupted by deficiencies.

Explanation: Currently, the service to Mar del Plata is disrupted by serious deficiencies and delays, taking over seven hours, significantly longer than the 'El Marplatense' service from the 1950s.

Return to Game

In what year did the 'El Marplatense' train service discontinue its operations?

Answer: 2015

Explanation: The 'El Marplatense' train service, which was operated mostly by Ferrocarriles Argentinos and later by Ferrobaires, ceased operations in 2015.

Return to Game

Public Perception and Controversies

Did a subsequent revelation regarding Alstom's payment of bribes to Argentine authorities contribute to the project's definitive suspension?

Answer: True

Explanation: A later revelation that Alstom had paid bribes to Argentine authorities contributed to the project's definitive suspension.

Return to Game

Poder Ciudadano criticized the TAVe project for being too expensive relative to the number of beneficiaries.

Answer: True

Explanation: Poder Ciudadano criticized the TAVe project for being disproportionately expensive relative to the number of beneficiaries.

Return to Game

Was Poder Ciudadano's request for access to the bidding process documentation ultimately granted following an appeal?

Answer: False

Explanation: Poder Ciudadano's request for access to the bidding process expedient was rejected on two separate occasions.

Return to Game

What was the resolution of Poder Ciudadano's formal request for access to the bidding process documentation?

Answer: It was rejected on two separate occasions.

Explanation: Poder Ciudadano requested access to the expedient of the bidding process for the high-speed railway, but their request was rejected on two separate occasions.