Kozloduy's Core
An authoritative guide to Bulgaria's primary nuclear power facility, exploring its technological foundations, operational history, and strategic importance.
Explore Kozloduy ๐ Reactor Details โ๏ธDive in with Flashcard Learning!
๐ฎ Play the Wiki2Web Clarity Challenge Game๐ฎ
Plant Overview
Strategic Location
The Kozloduy Nuclear Power Plant is situated in Bulgaria, approximately 180 kilometers (110 miles) north of the capital city, Sofia. Its location on the banks of the Danube River, near the border with Romania, underscores its regional significance. It stands as Bulgaria's sole nuclear power facility and is the largest of its kind in the Balkan region.
Operational Status
Currently, Kozloduy NPP operates two pressurized water reactors (PWRs) of the VVER-1000 design. These units contribute significantly to the national electricity grid, providing a substantial portion of Bulgaria's power supply. The plant is managed by Bulgarian Energy Holding EAD, a state-owned entity.
Foundational Milestones
The genesis of Bulgarian nuclear energy commenced with the signing of an agreement with the Soviet Union in 1966. Large-scale construction for the plant's first reactor began in April 1970, marking the initiation of a major national energy project. The plant has since undergone significant upgrades and expansions.
Reactor Technology & Data
Reactor Configuration
Kozloduy NPP utilizes VVER (Vodo-Vodorodniy Energeticheskiy Reaktor) reactors, a Soviet-designed pressurized water reactor. The plant initially comprised six units:
- Four VVER-440 V-230 reactors (Units 1-4).
- Two VVER-1000 V-320 reactors (Units 5-6).
Units 5 and 6 represent a more advanced generation, each with a net capacity of approximately 1003 MWe.
Detailed Reactor Specifications
The operational parameters and historical data for each unit are detailed below:
Capacity and Output
The plant's total operational capacity is approximately 2,176 MW (nameplate). In the period 2014-2018, it achieved a capacity factor of 87.2%, demonstrating high operational efficiency. The annual net output has been recorded at around 16,023 GWh, highlighting its substantial contribution to the energy sector.
Historical Development
Construction and Early Operations
The foundation of Kozloduy NPP was laid in 1970, making it the first nuclear power plant in Bulgaria and Southeast Europe. Equipment was sourced primarily from the Soviet Union, with contributions from East Germany, Czechoslovakia, and Hungary. Construction involved a vast workforce, signifying a major national undertaking.
EU Accession and Decommissioning
As part of Bulgaria's pre-accession commitments to the European Union, the older VVER-440 V-230 reactors (Units 1-4) were progressively shut down. Units 1 and 2 ceased operation in late 2002, followed by Units 3 and 4 at the end of 2006, just prior to the country's EU membership. This decommissioning process was driven by safety upgrade requirements and international agreements.
Fuel Supply Diversification
In recent years, Kozloduy NPP has focused on diversifying its fuel sources to enhance energy security. Agreements have been established with Western suppliers, including Westinghouse Electric Company for VVER fuel licensing and Framatome for fuel assemblies for Unit 6. These initiatives aim to reduce reliance on traditional suppliers and ensure operational continuity.
Safety and Regulatory Oversight
Safety Concerns and Upgrades
The older VVER-440/230 reactors (Units 1-4) faced scrutiny regarding safety standards. A 1995 report from the U.S. Department of Energy reportedly identified these units among the world's "ten most dangerous reactors." Consequently, substantial safety improvements were undertaken for Units 3 and 4, receiving positive assessments from the International Atomic Energy Agency (IAEA) and the World Association of Nuclear Operators (WANO) prior to their mandated shutdown.
Regulatory Framework
The operation and decommissioning of Kozloduy NPP are subject to rigorous national and international regulatory oversight. The IAEA and WANO play crucial roles in safety assessments and recommendations. The plant's continued operation, particularly for Units 5 and 6, involves ongoing life extension programs and adherence to evolving safety protocols.
Waste Management
The power plant manages its nuclear waste through dedicated facilities, including two spent fuel storage facilities. Approximately 82 metric tons of spent fuel were transferred to a repository in Zheleznogorsk, Russia, during the early 2000s. Modern storage solutions, such as CONSTOR casks, are employed for managing spent fuel.
Future Expansion and Development
New Unit Proposals
Following the termination of the Belene Nuclear Power Plant project, Bulgaria's government decided in 2012 to pursue the construction of a new reactor at the Kozloduy site. This initiative involves utilizing a 1000 MW reactor originally produced for the Belene project. The environmental impact assessment for this proposed Unit 7 received approval in October 2013.
Technological Partnerships
Discussions and negotiations have been held with potential technology providers for the new unit. In 2013, talks commenced with Westinghouse Electric Company regarding their AP1000 reactor design. The Bulgarian Energy Holding (BEH) has been central to these discussions, exploring options to secure advanced nuclear technology for future expansion.
Environmental Considerations
The proposed expansion has also involved international review of its environmental impact. A report by the Austrian Environment Agency in 2013 highlighted several areas requiring further attention in the Bulgarian Environmental Impact Assessment (EIA) report, including seismic hazard assessments, consideration of post-Fukushima safety lessons, and the analysis of external events and accident scenarios. These points underscore the complex regulatory and environmental landscape for new nuclear projects.
Teacher's Corner
Edit and Print this course in the Wiki2Web Teacher Studio

Click here to open the "Kozloduy Nuclear Power Plant" Wiki2Web Studio curriculum kit
Use the free Wiki2web Studio to generate printable flashcards, worksheets, exams, and export your materials as a web page or an interactive game.
True or False?
Test Your Knowledge!
Gamer's Corner
Are you ready for the Wiki2Web Clarity Challenge?

Unlock the mystery image and prove your knowledge by earning trophies. This simple game is addictively fun and is a great way to learn!
Play now
References
References
Feedback & Support
To report an issue with this page, or to find out ways to support the mission, please click here.
Disclaimer
Important Notice
This document has been generated by an Artificial Intelligence system. Its content is derived from publicly available data, primarily the Wikipedia article on the Kozloduy Nuclear Power Plant, and is intended for educational and informational purposes only. While efforts have been made to ensure accuracy and comprehensiveness based on the provided source, it may not reflect the absolute latest developments or nuances.
This is not professional advice. The information presented here does not constitute engineering, safety, or investment advice. Readers should consult official documentation, regulatory bodies, and qualified professionals for any specific applications or decisions related to nuclear power plant operations, safety, or development.
The creators of this content are not liable for any errors, omissions, or actions taken based on the information herein. Always verify critical information with authoritative sources.