The Eastern Gateway
An in-depth exploration of the historic Barauni-Guwahati railway line, a crucial artery connecting India's Northeast region with the rest of the country.
Line Overview 👇 Explore History 📜Dive in with Flashcard Learning!
🎮 Play the Wiki2Web Clarity Challenge Game🎮
Line Overview
Key Statistics
The Barauni–Guwahati line is a significant railway corridor, spanning approximately 784 km (487 mi). It operates on a broad gauge track (1,676 mm) and is capable of supporting speeds up to 110 km/h.
Ownership & Operation
This vital line is owned and operated by Indian Railways. Key operational responsibilities are shared between the East Central Railway and the Northeast Frontier Railway zones, ensuring seamless connectivity across its extensive route.
Route & Termini
Connecting the state of Bihar to Assam, the line traverses through West Bengal. Its primary termini are Barauni Junction in Bihar and Guwahati in Assam, serving as a critical link for the entire Northeast region.
Historical Development
Early Beginnings
The genesis of railway infrastructure in Assam dates back to 1882, primarily for transporting tea and coal. The need for a direct link to the port of Chittagong spurred the construction of the Assam Bengal Railway, which began laying tracks in 1891. By 1903, the line reached Lumding, and a branch line connected Guwahati to the eastern network in 1900.
Post-Partition Integration
Following India's partition in 1947, Assam's railway network was disconnected from the rest of the country. The crucial Assam Link project was initiated in 1948 to re-establish this connection. This involved building a link between Fakiragram and Kishanganj, eventually leading to the broad gauge conversion and extension of services.
Bridging the Gaps
Several significant bridges were constructed to facilitate this line, overcoming major river systems. The Rajendra Setu (1959) provided the first Ganges crossing, while the Saraighat Bridge (1962) was a landmark achievement, connecting Assam's metre-gauge lines across the Brahmaputra. Later, the Naranarayan Setu eased the load on the Saraighat Bridge.
Major Stations
Key Hubs
The Barauni–Guwahati line serves numerous important railway stations, acting as vital nodes for passenger and freight traffic. Some of the key stations along this route include:
- Barauni Junction
- Begusarai
- Khagaria Junction
- Naugachia
- Katihar Junction
- Dalkhola
- Kishanganj
- New Jalpaiguri
- Siliguri Junction
- Jalpaiguri Junction
- Jalpaiguri Road
- New Maynaguri
- Dhupguri
- Falakata
- New Cooch Behar
- New Alipurduar
- Fakiragram Junction
- Kokrajhar
- New Bongaigaon
- Rangia
- Kamakhya
- Guwahati
Significant Bridges
Engineering Marvels
The line's construction involved overcoming significant geographical challenges, necessitating the building of numerous bridges across major rivers. These structures are critical for maintaining the flow of traffic and connecting disparate regions.
Electrification Status
Modernizing the Network
The electrification of the Barauni–Guwahati line, spanning approximately 784 km, has been a significant undertaking to enhance efficiency and sustainability. As of recent reports, substantial progress has been made, with sections like Katihar to Srirampur Assam and Bongaigaon to Kamakhya being electrified. Electric passenger trains now operate up to New Cooch Behar (NCB), indicating ongoing advancements in modernizing this vital corridor.
Line Segmentation
Operational Divisions
For operational and administrative purposes, the extensive Barauni–Guwahati line is often considered in distinct sections, facilitating detailed planning and management:
- Barauni–Katihar section: The initial segment within Bihar.
- Katihar–New Jalpaiguri Section: Connecting Bihar to West Bengal.
- New Jalpaiguri–New Bongaigaon section: Traversing through West Bengal and into Assam.
- New Bongaigaon–Guwahati section: The final stretch leading to Assam's capital region.
Each section presents unique geographical and logistical considerations, reflecting the diverse terrain of Eastern India.
Teacher's Corner
Edit and Print this course in the Wiki2Web Teacher Studio

Click here to open the "Barauni U2013guwahati Line" Wiki2Web Studio curriculum kit
Use the free Wiki2web Studio to generate printable flashcards, worksheets, exams, and export your materials as a web page or an interactive game.
True or False?
Test Your Knowledge!
Gamer's Corner
Are you ready for the Wiki2Web Clarity Challenge?

Unlock the mystery image and prove your knowledge by earning trophies. This simple game is addictively fun and is a great way to learn!
Play now
References
References
Feedback & Support
To report an issue with this page, or to find out ways to support the mission, please click here.
Disclaimer
Important Notice
This page has been generated by an AI and is intended for informational and educational purposes only. The content is derived from publicly available data and may not be exhaustive or entirely up-to-date.
This is not professional advice. The information provided herein is not a substitute for professional railway engineering, logistical, or historical consultation. Always refer to official railway documentation and consult with qualified professionals for specific operational or planning needs.
The creators of this page are not responsible for any errors or omissions, or for any actions taken based on the information provided.