Enter a player name to begin or load your saved progress.
The official Danish designation for the New Little Belt Bridge is 'Gamle Lillebæltsbro'.
Answer: False
Explanation: The official Danish name for the New Little Belt Bridge is 'Nye Lillebæltsbro', which translates to 'New Little Belt Bridge'. 'Gamle Lillebæltsbro' refers to the Old Little Belt Bridge.
The New Little Belt Bridge connects the island of Funen to the mainland peninsula of Jutland.
Answer: True
Explanation: The New Little Belt Bridge serves as a vital link, connecting the island of Funen with the mainland peninsula of Jutland across the Little Belt strait.
A strait is defined as a large landmass separating two bodies of water.
Answer: False
Explanation: A strait is defined as a narrow passage of water connecting two larger bodies of water, not a landmass.
What is the official Danish name of the New Little Belt Bridge?
Answer: Nye Lillebæltsbro
Explanation: The official Danish name for the New Little Belt Bridge is 'Nye Lillebæltsbro', which directly translates to 'New Little Belt Bridge'.
Which two major Danish geographical areas does the New Little Belt Bridge connect?
Answer: Funen and the mainland peninsula of Jutland
Explanation: The New Little Belt Bridge connects the island of Funen with the mainland peninsula of Jutland, spanning the Little Belt strait.
What does the term 'strait' refer to, as mentioned in the context of the Little Belt?
Answer: A narrow passage of water connecting larger bodies of water
Explanation: In the context of the Little Belt, a 'strait' refers to a narrow passage of water connecting larger bodies of water.
The bridge connects Funen and Jutland across which body of water?
Answer: The Little Belt strait
Explanation: The bridge connects Funen and Jutland across the body of water known as the Little Belt strait.
The bridge connects Funen and Jutland across which body of water?
Answer: The Little Belt strait
Explanation: The bridge connects Funen and Jutland across the body of water known as the Little Belt strait.
The New Little Belt Bridge is classified as a beam bridge.
Answer: False
Explanation: The New Little Belt Bridge is not a beam bridge; it is engineered as a suspension bridge, a design distinct from beam structures.
The total length of the New Little Belt Bridge is 1,700 kilometers.
Answer: False
Explanation: The total length of the New Little Belt Bridge is 1,700 meters, not kilometers. The figure of 1,700 kilometers would represent an exceptionally vast distance.
The main span of the New Little Belt Bridge extends for 600 meters.
Answer: True
Explanation: The primary unsupported section, or main span, of the New Little Belt Bridge measures 600 meters in length.
The pylons supporting the bridge are 120 meters tall.
Answer: True
Explanation: The supporting pylons for the New Little Belt Bridge's main cables are approximately 120 meters in height.
The maximum clearance from the sea under the bridge is approximately 50 meters.
Answer: False
Explanation: The maximum clearance from the sea under the New Little Belt Bridge is approximately 44 meters, not 50 meters.
The bridge is equipped with a system to prevent ice and snow accumulation on its road deck.
Answer: True
Explanation: The road deck of the New Little Belt Bridge is equipped with a heating system designed to prevent the accumulation of ice and snow, ensuring safety and traffic continuity during winter conditions.
The total width of the New Little Belt Bridge is 33.3 meters.
Answer: True
Explanation: The overall width of the New Little Belt Bridge structure is measured at 33.3 meters.
The infobox mentions a clearance below the bridge of 42 meters.
Answer: True
Explanation: The infobox associated with the New Little Belt Bridge does indeed mention a clearance of 42 meters beneath its structure.
The consulting engineers for the bridge were solely C. Ostenfeld & W. Jønson.
Answer: False
Explanation: While C. Ostenfeld & W. Jønson were consulting engineers, they were associated with the larger firm COWI A/S, indicating they were not the sole entity involved.
COWI A/S was the primary contractor responsible for building the bridge.
Answer: False
Explanation: COWI A/S was involved in the engineering design, but the source does not identify them as the primary contractor for the construction itself.
Suspension bridges rely on arches to support the main deck.
Answer: False
Explanation: Suspension bridges primarily rely on main cables and vertical suspenders to support the deck, not arches, which are characteristic of arch bridges.
The New Little Belt Bridge has a main span significantly longer than its total length.
Answer: False
Explanation: The main span of a bridge is always shorter than its total length; the main span of the New Little Belt Bridge (600m) is considerably less than its total length (1,700m).
The bridge's height allows large ocean-going vessels to pass underneath.
Answer: False
Explanation: The bridge's clearance height is insufficient for large ocean-going vessels; it is designed to accommodate maritime traffic of moderate size.
What type of bridge structure is the New Little Belt Bridge?
Answer: Suspension bridge
Explanation: The New Little Belt Bridge is classified as a suspension bridge, characterized by its main cables and vertical suspenders supporting the deck.
What is the total length of the New Little Belt Bridge?
Answer: 1,700 meters
Explanation: The total length of the New Little Belt Bridge is 1,700 meters.
How long is the primary unsupported section (main span) of the bridge?
Answer: 600 meters
Explanation: The main span, which is the longest unsupported section of the New Little Belt Bridge, measures 600 meters.
What is the approximate height of the pylons that support the bridge's main cables?
Answer: 120 meters
Explanation: The pylons supporting the main suspension cables of the New Little Belt Bridge stand approximately 120 meters tall.
What is the maximum vertical clearance provided by the bridge for maritime traffic?
Answer: 44 meters
Explanation: The maximum vertical clearance available for maritime traffic passing beneath the New Little Belt Bridge is 44 meters.
What is the total width of the New Little Belt Bridge structure?
Answer: 33.3 meters
Explanation: The total width of the New Little Belt Bridge structure is 33.3 meters.
Which engineering firm is identified as being involved in the design of the bridge?
Answer: COWI A/S
Explanation: COWI A/S is identified as an engineering firm involved in the design of the New Little Belt Bridge, through the work of its consulting engineers C. Ostenfeld & W. Jønson.
Which of the following best describes the function of a suspension bridge's main components?
Answer: Main cables support the deck via vertical suspenders.
Explanation: In a suspension bridge, the main cables are the primary load-bearing elements, supporting the deck through vertical suspenders.
The clearance of 42 meters mentioned in the infobox refers to:
Answer: The vertical space available for ships passing underneath.
Explanation: The 42-meter clearance mentioned in the infobox refers to the vertical space available for maritime traffic passing beneath the bridge.
What engineering challenge does the suspension bridge design help overcome?
Answer: Achieving long spans over water without intermediate supports
Explanation: The suspension bridge design is particularly effective at overcoming the engineering challenge of achieving long spans over water without the need for intermediate supports.
Which of the following is NOT mentioned as a characteristic or feature of the New Little Belt Bridge in the source?
Answer: It carries a toll charge.
Explanation: The source material does not mention a toll charge for the New Little Belt Bridge; it is noted as being toll-free.
The consulting engineers C. Ostenfeld & W. Jønson were associated with which larger firm?
Answer: COWI A/S
Explanation: The consulting engineers C. Ostenfeld & W. Jønson were associated with the larger engineering firm COWI A/S.
What is the significance of the bridge's main span length (600 meters)?
Answer: It represents the longest distance between the pylons.
Explanation: The significance of the 600-meter main span length is that it represents the longest distance between the bridge's primary supporting pylons.
What is the relationship between the bridge's pylons and its main cables?
Answer: The pylons provide the primary vertical support for the main suspension cables.
Explanation: The pylons serve the critical function of providing primary vertical support for the main suspension cables of the bridge.
Construction on the New Little Belt Bridge began in the year 1970.
Answer: False
Explanation: Construction on the New Little Belt Bridge commenced in 1965, not 1970.
The New Little Belt Bridge was opened to traffic on October 21, 1970.
Answer: True
Explanation: The New Little Belt Bridge was officially opened for public traffic on October 21, 1970.
The bridge was inaugurated by Queen Margrethe II of Denmark.
Answer: False
Explanation: The inauguration ceremony for the New Little Belt Bridge was performed by King Frederik IX of Denmark, not Queen Margrethe II.
The primary purpose for constructing the bridge was to ease traffic on the older Little Belt Bridge.
Answer: True
Explanation: The principal motivation for constructing the New Little Belt Bridge was to alleviate traffic congestion and improve flow on the existing Old Little Belt Bridge.
The New Little Belt Bridge was built to replace the Old Little Belt Bridge entirely.
Answer: False
Explanation: The New Little Belt Bridge was constructed to supplement and alleviate traffic on the Old Little Belt Bridge, not to replace it entirely.
The bridge's construction aimed to improve connectivity between Jutland and Funen.
Answer: True
Explanation: The construction of the New Little Belt Bridge was undertaken with the explicit aim of enhancing and improving the transportation connectivity between Jutland and Funen.
In what year did the construction phase of the New Little Belt Bridge begin?
Answer: 1965
Explanation: The construction phase for the New Little Belt Bridge commenced in the year 1965.
When was the New Little Belt Bridge officially opened to traffic?
Answer: October 21, 1970
Explanation: The New Little Belt Bridge was officially opened to traffic on October 21, 1970.
Who performed the official inauguration ceremony for the New Little Belt Bridge?
Answer: King Frederik IX
Explanation: The official inauguration ceremony for the New Little Belt Bridge was conducted by King Frederik IX of Denmark.
What was the main reason cited for building the New Little Belt Bridge?
Answer: To alleviate traffic congestion on the older bridge
Explanation: The primary reason cited for the construction of the New Little Belt Bridge was to alleviate traffic congestion on the older Little Belt Bridge.
What is the relationship between the New Little Belt Bridge and the Old Little Belt Bridge?
Answer: The new bridge was built to ease traffic burden on the older bridge.
Explanation: The New Little Belt Bridge was constructed to alleviate the traffic burden on the older Little Belt Bridge.
The New Little Belt Bridge has a total of four lanes, two in each direction.
Answer: False
Explanation: The New Little Belt Bridge possesses a total of six lanes, configured as three lanes for traffic in each direction.
The bridge carries the designation E45 as part of a major European route.
Answer: False
Explanation: The New Little Belt Bridge carries the designation E20, not E45, as part of the European route network.
The New Little Belt Bridge has single-lane carriageways, similar to the old bridge.
Answer: False
Explanation: Unlike the old bridge's single lanes, the New Little Belt Bridge features multi-lane carriageways, with three lanes in each direction, to accommodate higher traffic volumes.
There is a toll required to cross the New Little Belt Bridge.
Answer: False
Explanation: Passage across the New Little Belt Bridge is toll-free.
The image caption describes the E20 highway on the bridge as having two lanes facing east.
Answer: False
Explanation: The image caption describes the E20 highway on the bridge as having three lanes facing east, not two.
The bridge facilitates traffic for the E20 European route.
Answer: True
Explanation: The New Little Belt Bridge serves as a crucial component of the E20 European route, facilitating international and national traffic flow.
How many traffic lanes does the New Little Belt Bridge have in total?
Answer: 6 lanes (3 in each direction)
Explanation: The New Little Belt Bridge accommodates a total of six traffic lanes, comprising three lanes for traffic in each direction.
Which major European route does the New Little Belt Bridge carry?
Answer: E20
Explanation: The New Little Belt Bridge is an integral part of the E20 European route, a significant transcontinental highway.
How does the lane configuration of the New Little Belt Bridge differ from the Old Little Belt Bridge?
Answer: The new bridge has multiple lanes in each direction, unlike the old bridge's single lanes.
Explanation: The New Little Belt Bridge features multiple lanes in each direction (three per direction), a significant improvement over the single lanes of the Old Little Belt Bridge.
Is there a toll associated with using the New Little Belt Bridge?
Answer: No, the bridge is toll-free.
Explanation: No toll is associated with using the New Little Belt Bridge; passage is free.
The E20 designation signifies that the bridge is part of what kind of network?
Answer: A network of major European highways
Explanation: The E20 designation signifies that the bridge is part of a network of major European highways.
Why was the increased capacity (more lanes) of the New Little Belt Bridge important?
Answer: To manage the high volume of car traffic between Jutland and Funen.
Explanation: The increased capacity, indicated by more lanes, was crucial for managing the high volume of car traffic between Jutland and Funen.
The New Little Belt Bridge is a key part of which major highway?
Answer: The E20 European route
Explanation: The New Little Belt Bridge is a key part of the E20 European route.
What does the term 'motorway' imply about the E20 route on the bridge?
Answer: It's a major road designed for high-speed traffic.
Explanation: The term 'motorway' implies that the E20 route on the bridge is a major road designed for high-speed vehicular traffic.
The New Little Belt Bridge features prominently in the Danish film 'The Olsen Gang Rides Again'.
Answer: False
Explanation: The New Little Belt Bridge appears in the Danish film 'The Olsen Gang in Jutland', not 'The Olsen Gang Rides Again'.
The bridge's appearance in the film signifies the Olsen Gang's arrival in Jutland.
Answer: True
Explanation: Within the narrative of 'The Olsen Gang in Jutland', the visual presence of the New Little Belt Bridge marks the Olsen Gang's arrival in the Jutland region.
Additional media files related to the bridge can be found on Wikipedia.
Answer: False
Explanation: Additional media files related to the bridge are available on Wikimedia Commons, not Wikipedia.
The Structurae database entry focuses on the bridge's historical traffic statistics.
Answer: False
Explanation: The Structurae database entry for the bridge focuses on its engineering and architectural details, not historical traffic statistics.
The Highways-Denmark.com link is a current source for bridge information.
Answer: False
Explanation: The link to Highways-Denmark.com is archived, indicating it is not a current source for bridge information and likely contains outdated data.
The web camera link provides historical photos of the bridge.
Answer: False
Explanation: The web camera link provides a live view of the bridge, not historical photographs.
In which specific Danish film does the New Little Belt Bridge make an appearance?
Answer: The Olsen Gang in Jutland
Explanation: The New Little Belt Bridge makes an appearance in the specific Danish film 'The Olsen Gang in Jutland'.
What does the appearance of the New Little Belt Bridge signify within the plot of 'The Olsen Gang in Jutland'?
Answer: The Olsen Gang's arrival in the Jutland region
Explanation: Within the narrative of 'The Olsen Gang in Jutland', the appearance of the New Little Belt Bridge signifies the Olsen Gang's arrival in the Jutland region.
Where can users find additional photos and media related to the New Little Belt Bridge?
Answer: Wikimedia Commons
Explanation: Additional photos and media related to the New Little Belt Bridge can be found on Wikimedia Commons.
What kind of information is typically found in the Structurae database entry for a structure like this bridge?
Answer: Engineering and architectural details
Explanation: The Structurae database typically contains engineering and architectural details for significant structures like the New Little Belt Bridge.
What does the archived link from Highways-Denmark.com likely provide?
Answer: Historical or potentially outdated information about the bridge.
Explanation: As an archived link, Highways-Denmark.com likely provides historical or potentially outdated information about the bridge.
Which detail about the bridge's appearance in 'The Olsen Gang in Jutland' is provided?
Answer: The exact minute mark (0:12:11)
Explanation: A specific detail provided about the bridge's appearance in 'The Olsen Gang in Jutland' is the exact timestamp of 0:12:11.