Welcome!

Enter a player name to begin or load your saved progress.

Mendota Hills Wind Farm Wiki2Web Clarity Challenge

Study Hints Create Teach
Global Score: 0
Trophies: 0 🏆

‹ Back

Score: 0 / 100

Study Guide: Mendota Hills Wind Farm: Project Overview and Technical Details

Cheat Sheet:
Mendota Hills Wind Farm: Project Overview and Technical Details Study Guide

Project Genesis and Historical Context

The Mendota Hills Wind Farm was commissioned in the year 2003.

Answer: True

Explanation: The Mendota Hills Wind Farm was commissioned in 2003, with its official online date being November 24, 2003.

Return to Game

Leeward Renewable Energy is the original developer of the Mendota Hills Wind Farm.

Answer: False

Explanation: While Leeward Renewable Energy is the current owner, the original developer of the Mendota Hills Wind Farm was Navitas Energy.

Return to Game

Navitas Energy, based in Chicago, developed the Mendota Hills Wind Farm.

Answer: False

Explanation: Navitas Energy was the original developer; however, the provided information indicates their base was Minneapolis, Minnesota, not Chicago.

Return to Game

Construction of the wind farm was completed in June 2003.

Answer: False

Explanation: Construction commenced in June 2003, but the wind farm was commissioned and officially began operation on November 24, 2003.

Return to Game

Mendota Hills was the first large-scale wind farm built in Illinois.

Answer: True

Explanation: The Mendota Hills Wind Farm holds the distinction of being the first utility-scale wind farm established within the state of Illinois.

Return to Game

The 'See also' section suggests related topics include other wind farms and general energy concepts.

Answer: True

Explanation: The 'See also' section of the source material lists related topics such as other wind farms and broader concepts within renewable energy, providing context for the Mendota Hills Wind Farm.

Return to Game

Wikimedia Commons contains information about the wind farm's financial performance.

Answer: False

Explanation: Wikimedia Commons primarily hosts media files, such as photographs, related to the Mendota Hills Wind Farm, not detailed financial performance data.

Return to Game

The Mendota Hills Wind Farm is currently inactive.

Answer: False

Explanation: The Mendota Hills Wind Farm is currently active and operational, generating electricity.

Return to Game

The image caption 'Three of the turbines at Mendota Hills Wind Farm.' refers to the original turbine count.

Answer: False

Explanation: The image caption merely describes the visual content and does not refer to the original turbine count (which was 63) or the current count (29).

Return to Game

What was the official year the Mendota Hills Wind Farm began operation?

Answer: 2003

Explanation: The Mendota Hills Wind Farm commenced operations in 2003.

Return to Game

Which company developed the Mendota Hills Wind Farm?

Answer: Navitas Energy

Explanation: Navitas Energy was the original developer of the Mendota Hills Wind Farm.

Return to Game

What distinction did the Mendota Hills Wind Farm achieve in Illinois?

Answer: It was the first utility-scale wind farm in the state.

Explanation: The Mendota Hills Wind Farm holds the distinction of being the first utility-scale wind farm established within the state of Illinois.

Return to Game

The coordinates provided for the wind farm serve what purpose?

Answer: To pinpoint the exact geographical location.

Explanation: The provided geographical coordinates (latitude and longitude) serve to precisely identify and locate the Mendota Hills Wind Farm on a map.

Return to Game

What does the source suggest is available on Wikimedia Commons regarding the Mendota Hills Wind Farm?

Answer: Media files, such as photographs.

Explanation: The source indicates that Wikimedia Commons hosts media files, primarily photographs, related to the Mendota Hills Wind Farm.

Return to Game

What does the 'commission date' signify for the wind farm?

Answer: The date the wind farm officially started operating.

Explanation: The commission date marks the official commencement of the wind farm's operational phase, signifying when it began generating and supplying electricity.

Return to Game

Original Turbine Technology and Scale

The original configuration of the wind farm featured fewer, but larger capacity turbines compared to the current setup.

Answer: False

Explanation: The original configuration featured *more* turbines (63) with *smaller* individual capacities (800 kW each), whereas the current setup has fewer turbines (29) with larger individual capacities (2.625 MW each).

Return to Game

The original Gamesa G52 turbines were approximately 52 meters tall.

Answer: False

Explanation: The original Gamesa G52 turbines were approximately 65 meters (214 feet) tall. The 52-meter figure refers to their rotor diameter.

Return to Game

Each original wind turbine cost approximately $10 million.

Answer: False

Explanation: Each of the original Gamesa G52-800 kW wind turbines had an approximate cost of US$1 million.

Return to Game

The original wind turbines had three blades, each measuring approximately 83 feet long.

Answer: True

Explanation: The original Gamesa G52 turbines were equipped with three blades, each measuring approximately 83 feet (25.91 meters) in length.

Return to Game

The rotors of the original turbines spun at a speed of approximately 50 revolutions per minute.

Answer: False

Explanation: The rotors of the original Gamesa G52 turbines operated at a speed of approximately 25 revolutions per minute (rpm).

Return to Game

What was the original number of wind turbines at the Mendota Hills Wind Farm?

Answer: 63

Explanation: The original configuration of the Mendota Hills Wind Farm featured 63 wind turbines.

Return to Game

What was the approximate height of the original Gamesa G52 wind turbines?

Answer: 65 meters

Explanation: The original Gamesa G52 turbines stood approximately 65 meters (214 feet) tall. The 52-meter figure refers to their rotor diameter.

Return to Game

What was the approximate cost of each *original* wind turbine at Mendota Hills?

Answer: US$1 million

Explanation: Each of the original Gamesa G52-800 kW wind turbines had an approximate cost of US$1 million.

Return to Game

What was the approximate rotor diameter of the original Gamesa G52 turbines?

Answer: 52 meters

Explanation: The original Gamesa G52 turbines featured a rotor diameter of approximately 52 meters (171 feet).

Return to Game

Modernization and Current Turbine Technology

Currently, the Mendota Hills Wind Farm operates 63 wind turbines.

Answer: False

Explanation: The current configuration of the Mendota Hills Wind Farm operates 29 wind turbines, a reduction from its original 63 turbines.

Return to Game

The wind turbines currently installed at Mendota Hills are identified as SiemensGamesa G126 models.

Answer: True

Explanation: The wind turbines installed during the 2019 upgrade at Mendota Hills are SiemensGamesa G126 models.

Return to Game

Each wind turbine at Mendota Hills has a nameplate capacity of 800 kW.

Answer: False

Explanation: The 800 kW capacity refers to the *original* Gamesa G52 turbines. The *current* SiemensGamesa G126 turbines each have a nameplate capacity of 2.625 MW.

Return to Game

The reconfiguration in 2019 involved replacing older turbines with newer, higher-capacity models.

Answer: True

Explanation: The 2019 reconfiguration involved replacing the original turbines with newer SiemensGamesa G126 models, which possess higher individual capacities.

Return to Game

How many wind turbines are currently operating at the Mendota Hills Wind Farm as of the latest information provided?

Answer: 29

Explanation: As of the latest information, the Mendota Hills Wind Farm operates 29 wind turbines.

Return to Game

What is the make and model of the wind turbines installed during the 2019 upgrade?

Answer: SiemensGamesa G126

Explanation: The wind turbines installed during the 2019 upgrade are SiemensGamesa G126 models.

Return to Game

What is the nameplate capacity of *each* current SiemensGamesa G126 turbine at Mendota Hills?

Answer: 2.625 MW

Explanation: Each of the SiemensGamesa G126 turbines installed during the 2019 upgrade has an individual nameplate capacity of 2.625 megawatts (MW).

Return to Game

Operational Metrics and Energy Output

The total nameplate capacity of the Mendota Hills Wind Farm is approximately 76.2 MW.

Answer: True

Explanation: The total nameplate capacity of the Mendota Hills Wind Farm is stated as approximately 76.2 MW, though some sources may cite figures around 76 MW or 72.6 MW.

Return to Game

The Mendota Hills Wind Farm has a storage capacity of 76 MW.

Answer: True

Explanation: The wind farm is reported to have a storage capacity of 76 MW.

Return to Game

The annual power generation is estimated to be enough to power roughly 1,300 homes.

Answer: False

Explanation: The estimated annual power generation of the Mendota Hills Wind Farm is sufficient to power approximately 13,000 homes, not 1,300.

Return to Game

What is the primary function of the Mendota Hills Wind Farm?

Answer: To generate electricity using wind turbines.

Explanation: The fundamental purpose of the Mendota Hills Wind Farm, like other wind energy facilities, is to harness wind power and convert it into electricity.

Return to Game

What was the total nameplate capacity of the Mendota Hills Wind Farm after its 2019 reconfiguration?

Answer: Approx. 76.2 MW

Explanation: Following the 2019 reconfiguration, the total nameplate capacity of the Mendota Hills Wind Farm is approximately 76.2 MW.

Return to Game

What is the estimated annual electricity generation of the Mendota Hills Wind Farm?

Answer: 110 million kilowatt hours

Explanation: The Mendota Hills Wind Farm generates an estimated 110 million kilowatt hours of electricity annually.

Return to Game

Approximately how many homes can the annual power generation from Mendota Hills support?

Answer: 13,000 homes

Explanation: The annual power generation from the Mendota Hills Wind Farm is sufficient to support approximately 13,000 homes.

Return to Game

What does the term 'nameplate capacity' refer to in the context of the wind farm?

Answer: The maximum power output the facility is designed to produce.

Explanation: Nameplate capacity denotes the maximum power output a wind turbine or facility is engineered to produce under optimal conditions.

Return to Game

Site Characteristics and Infrastructure

The Mendota Hills Wind Farm is located in Wisconsin.

Answer: False

Explanation: The source identifies the Mendota Hills Wind Farm as being located in Lee County, Illinois, not Wisconsin.

Return to Game

The Mendota Hills Wind Farm exclusively uses onshore wind turbines.

Answer: True

Explanation: The Mendota Hills Wind Farm is an onshore facility, meaning its turbines are situated on land.

Return to Game

The Mendota Hills Wind Farm spans across 2,200 acres of land.

Answer: True

Explanation: The Mendota Hills Wind Farm's turbine infrastructure is spread across approximately 2,200 acres (890 hectares) of land.

Return to Game

The wind farm is situated near Interstate 39.

Answer: True

Explanation: The Mendota Hills Wind Farm is located adjacent to Interstate 39, making it readily accessible from the highway.

Return to Game

In which county and state is the Mendota Hills Wind Farm primarily located?

Answer: Lee County, Illinois

Explanation: The Mendota Hills Wind Farm is situated in Lee County, Illinois.

Return to Game

How much land does the Mendota Hills Wind Farm occupy?

Answer: Approximately 2,200 acres

Explanation: The Mendota Hills Wind Farm's turbine infrastructure is spread across approximately 2,200 acres (890 hectares) of land.

Return to Game

What is the relationship between the Mendota Hills Wind Farm and Interstate 39?

Answer: The farm is situated adjacent to the highway.

Explanation: The Mendota Hills Wind Farm is located adjacent to Interstate 39, making it readily visible and accessible from the highway.

Return to Game

The coordinates provided for the wind farm serve what purpose?

Answer: To pinpoint the exact geographical location.

Explanation: The provided geographical coordinates (latitude and longitude) serve to precisely identify and locate the Mendota Hills Wind Farm on a map.

Return to Game

Ownership, Development, and Commercial Agreements

Commonwealth Edison is the utility that purchases the energy generated by the wind farm.

Answer: True

Explanation: Commonwealth Edison is the designated utility company responsible for purchasing the electricity generated by the Mendota Hills Wind Farm.

Return to Game

Landowners are compensated based on the number of turbines on their property, receiving $1,500 per megawatt produced.

Answer: False

Explanation: Landowner compensation is typically based on the megawatt capacity of the turbines situated on their land, with amounts ranging from US$1,200 to $1,500 per megawatt, rather than a fixed amount per turbine or a specific production-based rate.

Return to Game

Which company currently owns the Mendota Hills Wind Farm?

Answer: Leeward Renewable Energy

Explanation: Leeward Renewable Energy is the current owner of the Mendota Hills Wind Farm.

Return to Game

Which utility company buys the electricity generated by the Mendota Hills Wind Farm?

Answer: Commonwealth Edison

Explanation: Commonwealth Edison is the utility company that purchases the electricity generated by the Mendota Hills Wind Farm.

Return to Game

How are landowners typically compensated for hosting wind turbines?

Answer: A payment based on the megawatt capacity of turbines on their land.

Explanation: Landowners hosting wind turbines are typically compensated through agreements that base payments on the megawatt capacity of the turbines situated on their property, often within a range of US$1,200 to $1,500 per megawatt.

Return to Game

Pre-Construction Procedures and Environmental Assessment

Environmental and archaeological tests were conducted before construction began.

Answer: True

Explanation: Prior to the commencement of construction, comprehensive environmental and archaeological assessments were performed, alongside obtaining necessary zoning approvals.

Return to Game

Wind metering was conducted for one year prior to the wind farm's construction.

Answer: False

Explanation: Wind metering, a crucial step for assessing site viability, was conducted for two years prior to the commencement of the wind farm's construction.

Return to Game