Wiki2Web Studio

Create complete, beautiful interactive educational materials in less than 5 minutes.

Print flashcards, homework worksheets, exams/quizzes, study guides, & more.

Export your learner materials as an interactive game, a webpage, or FAQ style cheatsheet.

Unsaved Work Found!

It looks like you have unsaved work from a previous session. Would you like to restore it?



Elsterwerda Station: History, Infrastructure, and Operations

At a Glance

Title: Elsterwerda Station: History, Infrastructure, and Operations

Total Categories: 5

Category Stats

  • Historical Foundations and Early Development: 15 flashcards, 21 questions
  • Station Infrastructure and Modernization: 8 flashcards, 12 questions
  • The 1997 Derailment and its Aftermath: 6 flashcards, 10 questions
  • Operational Landscape and Services: 8 flashcards, 7 questions
  • Post-Reunification and Contemporary Status: 3 flashcards, 6 questions

Total Stats

  • Total Flashcards: 40
  • True/False Questions: 27
  • Multiple Choice Questions: 29
  • Total Questions: 56

Instructions

Click the button to expand the instructions for how to use the Wiki2Web Teacher studio in order to print, edit, and export data about Elsterwerda Station: History, Infrastructure, and Operations

Welcome to Your Curriculum Command Center

This guide will turn you into a Wiki2web Studio power user. Let's unlock the features designed to give you back your weekends.

The Core Concept: What is a "Kit"?

Think of a Kit as your all-in-one digital lesson plan. It's a single, portable file that contains every piece of content for a topic: your subject categories, a central image, all your flashcards, and all your questions. The true power of the Studio is speed—once a kit is made (or you import one), you are just minutes away from printing an entire set of coursework.

Getting Started is Simple:

  • Create New Kit: Start with a clean slate. Perfect for a brand-new lesson idea.
  • Import & Edit Existing Kit: Load a .json kit file from your computer to continue your work or to modify a kit created by a colleague.
  • Restore Session: The Studio automatically saves your progress in your browser. If you get interrupted, you can restore your unsaved work with one click.

Step 1: Laying the Foundation (The Authoring Tools)

This is where you build the core knowledge of your Kit. Use the left-side navigation panel to switch between these powerful authoring modules.

⚙️ Kit Manager: Your Kit's Identity

This is the high-level control panel for your project.

  • Kit Name: Give your Kit a clear title. This will appear on all your printed materials.
  • Master Image: Upload a custom cover image for your Kit. This is essential for giving your content a professional visual identity, and it's used as the main graphic when you export your Kit as an interactive game.
  • Topics: Create the structure for your lesson. Add topics like "Chapter 1," "Vocabulary," or "Key Formulas." All flashcards and questions will be organized under these topics.

🃏 Flashcard Author: Building the Knowledge Blocks

Flashcards are the fundamental concepts of your Kit. Create them here to define terms, list facts, or pose simple questions.

  • Click "➕ Add New Flashcard" to open the editor.
  • Fill in the term/question and the definition/answer.
  • Assign the flashcard to one of your pre-defined topics.
  • To edit or remove a flashcard, simply use the ✏️ (Edit) or ❌ (Delete) icons next to any entry in the list.

✍️ Question Author: Assessing Understanding

Create a bank of questions to test knowledge. These questions are the engine for your worksheets and exams.

  • Click "➕ Add New Question".
  • Choose a Type: True/False for quick checks or Multiple Choice for more complex assessments.
  • To edit an existing question, click the ✏️ icon. You can change the question text, options, correct answer, and explanation at any time.
  • The Explanation field is a powerful tool: the text you enter here will automatically appear on the teacher's answer key and on the Smart Study Guide, providing instant feedback.

🔗 Intelligent Mapper: The Smart Connection

This is the secret sauce of the Studio. The Mapper transforms your content from a simple list into an interconnected web of knowledge, automating the creation of amazing study guides.

  • Step 1: Select a question from the list on the left.
  • Step 2: In the right panel, click on every flashcard that contains a concept required to answer that question. They will turn green, indicating a successful link.
  • The Payoff: When you generate a Smart Study Guide, these linked flashcards will automatically appear under each question as "Related Concepts."

Step 2: The Magic (The Generator Suite)

You've built your content. Now, with a few clicks, turn it into a full suite of professional, ready-to-use materials. What used to take hours of formatting and copying-and-pasting can now be done in seconds.

🎓 Smart Study Guide Maker

Instantly create the ultimate review document. It combines your questions, the correct answers, your detailed explanations, and all the "Related Concepts" you linked in the Mapper into one cohesive, printable guide.

📝 Worksheet & 📄 Exam Builder

Generate unique assessments every time. The questions and multiple-choice options are randomized automatically. Simply select your topics, choose how many questions you need, and generate:

  • A Student Version, clean and ready for quizzing.
  • A Teacher Version, complete with a detailed answer key and the explanations you wrote.

🖨️ Flashcard Printer

Forget wrestling with table layouts in a word processor. Select a topic, choose a cards-per-page layout, and instantly generate perfectly formatted, print-ready flashcard sheets.

Step 3: Saving and Collaborating

  • 💾 Export & Save Kit: This is your primary save function. It downloads the entire Kit (content, images, and all) to your computer as a single .json file. Use this to create permanent backups and share your work with others.
  • ➕ Import & Merge Kit: Combine your work. You can merge a colleague's Kit into your own or combine two of your lessons into a larger review Kit.

You're now ready to reclaim your time.

You're not just a teacher; you're a curriculum designer, and this is your Studio.

This page is an interactive visualization based on the Wikipedia article "Elsterwerda station" (opens in new tab) and its cited references.

Text content is available under the Creative Commons Attribution-ShareAlike 4.0 License (opens in new tab). Additional terms may apply.

Disclaimer: This website is for informational purposes only and does not constitute any kind of advice. The information is not a substitute for consulting official sources or records or seeking advice from qualified professionals.


Owned and operated by Artificial General Intelligence LLC, a Michigan Registered LLC
Prompt engineering done with Gracekits.com
All rights reserved
Sitemaps | Contact

Export Options





Study Guide: Elsterwerda Station: History, Infrastructure, and Operations

Study Guide: Elsterwerda Station: History, Infrastructure, and Operations

Historical Foundations and Early Development

Elsterwerda station is located in the German state of Brandenburg.

Answer: True

Elsterwerda station is situated in the town of Elsterwerda, within the German state of Brandenburg.

Related Concepts:

  • What is Elsterwerda station and where is it located?: Elsterwerda station is a railway station situated in the town of Elsterwerda, within the German state of Brandenburg. It is a key stop on the important Berlin–Dresden railway line.
  • What is the primary railway line that Elsterwerda station is situated on?: Elsterwerda station is located on the Berlin–Dresden railway line.
  • What is the official website listed for Elsterwerda station?: The official website provided for Elsterwerda station is www.bahnhof.de.

The original Elsterwerda station building was constructed in an American-style timber construction.

Answer: True

The original station building at Elsterwerda was constructed in an American-style timber construction, as specified by the Berlin-Dresden Railway Company.

Related Concepts:

  • Who was responsible for the initial construction of the Elsterwerda station building, and what style was it built in?: The original station building at Elsterwerda was constructed by master mason Friedrich Jage, who later became an honorary citizen of the town. It was built in an American-style timber construction according to the specifications of the Berlin-Dresden Railway Company.
  • When was the Elsterwerda station building reconstructed, and what was the outcome?: The station building at Elsterwerda underwent reconstruction between 1988 and 1991. This renovation resulted in a completely altered appearance for the building, and the new station layout was finalized in March 1992.

Elsterwerda station officially opened on June 17, 1875, with a large public ceremony.

Answer: False

Elsterwerda station officially opened on June 17, 1875, but the event did not include a large public ceremony.

Related Concepts:

  • When was Elsterwerda station officially opened, and was there a public ceremony?: Elsterwerda station was opened on June 17, 1875, coinciding with the inauguration of the Berlin-Dresden railway line. However, the opening did not include a public ceremony.
  • What was the economic impact of the railway on Elsterwerda in the years following its opening?: The railway's presence transformed Elsterwerda into a significant economic hub. It attracted industrial companies to the area, leading to a notable increase in the town's population and overall development.

Mr Bruttloff was appointed as the first station master at Elsterwerda station.

Answer: True

The first station master appointed at Elsterwerda station was indeed Mr Bruttloff.

Related Concepts:

  • Who served as the first station master at Elsterwerda station?: The first station master appointed at Elsterwerda station was a Mr Bruttloff.

The Riesa–Elsterwerda railway, opened on October 15, 1875, led to a decline in Elsterwerda's economic importance.

Answer: False

The opening of the Riesa–Elsterwerda railway significantly boosted Elsterwerda's economy, attracting industrial companies and leading to population growth, rather than a decline.

Related Concepts:

  • How did the opening of the Riesa–Elsterwerda railway impact Elsterwerda?: The opening of the 22 kilometer Riesa–Elsterwerda railway on October 15, 1875, significantly boosted Elsterwerda's economy. The railway became a major economic driver, attracting several industrial companies to Elsterwerda and nearby Biehla, which in turn led to substantial population growth.
  • What was the economic impact of the railway on Elsterwerda in the years following its opening?: The railway's presence transformed Elsterwerda into a significant economic hub. It attracted industrial companies to the area, leading to a notable increase in the town's population and overall development.
  • How did the population of Elsterwerda change between 1871 and 1910, and what was the primary reason for this growth?: Elsterwerda's population grew considerably between 1871 and 1910. It increased from 1,739 residents in 1871 to 2,537 in 1895, and further to 4,224 by 1910. This growth was largely attributed to the establishment of industries attracted by the town's excellent rail connections.

Elsterwerda's population grew considerably between 1871 and 1910, largely due to industrial development.

Answer: True

Elsterwerda experienced substantial population growth between 1871 and 1910, primarily driven by the establishment of industries attracted by the town's railway connections.

Related Concepts:

  • How did the population of Elsterwerda change between 1871 and 1910, and what was the primary reason for this growth?: Elsterwerda's population grew considerably between 1871 and 1910. It increased from 1,739 residents in 1871 to 2,537 in 1895, and further to 4,224 by 1910. This growth was largely attributed to the establishment of industries attracted by the town's excellent rail connections.
  • What was the economic impact of the railway on Elsterwerda in the years following its opening?: The railway's presence transformed Elsterwerda into a significant economic hub. It attracted industrial companies to the area, leading to a notable increase in the town's population and overall development.
  • How did the opening of the Riesa–Elsterwerda railway impact Elsterwerda?: The opening of the 22 kilometer Riesa–Elsterwerda railway on October 15, 1875, significantly boosted Elsterwerda's economy. The railway became a major economic driver, attracting several industrial companies to Elsterwerda and nearby Biehla, which in turn led to substantial population growth.

Kaiser Wilhelm II visited Elsterwerda station on August 27, 1888, for an extended stay.

Answer: False

Kaiser Wilhelm II visited Elsterwerda station on August 27, 1888, but the train made only a brief stop of approximately ten minutes.

Related Concepts:

  • Who visited Elsterwerda station on a special train in 1888, and how long did the stop last?: Kaiser Wilhelm II, the German Emperor, visited Elsterwerda station on August 27, 1888, aboard a special train. The train made a brief stop of approximately ten minutes at the station.

Elsterwerda station served as a border station jointly managed by officials from Prussia and Saxony.

Answer: True

Due to its location on the border between Prussia and Saxony, Elsterwerda station's operations were jointly managed by officials from both states.

Related Concepts:

  • What unique administrative situation existed at Elsterwerda station due to its location?: Elsterwerda station served as a border station between the German states of Prussia and Saxony. Consequently, the station's operations were jointly managed by officials from both Prussian and Saxon railway authorities.
  • What is Elsterwerda station and where is it located?: Elsterwerda station is a railway station situated in the town of Elsterwerda, within the German state of Brandenburg. It is a key stop on the important Berlin–Dresden railway line.
  • What is the primary railway line that Elsterwerda station is situated on?: Elsterwerda station is located on the Berlin–Dresden railway line.

Relations between Prussian and Saxon officials managing Elsterwerda station were always described as amicable and cooperative.

Answer: False

Local accounts suggest that relations between Prussian and Saxon officials were sometimes strained, with an anecdote mentioning disagreements escalating to the point of throwing inkwells.

Related Concepts:

  • What unique administrative situation existed at Elsterwerda station due to its location?: Elsterwerda station served as a border station between the German states of Prussia and Saxony. Consequently, the station's operations were jointly managed by officials from both Prussian and Saxon railway authorities.
  • What was the reported dynamic between Prussian and Saxon officials managing Elsterwerda station?: According to local accounts, there were disputes between the Prussian and Saxon officials responsible for managing Elsterwerda station, with an anecdote suggesting they would throw inkwells at each other during disagreements.

During World War II, Elsterwerda station was bombed on April 19, 1945, causing severe damage.

Answer: True

On April 19, 1945, Elsterwerda station was bombed during World War II, resulting in severe damage to the railway premises and the town center due to the explosion of an ammunition train.

Related Concepts:

  • What was the fate of the Elsterwerda station building during World War II?: During World War II, on April 19, 1945, Elsterwerda station and its facilities were bombed. An ammunition train within the station was hit, causing explosions that severely damaged the railway premises and the town center. The upper storey of the station building was badly damaged and was not rebuilt afterward.
  • What role did Elsterwerda station play during the Allied air raids in April 1945?: During the Allied air raids in April 1945, Elsterwerda station was directly targeted and bombed on April 19. The explosion of an ammunition train stored at the station caused extensive damage to the railway facilities and the town center.
  • What significant event, besides its normal operations, is Elsterwerda station known for?: Elsterwerda station is notably known for a severe train crash that occurred in 1997. This incident involved a freight train carrying petrol tankers that derailed and subsequently exploded on the station premises.

Where is Elsterwerda station located?

Answer: In the German state of Brandenburg.

Elsterwerda station is situated in the town of Elsterwerda, within the German state of Brandenburg.

Related Concepts:

  • What is Elsterwerda station and where is it located?: Elsterwerda station is a railway station situated in the town of Elsterwerda, within the German state of Brandenburg. It is a key stop on the important Berlin–Dresden railway line.
  • What is the primary railway line that Elsterwerda station is situated on?: Elsterwerda station is located on the Berlin–Dresden railway line.
  • What is the official website listed for Elsterwerda station?: The official website provided for Elsterwerda station is www.bahnhof.de.

Who was responsible for the initial construction of the Elsterwerda station building?

Answer: Master mason Friedrich Jage

The original station building at Elsterwerda was constructed by master mason Friedrich Jage, according to the specifications of the Berlin-Dresden Railway Company.

Related Concepts:

  • Who was responsible for the initial construction of the Elsterwerda station building, and what style was it built in?: The original station building at Elsterwerda was constructed by master mason Friedrich Jage, who later became an honorary citizen of the town. It was built in an American-style timber construction according to the specifications of the Berlin-Dresden Railway Company.
  • When was the Elsterwerda station building reconstructed, and what was the outcome?: The station building at Elsterwerda underwent reconstruction between 1988 and 1991. This renovation resulted in a completely altered appearance for the building, and the new station layout was finalized in March 1992.

When was Elsterwerda station officially opened?

Answer: June 17, 1875

Elsterwerda station was officially opened on June 17, 1875, coinciding with the inauguration of the Berlin-Dresden railway line.

Related Concepts:

  • When was Elsterwerda station officially opened, and was there a public ceremony?: Elsterwerda station was opened on June 17, 1875, coinciding with the inauguration of the Berlin-Dresden railway line. However, the opening did not include a public ceremony.
  • When was the Elsterwerda station building reconstructed, and what was the outcome?: The station building at Elsterwerda underwent reconstruction between 1988 and 1991. This renovation resulted in a completely altered appearance for the building, and the new station layout was finalized in March 1992.

What was the purpose of the excursion trains that stopped at Elsterwerda in July 1875?

Answer: In conjunction with an industrial exhibition being held

In July 1875, excursion trains from Berlin to Dresden stopped at Elsterwerda in connection with an ongoing industrial exhibition.

Related Concepts:

  • What was the purpose of the excursion trains that ran to Elsterwerda in July 1875?: In July 1875, excursion trains operated from Berlin to Dresden, making a stop at Elsterwerda, in conjunction with an industrial exhibition being held.

What was a significant economic consequence of the opening of the Riesa–Elsterwerda railway in 1875?

Answer: It attracted several industrial companies and boosted the town's economy and population.

The opening of the Riesa–Elsterwerda railway in 1875 significantly boosted Elsterwerda's economy by attracting industrial companies and fostering population growth.

Related Concepts:

  • How did the opening of the Riesa–Elsterwerda railway impact Elsterwerda?: The opening of the 22 kilometer Riesa–Elsterwerda railway on October 15, 1875, significantly boosted Elsterwerda's economy. The railway became a major economic driver, attracting several industrial companies to Elsterwerda and nearby Biehla, which in turn led to substantial population growth.
  • What was the economic impact of the railway on Elsterwerda in the years following its opening?: The railway's presence transformed Elsterwerda into a significant economic hub. It attracted industrial companies to the area, leading to a notable increase in the town's population and overall development.
  • How did the population of Elsterwerda change between 1871 and 1910, and what was the primary reason for this growth?: Elsterwerda's population grew considerably between 1871 and 1910. It increased from 1,739 residents in 1871 to 2,537 in 1895, and further to 4,224 by 1910. This growth was largely attributed to the establishment of industries attracted by the town's excellent rail connections.

What was the primary reason for Elsterwerda's population growth between 1871 and 1910?

Answer: The establishment of industries attracted by rail connections

Elsterwerda's population growth between 1871 and 1910 was primarily driven by the establishment of industries that were attracted by the town's advantageous rail connections.

Related Concepts:

  • How did the population of Elsterwerda change between 1871 and 1910, and what was the primary reason for this growth?: Elsterwerda's population grew considerably between 1871 and 1910. It increased from 1,739 residents in 1871 to 2,537 in 1895, and further to 4,224 by 1910. This growth was largely attributed to the establishment of industries attracted by the town's excellent rail connections.
  • What was the economic impact of the railway on Elsterwerda in the years following its opening?: The railway's presence transformed Elsterwerda into a significant economic hub. It attracted industrial companies to the area, leading to a notable increase in the town's population and overall development.
  • How did the opening of the Riesa–Elsterwerda railway impact Elsterwerda?: The opening of the 22 kilometer Riesa–Elsterwerda railway on October 15, 1875, significantly boosted Elsterwerda's economy. The railway became a major economic driver, attracting several industrial companies to Elsterwerda and nearby Biehla, which in turn led to substantial population growth.

Who visited Elsterwerda station on a special train on August 27, 1888?

Answer: Kaiser Wilhelm II

Kaiser Wilhelm II visited Elsterwerda station on August 27, 1888, aboard a special train.

Related Concepts:

  • Who visited Elsterwerda station on a special train in 1888, and how long did the stop last?: Kaiser Wilhelm II, the German Emperor, visited Elsterwerda station on August 27, 1888, aboard a special train. The train made a brief stop of approximately ten minutes at the station.

What happened regarding the proposal for a railway line connecting Elsterwerda to Kamenz in March 1894?

Answer: It was proposed but ultimately never realized.

A proposal for a railway line from Elsterwerda to Kamenz was put forth in March 1894, but this project was never realized.

Related Concepts:

  • Was there ever a proposal to build a railway line connecting Elsterwerda to Kamenz?: Yes, in March 1894, a proposal was put forth for the construction of a railway line extending from Elsterwerda to Kamenz. However, this project, like many other proposed railway ventures of that era, was never realized.

Due to its location, Elsterwerda station required joint management by officials from which two German states?

Answer: Prussia and Saxony

As a border station between Prussia and Saxony, Elsterwerda station required joint management by officials from both Prussian and Saxon railway authorities.

Related Concepts:

  • What unique administrative situation existed at Elsterwerda station due to its location?: Elsterwerda station served as a border station between the German states of Prussia and Saxony. Consequently, the station's operations were jointly managed by officials from both Prussian and Saxon railway authorities.
  • What is Elsterwerda station and where is it located?: Elsterwerda station is a railway station situated in the town of Elsterwerda, within the German state of Brandenburg. It is a key stop on the important Berlin–Dresden railway line.
  • What is the primary railway line that Elsterwerda station is situated on?: Elsterwerda station is located on the Berlin–Dresden railway line.

What is an anecdote describing the dynamic between Prussian and Saxon officials managing Elsterwerda station?

Answer: They would throw inkwells at each other during disagreements.

An anecdote suggests that disagreements between Prussian and Saxon officials managing Elsterwerda station could escalate to the point where they would throw inkwells at each other.

Related Concepts:

  • What was the reported dynamic between Prussian and Saxon officials managing Elsterwerda station?: According to local accounts, there were disputes between the Prussian and Saxon officials responsible for managing Elsterwerda station, with an anecdote suggesting they would throw inkwells at each other during disagreements.
  • What unique administrative situation existed at Elsterwerda station due to its location?: Elsterwerda station served as a border station between the German states of Prussia and Saxony. Consequently, the station's operations were jointly managed by officials from both Prussian and Saxon railway authorities.

What happened to the Elsterwerda station building during World War II?

Answer: The upper storey was badly damaged and not rebuilt afterward.

During World War II, the station building was bombed, resulting in severe damage, particularly to its upper storey, which was not subsequently rebuilt.

Related Concepts:

  • What was the fate of the Elsterwerda station building during World War II?: During World War II, on April 19, 1945, Elsterwerda station and its facilities were bombed. An ammunition train within the station was hit, causing explosions that severely damaged the railway premises and the town center. The upper storey of the station building was badly damaged and was not rebuilt afterward.
  • What role did Elsterwerda station play during the Allied air raids in April 1945?: During the Allied air raids in April 1945, Elsterwerda station was directly targeted and bombed on April 19. The explosion of an ammunition train stored at the station caused extensive damage to the railway facilities and the town center.

Station Infrastructure and Modernization

Following its reconstruction in the 1990s, Elsterwerda station features only one platform edge.

Answer: False

After reconstruction in the 1990s, Elsterwerda station features three platform edges, including a main platform and an island platform.

Related Concepts:

  • What are the key features of Elsterwerda station's infrastructure following its reconstruction in the 1990s?: After reconstruction in the 1990s, Elsterwerda station features three platform edges. These include a main platform adjacent to the station building, measuring 300 meters long and 55 cm high, and an island platform, also 300 meters long but 38 cm high.
  • What specific track and platform improvements were made at Elsterwerda station between 2014 and 2016?: Between 2014 and 2016, Elsterwerda station saw the renewal of 3.6 kilometers of track and seven switches. A barrier-free pedestrian underpass with two lifts was constructed, along with a 320 meter long central platform, while other tracks and points were removed.
  • When was the Elsterwerda station building reconstructed, and what was the outcome?: The station building at Elsterwerda underwent reconstruction between 1988 and 1991. This renovation resulted in a completely altered appearance for the building, and the new station layout was finalized in March 1992.

The main platform at Elsterwerda station is 55 cm high, while the island platform is 38 cm high.

Answer: True

The main platform at Elsterwerda station measures 55 cm in height, while the island platform is 38 cm high.

Related Concepts:

  • What are the key features of Elsterwerda station's infrastructure following its reconstruction in the 1990s?: After reconstruction in the 1990s, Elsterwerda station features three platform edges. These include a main platform adjacent to the station building, measuring 300 meters long and 55 cm high, and an island platform, also 300 meters long but 38 cm high.
  • How are the different platforms at Elsterwerda station connected?: The main platform and the island platform at Elsterwerda station are connected by an underpass, which is accessible via stairs.
  • How many platforms and tracks does Elsterwerda station currently have?: Elsterwerda station has 3 platforms and 7 tracks.

The platforms at Elsterwerda station are connected by a bridge accessible via stairs.

Answer: False

The main platform and the island platform at Elsterwerda station are connected via an underpass, which is accessible by stairs.

Related Concepts:

  • How are the different platforms at Elsterwerda station connected?: The main platform and the island platform at Elsterwerda station are connected by an underpass, which is accessible via stairs.
  • What are the key features of Elsterwerda station's infrastructure following its reconstruction in the 1990s?: After reconstruction in the 1990s, Elsterwerda station features three platform edges. These include a main platform adjacent to the station building, measuring 300 meters long and 55 cm high, and an island platform, also 300 meters long but 38 cm high.
  • What specific track and platform improvements were made at Elsterwerda station between 2014 and 2016?: Between 2014 and 2016, Elsterwerda station saw the renewal of 3.6 kilometers of track and seven switches. A barrier-free pedestrian underpass with two lifts was constructed, along with a 320 meter long central platform, while other tracks and points were removed.

The upper storey of the Elsterwerda station building was rebuilt after the World War II bombing.

Answer: False

The upper storey of the Elsterwerda station building was severely damaged by bombing during World War II and was not rebuilt afterward.

Related Concepts:

  • What was the fate of the Elsterwerda station building during World War II?: During World War II, on April 19, 1945, Elsterwerda station and its facilities were bombed. An ammunition train within the station was hit, causing explosions that severely damaged the railway premises and the town center. The upper storey of the station building was badly damaged and was not rebuilt afterward.
  • What role did Elsterwerda station play during the Allied air raids in April 1945?: During the Allied air raids in April 1945, Elsterwerda station was directly targeted and bombed on April 19. The explosion of an ammunition train stored at the station caused extensive damage to the railway facilities and the town center.
  • When was the Elsterwerda station building reconstructed, and what was the outcome?: The station building at Elsterwerda underwent reconstruction between 1988 and 1991. This renovation resulted in a completely altered appearance for the building, and the new station layout was finalized in March 1992.

The Elsterwerda station building underwent reconstruction between 1988 and 1991, resulting in a completely altered appearance.

Answer: True

Reconstruction of the Elsterwerda station building between 1988 and 1991 led to a significantly altered appearance, with the new layout finalized in March 1992.

Related Concepts:

  • When was the Elsterwerda station building reconstructed, and what was the outcome?: The station building at Elsterwerda underwent reconstruction between 1988 and 1991. This renovation resulted in a completely altered appearance for the building, and the new station layout was finalized in March 1992.

In 2004, the station forecourt at Elsterwerda was rebuilt, replacing existing buildings with green spaces and new bus platforms.

Answer: True

The station forecourt was rebuilt in 2004, involving the demolition of existing structures and their replacement with green spaces and new bus platforms.

Related Concepts:

  • What improvements were made to the station forecourt and bus station area in 2004?: In 2004, the station forecourt at Elsterwerda was completely rebuilt. Several existing buildings in the area were demolished and replaced with green spaces and new platforms for the bus station, with the new works officially inaugurated on August 5, 2004.
  • What specific track and platform improvements were made at Elsterwerda station between 2014 and 2016?: Between 2014 and 2016, Elsterwerda station saw the renewal of 3.6 kilometers of track and seven switches. A barrier-free pedestrian underpass with two lifts was constructed, along with a 320 meter long central platform, while other tracks and points were removed.
  • What infrastructure upgrades occurred at Elsterwerda station between mid-2014 and July 2015?: Between mid-2014 and July 2015, significant track renewal took place at Elsterwerda station. This included renewing 3.6 kilometers of track, seven switches, constructing a barrier-free pedestrian underpass equipped with two lifts, and building a 320 meter long central platform. Additionally, some tracks and points were dismantled.

Between mid-2014 and July 2015, Elsterwerda station saw the construction of a 320 meter long island platform.

Answer: False

Between mid-2014 and July 2015, a 320-meter long central platform was constructed as part of broader track renewal and infrastructure upgrades, not an island platform.

Related Concepts:

  • What are the key features of Elsterwerda station's infrastructure following its reconstruction in the 1990s?: After reconstruction in the 1990s, Elsterwerda station features three platform edges. These include a main platform adjacent to the station building, measuring 300 meters long and 55 cm high, and an island platform, also 300 meters long but 38 cm high.
  • What infrastructure upgrades occurred at Elsterwerda station between mid-2014 and July 2015?: Between mid-2014 and July 2015, significant track renewal took place at Elsterwerda station. This included renewing 3.6 kilometers of track, seven switches, constructing a barrier-free pedestrian underpass equipped with two lifts, and building a 320 meter long central platform. Additionally, some tracks and points were dismantled.
  • What specific track and platform improvements were made at Elsterwerda station between 2014 and 2016?: Between 2014 and 2016, Elsterwerda station saw the renewal of 3.6 kilometers of track and seven switches. A barrier-free pedestrian underpass with two lifts was constructed, along with a 320 meter long central platform, while other tracks and points were removed.

How many platform edges does Elsterwerda station feature after its reconstruction in the 1990s?

Answer: Three

Following its reconstruction in the 1990s, Elsterwerda station features three platform edges.

Related Concepts:

  • What are the key features of Elsterwerda station's infrastructure following its reconstruction in the 1990s?: After reconstruction in the 1990s, Elsterwerda station features three platform edges. These include a main platform adjacent to the station building, measuring 300 meters long and 55 cm high, and an island platform, also 300 meters long but 38 cm high.
  • How many platforms and tracks does Elsterwerda station currently have?: Elsterwerda station has 3 platforms and 7 tracks.
  • When was the Elsterwerda station building reconstructed, and what was the outcome?: The station building at Elsterwerda underwent reconstruction between 1988 and 1991. This renovation resulted in a completely altered appearance for the building, and the new station layout was finalized in March 1992.

How are the main platform and the island platform at Elsterwerda station connected?

Answer: Through an underpass accessible via stairs

The main platform and the island platform at Elsterwerda station are connected by an underpass, which is accessible via stairs.

Related Concepts:

  • How are the different platforms at Elsterwerda station connected?: The main platform and the island platform at Elsterwerda station are connected by an underpass, which is accessible via stairs.
  • What are the key features of Elsterwerda station's infrastructure following its reconstruction in the 1990s?: After reconstruction in the 1990s, Elsterwerda station features three platform edges. These include a main platform adjacent to the station building, measuring 300 meters long and 55 cm high, and an island platform, also 300 meters long but 38 cm high.
  • What specific track and platform improvements were made at Elsterwerda station between 2014 and 2016?: Between 2014 and 2016, Elsterwerda station saw the renewal of 3.6 kilometers of track and seven switches. A barrier-free pedestrian underpass with two lifts was constructed, along with a 320 meter long central platform, while other tracks and points were removed.

What improvements were made to the station forecourt and bus station area in 2004?

Answer: Demolition of existing buildings, replaced with green spaces and new bus platforms.

In 2004, the station forecourt was rebuilt, involving the demolition of existing buildings and their replacement with green spaces and new bus platforms.

Related Concepts:

  • What improvements were made to the station forecourt and bus station area in 2004?: In 2004, the station forecourt at Elsterwerda was completely rebuilt. Several existing buildings in the area were demolished and replaced with green spaces and new platforms for the bus station, with the new works officially inaugurated on August 5, 2004.

Which infrastructure upgrade occurred at Elsterwerda station between mid-2014 and July 2015?

Answer: Construction of a barrier-free pedestrian underpass equipped with two lifts.

Between mid-2014 and July 2015, infrastructure upgrades included the construction of a barrier-free pedestrian underpass equipped with two lifts, alongside track renewals and a new central platform.

Related Concepts:

  • What infrastructure upgrades occurred at Elsterwerda station between mid-2014 and July 2015?: Between mid-2014 and July 2015, significant track renewal took place at Elsterwerda station. This included renewing 3.6 kilometers of track, seven switches, constructing a barrier-free pedestrian underpass equipped with two lifts, and building a 320 meter long central platform. Additionally, some tracks and points were dismantled.
  • What specific track and platform improvements were made at Elsterwerda station between 2014 and 2016?: Between 2014 and 2016, Elsterwerda station saw the renewal of 3.6 kilometers of track and seven switches. A barrier-free pedestrian underpass with two lifts was constructed, along with a 320 meter long central platform, while other tracks and points were removed.

What was the purpose of constructing an electronic signal box in the Elsterwerda area between June 2014 and June 2016?

Answer: To replace older signalling systems and improve operational efficiency.

The construction of an electronic signal box in the Elsterwerda area aimed to modernize signalling systems and enhance operational efficiency.

Related Concepts:

  • What was the purpose of building an electronic signal box in the Elsterwerda area?: An electronic signal box was constructed for the Elsterwerda and Hohenleipisch area between June 2014 and June 2016. This modernization aimed to replace older signalling systems and improve operational efficiency.
  • What specific track and platform improvements were made at Elsterwerda station between 2014 and 2016?: Between 2014 and 2016, Elsterwerda station saw the renewal of 3.6 kilometers of track and seven switches. A barrier-free pedestrian underpass with two lifts was constructed, along with a 320 meter long central platform, while other tracks and points were removed.
  • What infrastructure upgrades occurred at Elsterwerda station between mid-2014 and July 2015?: Between mid-2014 and July 2015, significant track renewal took place at Elsterwerda station. This included renewing 3.6 kilometers of track, seven switches, constructing a barrier-free pedestrian underpass equipped with two lifts, and building a 320 meter long central platform. Additionally, some tracks and points were dismantled.

The 1997 Derailment and its Aftermath

The severe train crash in 1997 at Elsterwerda station involved a freight train carrying petrol tankers.

Answer: True

The 1997 incident at Elsterwerda station involved a freight train carrying petrol tankers that derailed and subsequently exploded on the station premises.

Related Concepts:

  • What significant event, besides its normal operations, is Elsterwerda station known for?: Elsterwerda station is notably known for a severe train crash that occurred in 1997. This incident involved a freight train carrying petrol tankers that derailed and subsequently exploded on the station premises.

The serious accident on November 20, 1997, was caused by the train traveling at a safe speed within the designated limit.

Answer: False

The accident on November 20, 1997, occurred because the freight train was traveling at 90 km/h in a zone with a speed limit of 40 km/h.

Related Concepts:

  • What caused the major train derailment and fire at Elsterwerda station on November 20, 1997?: The serious accident on November 20, 1997, was caused by a freight train carrying 22 petrol-filled tank cars derailing at a set of points. The derailment occurred because the train was traveling at 90 km/h in a zone with a speed limit of 40 km/h.

The 1997 derailment led to subsequent explosions and a massive fire, causing severe damage to station buildings and infrastructure.

Answer: True

The derailment resulted in explosions and a large fire, causing extensive damage to station buildings, infrastructure, and surrounding vehicles.

Related Concepts:

  • What were the immediate consequences of the 1997 Elsterwerda train derailment and explosions?: The derailment led to two subsequent explosions of the tank cars and a massive fire. This caused severe damage to the station's buildings, infrastructure, the initial fire trucks that responded, other vehicles, and the surrounding precinct. Tragically, two firefighters lost their lives due to the explosion, and several others sustained burns requiring hospital treatment.

The emergency response to the 1997 disaster involved 30 fire departments working for over 48 hours.

Answer: False

The emergency response involved 30 fire departments, but they worked for 34 hours, not over 48 hours.

Related Concepts:

  • What was the scale of the emergency response to the 1997 Elsterwerda train disaster?: The response to the 1997 disaster was extensive, involving 30 fire departments with 310 firefighters working in shifts, utilizing 62 vehicles over a period of 34 hours. Emergency rescue services also participated with 14 vehicles and two helicopters.

The 1997 petrol train disaster resulted in approximately 600 metric tonnes of petrol leaking into the soil and sewage system.

Answer: True

Approximately 600 metric tonnes of petrol leaked into the soil and sewage system as a consequence of the 1997 disaster.

Related Concepts:

  • What long-term environmental impact resulted from the 1997 petrol train disaster at Elsterwerda station?: The disaster resulted in approximately 600 metric tonnes of petrol leaking into the soil and the sewage system. Even ten years after the accident, petrol was still being extracted from the ground.

What type of cargo was involved in the severe train crash at Elsterwerda station in 1997?

Answer: Petrol tankers

The severe train crash in 1997 at Elsterwerda station involved a freight train carrying petrol tankers.

Related Concepts:

  • What significant event, besides its normal operations, is Elsterwerda station known for?: Elsterwerda station is notably known for a severe train crash that occurred in 1997. This incident involved a freight train carrying petrol tankers that derailed and subsequently exploded on the station premises.

What was the primary reason for the freight train derailment at Elsterwerda station on November 20, 1997?

Answer: The train traveling significantly over the speed limit

The primary cause of the freight train derailment on November 20, 1997, was the train exceeding the speed limit, traveling at 90 km/h in a 40 km/h zone.

Related Concepts:

  • What caused the major train derailment and fire at Elsterwerda station on November 20, 1997?: The serious accident on November 20, 1997, was caused by a freight train carrying 22 petrol-filled tank cars derailing at a set of points. The derailment occurred because the train was traveling at 90 km/h in a zone with a speed limit of 40 km/h.

What were some immediate consequences of the 1997 Elsterwerda train derailment and explosions?

Answer: Severe damage to station buildings and infrastructure, and the loss of two firefighters' lives.

Immediate consequences of the 1997 derailment included severe damage to station buildings and infrastructure, and tragically, the loss of two firefighters' lives.

Related Concepts:

  • What significant event, besides its normal operations, is Elsterwerda station known for?: Elsterwerda station is notably known for a severe train crash that occurred in 1997. This incident involved a freight train carrying petrol tankers that derailed and subsequently exploded on the station premises.

What was the scale of the emergency response to the 1997 Elsterwerda train disaster?

Answer: 30 fire departments with 310 firefighters and 62 vehicles over 34 hours.

The emergency response to the 1997 disaster involved 30 fire departments, 310 firefighters, 62 vehicles, and operated for 34 hours.

Related Concepts:

  • What significant event, besides its normal operations, is Elsterwerda station known for?: Elsterwerda station is notably known for a severe train crash that occurred in 1997. This incident involved a freight train carrying petrol tankers that derailed and subsequently exploded on the station premises.

According to the investigation, which of the following was a crucial error contributing to the 1997 Elsterwerda train accident?

Answer: The driver failing to properly connect brake hoses and open valves.

A crucial error identified in the investigation was the driver's failure to properly connect brake hoses and open valves, alongside other procedural failures during the brake test.

Related Concepts:

  • What specific errors contributed to the 1997 Elsterwerda train accident, according to the investigation?: The accident investigation revealed multiple errors during an engine replacement and brake test at the previous stop, Berlin-Grünau. These included the driver failing to properly connect brake hoses and open valves, and the train preparation technician misinterpreting brake pressure and resetting the brakes without informing the driver. Crucially, the actual brake test was never completed, leading the driver to believe the train was safe to depart with dysfunctional brakes.

Operational Landscape and Services

The RE 8 line runs towards Cottbus from Elsterwerda station.

Answer: False

The RE 8 line serves Elsterwerda station and runs towards Berlin Hauptbahnhof (Hbf), not Cottbus.

Related Concepts:

  • Which regional express RE lines serve Elsterwerda station, and what are their typical frequencies?: Elsterwerda station is served by two regional express lines: RE 8, which runs towards Berlin Hbf with a frequency of every 120 minutes, and RE 13, which connects to Cottbus operating Monday-Friday only, also with a 120-minute frequency.
  • What is the primary railway line that Elsterwerda station is situated on?: Elsterwerda station is located on the Berlin–Dresden railway line.

The RB 45 service, operated by Mitteldeutsche Regiobahn, connects Elsterwerda to Chemnitz Hbf.

Answer: True

The RB 45 regionalbahn service, operated by Mitteldeutsche Regiobahn, provides a connection between Elsterwerda and Chemnitz Hauptbahnhof (Hbf).

Related Concepts:

  • What regionalbahn RB services operate from Elsterwerda station?: Elsterwerda station is served by two regionalbahn lines: RB 31, which runs from Elsterwerda-Biehla through Elsterwerda towards Dresden, and RB 45, operated by Mitteldeutsche Regiobahn, which connects Elsterwerda to Chemnitz Hbf, with services running every 120 minutes, and sometimes every 60 minutes.

Which regional express line serves Elsterwerda station and runs towards Berlin Hbf?

Answer: RE 8

The RE 8 regional express line serves Elsterwerda station and operates towards Berlin Hauptbahnhof (Hbf).

Related Concepts:

  • Which regional express RE lines serve Elsterwerda station, and what are their typical frequencies?: Elsterwerda station is served by two regional express lines: RE 8, which runs towards Berlin Hbf with a frequency of every 120 minutes, and RE 13, which connects to Cottbus operating Monday-Friday only, also with a 120-minute frequency.
  • What is the primary railway line that Elsterwerda station is situated on?: Elsterwerda station is located on the Berlin–Dresden railway line.

Which regionalbahn line connects Elsterwerda to Chemnitz Hbf?

Answer: RB 45

The RB 45 regionalbahn line, operated by Mitteldeutsche Regiobahn, connects Elsterwerda to Chemnitz Hauptbahnhof (Hbf).

Related Concepts:

  • What regionalbahn RB services operate from Elsterwerda station?: Elsterwerda station is served by two regionalbahn lines: RB 31, which runs from Elsterwerda-Biehla through Elsterwerda towards Dresden, and RB 45, operated by Mitteldeutsche Regiobahn, which connects Elsterwerda to Chemnitz Hbf, with services running every 120 minutes, and sometimes every 60 minutes.
  • What is the primary railway line that Elsterwerda station is situated on?: Elsterwerda station is located on the Berlin–Dresden railway line.
  • Which regional express RE lines serve Elsterwerda station, and what are their typical frequencies?: Elsterwerda station is served by two regional express lines: RE 8, which runs towards Berlin Hbf with a frequency of every 120 minutes, and RE 13, which connects to Cottbus operating Monday-Friday only, also with a 120-minute frequency.

What is the DS100 code assigned to Elsterwerda station?

Answer: BEW

The DS100 code assigned to Elsterwerda station for operational and administrative purposes is BEW.

Related Concepts:

  • What is the DS100 code assigned to Elsterwerda station?: The DS100 code for Elsterwerda station is BEW.
  • What is the significance of the DS100 code mentioned for Elsterwerda station?: The DS100 code BEW is a standardized abbreviation used within the German railway network to uniquely identify Elsterwerda station for operational and administrative purposes.

Elsterwerda station is classified under which category within the German railway station classification system?

Answer: Category 4

Within the German railway station classification system, Elsterwerda station is assigned to Category 4.

Related Concepts:

  • What is the primary railway line that Elsterwerda station is situated on?: Elsterwerda station is located on the Berlin–Dresden railway line.
  • What category has Elsterwerda station been assigned within the German railway station classification system?: Elsterwerda station is classified under Category 4.
  • What is Elsterwerda station and where is it located?: Elsterwerda station is a railway station situated in the town of Elsterwerda, within the German state of Brandenburg. It is a key stop on the important Berlin–Dresden railway line.

What does the IBNR number 8010099 represent for Elsterwerda station?

Answer: An international identifier used for railway stations

The IBNR number 8010099 serves as an international identifier for Elsterwerda station within the railway network.

Related Concepts:

  • What does the IBNR number signify for Elsterwerda station?: The IBNR number 8010099 for Elsterwerda station is an international identifier used for railway stations.
  • What is the significance of the DS100 code mentioned for Elsterwerda station?: The DS100 code BEW is a standardized abbreviation used within the German railway network to uniquely identify Elsterwerda station for operational and administrative purposes.
  • What is the DS100 code assigned to Elsterwerda station?: The DS100 code for Elsterwerda station is BEW.

Post-Reunification and Contemporary Status

Train services resumed through Elsterwerda station shortly after the end of World War II, with the first train running to Munich.

Answer: False

Train services resumed shortly after World War II, with the first train running to Berlin on May 11, 1945, not Munich.

Related Concepts:

  • When did train services resume through Elsterwerda station after World War II, and what was the initial scale of railway employment?: Train services resumed through Elsterwerda station shortly after the end of World War II, with the first train running to Berlin on May 11, 1945. By July 1945, the station employed 210 railway workers, and later, the administration overseeing the station, locomotive depot, and Elsterwerda-Biehla station employed approximately 1,000 people.
  • What is the primary railway line that Elsterwerda station is situated on?: Elsterwerda station is located on the Berlin–Dresden railway line.
  • What is Elsterwerda station and where is it located?: Elsterwerda station is a railway station situated in the town of Elsterwerda, within the German state of Brandenburg. It is a key stop on the important Berlin–Dresden railway line.

Elsterwerda station's importance significantly increased after German reunification.

Answer: False

Following German reunification, Elsterwerda station's importance diminished, marked by the closure of its locomotive depot and relocation of track maintenance operations.

Related Concepts:

  • How did Elsterwerda station's significance change after German reunification?: Following the reunification of Germany, Elsterwerda station experienced significant changes and diminished in importance. Its locomotive depot was closed, and track maintenance operations were relocated. Many employees were either dismissed or transferred to other locations.
  • What is the primary railway line that Elsterwerda station is situated on?: Elsterwerda station is located on the Berlin–Dresden railway line.
  • When did train services resume through Elsterwerda station after World War II, and what was the initial scale of railway employment?: Train services resumed through Elsterwerda station shortly after the end of World War II, with the first train running to Berlin on May 11, 1945. By July 1945, the station employed 210 railway workers, and later, the administration overseeing the station, locomotive depot, and Elsterwerda-Biehla station employed approximately 1,000 people.

Elsterwerda station became a stop for Intercity IC trains starting in December 2017.

Answer: True

Elsterwerda station was integrated into the Intercity (IC) train network as a stop beginning in December 2017.

Related Concepts:

  • When did Elsterwerda station become a stop for Intercity IC trains?: Elsterwerda station was added as a stop for Intercity IC trains starting from December 10, 2017.
  • What types of long-distance train services call at Elsterwerda station as of 2024?: As of 2024, Elsterwerda station serves several long-distance train services, including ICE 21, ICE 27 which also operates as Railjet, IC 17, and FlixTrain FLX 30.
  • What specific track and platform improvements were made at Elsterwerda station between 2014 and 2016?: Between 2014 and 2016, Elsterwerda station saw the renewal of 3.6 kilometers of track and seven switches. A barrier-free pedestrian underpass with two lifts was constructed, along with a 320 meter long central platform, while other tracks and points were removed.

When did train services resume through Elsterwerda station after World War II?

Answer: May 11, 1945

Train services resumed through Elsterwerda station on May 11, 1945, shortly after the end of World War II, with the first train running to Berlin.

Related Concepts:

  • When did train services resume through Elsterwerda station after World War II, and what was the initial scale of railway employment?: Train services resumed through Elsterwerda station shortly after the end of World War II, with the first train running to Berlin on May 11, 1945. By July 1945, the station employed 210 railway workers, and later, the administration overseeing the station, locomotive depot, and Elsterwerda-Biehla station employed approximately 1,000 people.
  • When was the Elsterwerda station building reconstructed, and what was the outcome?: The station building at Elsterwerda underwent reconstruction between 1988 and 1991. This renovation resulted in a completely altered appearance for the building, and the new station layout was finalized in March 1992.
  • What was the fate of the Elsterwerda station building during World War II?: During World War II, on April 19, 1945, Elsterwerda station and its facilities were bombed. An ammunition train within the station was hit, causing explosions that severely damaged the railway premises and the town center. The upper storey of the station building was badly damaged and was not rebuilt afterward.

How did Elsterwerda station's significance change after German reunification?

Answer: It diminished, with its locomotive depot closing and operations relocating.

After German reunification, Elsterwerda station's significance decreased, evidenced by the closure of its locomotive depot and the relocation of track maintenance operations.

Related Concepts:

  • How did Elsterwerda station's significance change after German reunification?: Following the reunification of Germany, Elsterwerda station experienced significant changes and diminished in importance. Its locomotive depot was closed, and track maintenance operations were relocated. Many employees were either dismissed or transferred to other locations.
  • What is the primary railway line that Elsterwerda station is situated on?: Elsterwerda station is located on the Berlin–Dresden railway line.
  • When did train services resume through Elsterwerda station after World War II, and what was the initial scale of railway employment?: Train services resumed through Elsterwerda station shortly after the end of World War II, with the first train running to Berlin on May 11, 1945. By July 1945, the station employed 210 railway workers, and later, the administration overseeing the station, locomotive depot, and Elsterwerda-Biehla station employed approximately 1,000 people.

When did Elsterwerda station begin serving Intercity IC trains?

Answer: December 10, 2017

Elsterwerda station became a stop for Intercity (IC) trains starting on December 10, 2017.

Related Concepts:

  • When did Elsterwerda station become a stop for Intercity IC trains?: Elsterwerda station was added as a stop for Intercity IC trains starting from December 10, 2017.
  • When was the Elsterwerda station building reconstructed, and what was the outcome?: The station building at Elsterwerda underwent reconstruction between 1988 and 1991. This renovation resulted in a completely altered appearance for the building, and the new station layout was finalized in March 1992.
  • What types of long-distance train services call at Elsterwerda station as of 2024?: As of 2024, Elsterwerda station serves several long-distance train services, including ICE 21, ICE 27 which also operates as Railjet, IC 17, and FlixTrain FLX 30.

Home | Sitemaps | Contact | Terms | Privacy