Wiki2Web Studio

Create complete, beautiful interactive educational materials in less than 5 minutes.

Print flashcards, homework worksheets, exams/quizzes, study guides, & more.

Export your learner materials as an interactive game, a webpage, or FAQ style cheatsheet.

Unsaved Work Found!

It looks like you have unsaved work from a previous session. Would you like to restore it?


The Summit Arena and Lakewood Church Central Campus: A History

At a Glance

Title: The Summit Arena and Lakewood Church Central Campus: A History

Total Categories: 5

Category Stats

  • The Summit: Genesis and Construction (1975-1978): 7 flashcards, 7 questions
  • The Summit: Sports and Entertainment Hub (1975-2003): 19 flashcards, 26 questions
  • The Compaq Center Era (1998-2003): 5 flashcards, 6 questions
  • Transition to Lakewood Church Central Campus (2003-Present): 17 flashcards, 20 questions
  • Architectural, Financial, and Operational Details: 11 flashcards, 13 questions

Total Stats

  • Total Flashcards: 59
  • True/False Questions: 44
  • Multiple Choice Questions: 28
  • Total Questions: 72

Instructions

Click the button to expand the instructions for how to use the Wiki2Web Teacher studio in order to print, edit, and export data about The Summit Arena and Lakewood Church Central Campus: A History

Welcome to Your Curriculum Command Center

This guide will turn you into a Wiki2web Studio power user. Let's unlock the features designed to give you back your weekends.

The Core Concept: What is a "Kit"?

Think of a Kit as your all-in-one digital lesson plan. It's a single, portable file that contains every piece of content for a topic: your subject categories, a central image, all your flashcards, and all your questions. The true power of the Studio is speed—once a kit is made (or you import one), you are just minutes away from printing an entire set of coursework.

Getting Started is Simple:

  • Create New Kit: Start with a clean slate. Perfect for a brand-new lesson idea.
  • Import & Edit Existing Kit: Load a .json kit file from your computer to continue your work or to modify a kit created by a colleague.
  • Restore Session: The Studio automatically saves your progress in your browser. If you get interrupted, you can restore your unsaved work with one click.

Step 1: Laying the Foundation (The Authoring Tools)

This is where you build the core knowledge of your Kit. Use the left-side navigation panel to switch between these powerful authoring modules.

⚙️ Kit Manager: Your Kit's Identity

This is the high-level control panel for your project.

  • Kit Name: Give your Kit a clear title. This will appear on all your printed materials.
  • Master Image: Upload a custom cover image for your Kit. This is essential for giving your content a professional visual identity, and it's used as the main graphic when you export your Kit as an interactive game.
  • Topics: Create the structure for your lesson. Add topics like "Chapter 1," "Vocabulary," or "Key Formulas." All flashcards and questions will be organized under these topics.

🃏 Flashcard Author: Building the Knowledge Blocks

Flashcards are the fundamental concepts of your Kit. Create them here to define terms, list facts, or pose simple questions.

  • Click "➕ Add New Flashcard" to open the editor.
  • Fill in the term/question and the definition/answer.
  • Assign the flashcard to one of your pre-defined topics.
  • To edit or remove a flashcard, simply use the ✏️ (Edit) or ❌ (Delete) icons next to any entry in the list.

✍️ Question Author: Assessing Understanding

Create a bank of questions to test knowledge. These questions are the engine for your worksheets and exams.

  • Click "➕ Add New Question".
  • Choose a Type: True/False for quick checks or Multiple Choice for more complex assessments.
  • To edit an existing question, click the ✏️ icon. You can change the question text, options, correct answer, and explanation at any time.
  • The Explanation field is a powerful tool: the text you enter here will automatically appear on the teacher's answer key and on the Smart Study Guide, providing instant feedback.

🔗 Intelligent Mapper: The Smart Connection

This is the secret sauce of the Studio. The Mapper transforms your content from a simple list into an interconnected web of knowledge, automating the creation of amazing study guides.

  • Step 1: Select a question from the list on the left.
  • Step 2: In the right panel, click on every flashcard that contains a concept required to answer that question. They will turn green, indicating a successful link.
  • The Payoff: When you generate a Smart Study Guide, these linked flashcards will automatically appear under each question as "Related Concepts."

Step 2: The Magic (The Generator Suite)

You've built your content. Now, with a few clicks, turn it into a full suite of professional, ready-to-use materials. What used to take hours of formatting and copying-and-pasting can now be done in seconds.

🎓 Smart Study Guide Maker

Instantly create the ultimate review document. It combines your questions, the correct answers, your detailed explanations, and all the "Related Concepts" you linked in the Mapper into one cohesive, printable guide.

📝 Worksheet & 📄 Exam Builder

Generate unique assessments every time. The questions and multiple-choice options are randomized automatically. Simply select your topics, choose how many questions you need, and generate:

  • A Student Version, clean and ready for quizzing.
  • A Teacher Version, complete with a detailed answer key and the explanations you wrote.

🖨️ Flashcard Printer

Forget wrestling with table layouts in a word processor. Select a topic, choose a cards-per-page layout, and instantly generate perfectly formatted, print-ready flashcard sheets.

Step 3: Saving and Collaborating

  • 💾 Export & Save Kit: This is your primary save function. It downloads the entire Kit (content, images, and all) to your computer as a single .json file. Use this to create permanent backups and share your work with others.
  • ➕ Import & Merge Kit: Combine your work. You can merge a colleague's Kit into your own or combine two of your lessons into a larger review Kit.

You're now ready to reclaim your time.

You're not just a teacher; you're a curriculum designer, and this is your Studio.

This page is an interactive visualization based on the Wikipedia article "Lakewood Church Central Campus" (opens in new tab) and its cited references.

Text content is available under the Creative Commons Attribution-ShareAlike 4.0 License (opens in new tab). Additional terms may apply.

Disclaimer: This website is for informational purposes only and does not constitute any kind of advice. The information is not a substitute for consulting official sources or records or seeking advice from qualified professionals.


Owned and operated by Artificial General Intelligence LLC, a Michigan Registered LLC
Prompt engineering done with Gracekits.com
All rights reserved
Sitemaps | Contact

Export Options





Study Guide: The Summit Arena and Lakewood Church Central Campus: A History

Study Guide: The Summit Arena and Lakewood Church Central Campus: A History

The Summit: Genesis and Construction (1975-1978)

The facility currently known as Lakewood Church Central Campus was originally constructed as a multi-purpose sports arena designated as The Summit.

Answer: True

The structure's initial purpose was as a sports arena, named The Summit, prior to its conversion into a church facility.

Related Concepts:

  • What were the prior designations of the facility currently identified as Lakewood Church Central Campus?: Before becoming Lakewood Church Central Campus, the building was known as The Summit from 1975 to 1998. It was subsequently renamed Compaq Center from 1998 to 2003, following a naming rights deal. During renovations from 2003 to 2005, it was referred to as the Lakewood International Center.
  • Describe the primary function of the Lakewood Church Central Campus in contemporary times.: Today, the Lakewood Church Central Campus serves as the main facility for Lakewood Church, hosting its services and activities.
  • Define the Lakewood Church Central Campus.: The Lakewood Church Central Campus is the primary facility for Lakewood Church, a non-denominational evangelical Christian megachurch located in Houston, Texas. It is situated five miles southwest of Downtown Houston, adjacent to Greenway Plaza.

The Summit commenced operations on November 1, 1975, with an initial construction expenditure of $27 million, which equates to approximately $191 million in 2024 U.S. dollars.

Answer: True

The venue's inauguration date was November 1, 1975, with an initial construction cost of $27 million, adjusted for inflation to approximately $191 million in 2024.

Related Concepts:

  • Quantify the initial construction cost of The Summit and its approximate equivalent value in 2024 U.S. dollars.: The initial construction cost of The Summit was US$27 million. In 2024 dollars, this is equivalent to approximately $191 million.

The construction of The Summit was primarily driven by the absence of an adequate indoor arena to accommodate the Houston Rockets NBA franchise.

Answer: True

The establishment of The Summit was a direct response to the Houston Rockets' need for a suitable home venue, as existing facilities were deemed insufficient.

Related Concepts:

  • Articulate the rationale behind the construction of The Summit.: The establishment of The Summit was a direct response to the Houston Rockets' need for a suitable home venue, as existing facilities were deemed insufficient.

The Sam Houston Coliseum was deemed inadequate for hosting a major sports franchise, which was a primary factor necessitating the construction of The Summit.

Answer: True

The inadequacy of the Sam Houston Coliseum was a critical precursor to the decision to build a new, larger arena.

Related Concepts:

  • Identify the name of the first arena in Houston considered suitable for a major sports franchise, which The Summit effectively replaced.: The Sam Houston Coliseum was the largest arena in Houston at the time, but it was considered inadequate for hosting a major sports franchise like the Houston Rockets, leading to the need for The Summit.

What was the original designation of the facility that is presently known as Lakewood Church Central Campus?

Answer: The Summit

The building's initial identity was established as The Summit upon its completion.

Related Concepts:

  • What were the prior designations of the facility currently identified as Lakewood Church Central Campus?: Before becoming Lakewood Church Central Campus, the building was known as The Summit from 1975 to 1998. It was subsequently renamed Compaq Center from 1998 to 2003, following a naming rights deal. During renovations from 2003 to 2005, it was referred to as the Lakewood International Center.

What was the initial financial expenditure for the construction of The Summit?

Answer: $27 million

The initial capital investment for constructing The Summit was $27 million.

Related Concepts:

  • Quantify the initial construction cost of The Summit and its approximate equivalent value in 2024 U.S. dollars.: The initial construction cost of The Summit was US$27 million. In 2024 dollars, this is equivalent to approximately $191 million.
  • State the official opening date of the building as a sports arena and its initial construction cost.: The building, initially named The Summit, opened on November 1, 1975. Its initial construction cost was US$27 million.

What were the primary motivations behind the original construction of The Summit?

Answer: Both B and C

The Summit was conceived to fulfill the need for a suitable venue for the Houston Rockets and to replace the inadequate Sam Houston Coliseum.

Related Concepts:

  • Articulate the rationale behind the construction of The Summit.: The establishment of The Summit was a direct response to the Houston Rockets' need for a suitable home venue, as existing facilities were deemed insufficient.
  • Discuss the significance of The Summit relative to NBA arenas during its construction era.: The Summit represented a new generation of lavish sports arenas, featuring extensive amenities. Its construction contributed to the NBA's growth from a second-tier sport into a major entertainment industry.

The Summit: Sports and Entertainment Hub (1975-2003)

The inaugural event at The Summit was a benefit concert titled "Heart To Heart," headlined by the renowned vocalist Andy Williams.

Answer: True

The opening night of The Summit featured the benefit event "Heart To Heart," with Andy Williams serving as the headline performer.

Related Concepts:

  • Describe the event that constituted the opening night of The Summit.: The opening night of The Summit featured the benefit event "Heart To Heart," with Andy Williams serving as the headline performer.

During its tenure as a sports venue, the facility served as the home for numerous professional teams, including the Houston Rockets (NBA), Houston Aeros (WHA/IHL/AHL), Houston Summit (MISL), Houston Hotshots (CISL), Houston Thunderbears/Texas Terror (AFL), and the Houston Comets (WNBA).

Answer: True

The venue's versatility allowed it to host a diverse array of professional sports franchises across multiple leagues.

Related Concepts:

  • What was the initial intended purpose of the structure now recognized as Lakewood Church Central Campus?: Originally, the building served as a multi-purpose sports arena from 1975 to 2003. It hosted professional sports teams, most notably the NBA's Houston Rockets, and was also used for concerts and other large events.
  • Enumerate the teams that have utilized the Lakewood Church Central Campus as their home venue across its history.: The venue has been home to several professional sports teams, including the Houston Rockets (NBA), Houston Aeros (WHA/IHL/AHL), Houston Summit (MISL), Houston Hotshots (CISL), Houston Thunderbears/Texas Terror (AFL), and Houston Comets (WNBA). Since 2005, it has served as the home for Lakewood Church.
  • List the interim venues utilized by the Houston Rockets prior to the completion of The Summit.: Before The Summit was completed, the Houston Rockets played their home games in various local facilities, including Hofheinz Pavilion and the Astrodome.

The Summit served as the venue for the NBA Finals in 1981, 1986, 1994, and 1995, and hosted the WNBA championships consecutively from 1997 to 2000.

Answer: True

The arena's significance in professional basketball is underscored by its hosting of multiple NBA Finals and all WNBA championship series during the league's formative years.

Related Concepts:

  • Discuss the significance of the 1994 and 1995 NBA Finals hosted at The Summit.: The Summit hosted the deciding games of the 1994 and 1995 NBA Finals, which were won by the Houston Rockets, and the subsequent championship celebrations took place there.
  • Enumerate the significant sporting events hosted at The Summit.: The Summit hosted multiple NBA Finals in 1981, 1986, 1994, and 1995. It also hosted the WNBA championships from 1997 through 2000, all of which were won by the Houston Comets. Additionally, it hosted professional wrestling events, including the WWF's Royal Rumble in 1989.

The Summit was recognized as a state-of-the-art venue, contributing significantly to the burgeoning popularity of the NBA during the era of its construction.

Answer: True

The arena's advanced design and amenities played a role in the NBA's expansion and increased public engagement during the 1970s and 1980s.

Related Concepts:

  • Discuss the significance of The Summit relative to NBA arenas during its construction era.: The Summit represented a new generation of lavish sports arenas, featuring extensive amenities. Its construction contributed to the NBA's growth from a second-tier sport into a major entertainment industry.

The "P-Funk Earth Tour" stop at The Summit on October 31, 1976, included a performance by Parliament-Funkadelic, supported by Bootsy's Rubber Band.

Answer: True

This concert date marked a significant performance by Parliament-Funkadelic during their "P-Funk Earth Tour".

Related Concepts:

  • List the artists who performed during the "P-Funk Earth Tour" at The Summit.: Parliament-Funkadelic performed during the "P-Funk Earth Tour" at The Summit on October 31, 1976, with Bootsy's Rubber Band as the opening act. This performance was recorded and released as *The Mothership Connection – Live from Houston*.

Actor John Travolta made a guest appearance during the Bee Gees concert on June 30, 1979, coinciding with his filming of the movie *Urban Cowboy*.

Answer: True

The appearance of John Travolta during the Bee Gees concert highlighted the venue's role in popular culture and film production.

Related Concepts:

  • Describe the significant event that transpired during the Bee Gees concert on June 30, 1979.: During the Bee Gees' concert on June 30, 1979, John Travolta, who was filming the movie *Urban Cowboy*, made a special appearance at the show.

The Bruce Springsteen concert held on December 8, 1978, was later released on DVD in 2010 as a component of the *The Promise: The Darkness on the Edge of Town Story* box set.

Answer: True

This concert documentation demonstrates the historical significance of performances at The Summit, with its release years after the event.

Related Concepts:

  • Explain how the Bruce Springsteen concert on December 8, 1978, was documented.: The Bruce Springsteen concert on December 8, 1978, as part of the Darkness Tour, was released on DVD in 2010 as part of *The Promise: The Darkness on the Edge of Town Story* box set.

The concerts performed by Journey on November 5-6, 1981, were documented for broadcast on MTV and subsequently released as part of their *Greatest Hits Live* album.

Answer: True

The recording of Journey's performances highlights the venue's capability to host and document major musical acts for broadcast and album release.

Related Concepts:

  • Detail the unique aspects of the Journey concerts held on November 5-6, 1981.: The Journey concerts on November 5-6, 1981, as part of the Escape Tour, were recorded for broadcast on the King Biscuit Flower Hour and MTV. Parts of the show were later released on their *Greatest Hits Live* album, and the full concert was released as *Live in Houston 1981: The Escape Tour*.

The visual material for Cyndi Lauper's music video "Money Changes Everything" was captured during her concert performance at The Summit on October 10, 1984.

Answer: True

This event marks the use of The Summit as a location for the production of music videos for prominent artists.

Related Concepts:

  • Describe The Summit's role in the filming of Cyndi Lauper's "Money Changes Everything" video.: The performance by Cyndi Lauper at The Summit on October 10, 1984, provided the footage for her promotional video for the song "Money Changes Everything." The show was also broadcast locally over the radio that evening.

The Run-DMC "Run's House Tour" stop at The Summit on July 14, 1988, included multiple opening acts, not solely Public Enemy.

Answer: True

The tour featured a comprehensive lineup of supporting artists, contrary to the assertion that only one act performed.

Related Concepts:

  • List the artists who performed during the Run-DMC "Run's House Tour" at The Summit on July 14, 1988.: The Run-DMC "Run's House Tour" at The Summit featured opening acts including Public Enemy, DJ Jazzy Jeff & the Fresh Prince, EPMD, and J. J. Fad.

N.W.A's "Straight Outta Compton Tour" concert at The Summit on June 11, 1989, featured supporting performances by artists including Kid 'n Play and Sir Mix-a-Lot.

Answer: True

This concert was part of a significant tour that included several prominent artists from the hip-hop genre.

Related Concepts:

  • Discuss the significance of the N.W.A concert on June 11, 1989.: The N.W.A concert on June 11, 1989, was part of their "Straight Outta Compton Tour" and featured supporting acts like Too Short, Kid 'n Play, Kwamé, Sir Mix-a-Lot, and J. J. Fad.

Madonna performed two shows at The Summit during her 1990 Blond Ambition World Tour.

Answer: True

Madonna's Blond Ambition World Tour included two performances at The Summit in May 1990.

Related Concepts:

  • State the number of shows Madonna performed at The Summit during her Blond Ambition World Tour.: Madonna performed two shows at The Summit on May 4-5, 1990, as part of her Blond Ambition World Tour, with Technotronic as the opening act.

The Houston Comets secured multiple WNBA championships during their tenure as tenants at The Summit.

Answer: True

The venue served as the home court for the dominant Houston Comets franchise during their championship-winning seasons.

Related Concepts:

  • Identify the WNBA team that secured championships at The Summit.: The Houston Comets won the WNBA championships from 1997 through 2000 at The Summit.
  • Enumerate the significant sporting events hosted at The Summit.: The Summit hosted multiple NBA Finals in 1981, 1986, 1994, and 1995. It also hosted the WNBA championships from 1997 through 2000, all of which were won by the Houston Comets. Additionally, it hosted professional wrestling events, including the WWF's Royal Rumble in 1989.

The Houston Aeros, a professional ice hockey team, utilized The Summit as their home venue during their participation in the International Hockey League (IHL).

Answer: True

The Houston Aeros were one of several professional sports franchises that called The Summit home.

Related Concepts:

  • Identify the WHA team that played its home games at The Summit.: The Houston Aeros played in the World Hockey Association (WHA) at The Summit from 1975 to 1978.

The professional soccer team known as the Houston Summit competed in the Major Indoor Soccer League (MISL) between the years 1978 and 1980.

Answer: True

This team represented indoor soccer at The Summit during its brief existence in the MISL.

Related Concepts:

  • Identify the MISL team that played its home games at The Summit.: The Houston Summit team played in the Major Indoor Soccer League (MISL) from 1978 to 1980.

The Houston Thunderbears, alternatively known as the Texas Terror, competed in the Arena Football League (AFL) utilizing The Summit as their home arena.

Answer: True

The venue hosted arena football teams, including the Houston Thunderbears/Texas Terror, during their respective seasons.

Related Concepts:

  • Identify the AFL team that played its home games at The Summit.: The Houston Thunderbears, also known as the Texas Terror, played in the Arena Football League (AFL) at The Summit from 1996 to 2001.

The Summit hosted the decisive games of the 1994 and 1995 NBA Finals, both of which concluded with victories for the Houston Rockets.

Answer: True

The venue witnessed the culmination of the NBA season in consecutive years, with the Houston Rockets achieving championship success.

Related Concepts:

  • Discuss the significance of the 1994 and 1995 NBA Finals hosted at The Summit.: The Summit hosted the deciding games of the 1994 and 1995 NBA Finals, which were won by the Houston Rockets, and the subsequent championship celebrations took place there.
  • Enumerate the significant sporting events hosted at The Summit.: The Summit hosted multiple NBA Finals in 1981, 1986, 1994, and 1995. It also hosted the WNBA championships from 1997 through 2000, all of which were won by the Houston Comets. Additionally, it hosted professional wrestling events, including the WWF's Royal Rumble in 1989.

Which professional sports franchise achieved the most significant recognition while utilizing The Summit as its primary venue?

Answer: The Houston Rockets (NBA)

The Houston Rockets' tenure at The Summit is widely considered the most prominent association between a team and the venue.

Related Concepts:

  • Enumerate the significant sporting events hosted at The Summit.: The Summit hosted multiple NBA Finals in 1981, 1986, 1994, and 1995. It also hosted the WNBA championships from 1997 through 2000, all of which were won by the Houston Comets. Additionally, it hosted professional wrestling events, including the WWF's Royal Rumble in 1989.
  • Discuss the significance of the 1994 and 1995 NBA Finals hosted at The Summit.: The Summit hosted the deciding games of the 1994 and 1995 NBA Finals, which were won by the Houston Rockets, and the subsequent championship celebrations took place there.

Who served as the headline performer for the "Heart To Heart" event on the inaugural night of The Summit?

Answer: Andy Williams

Andy Williams was the featured artist for the opening night benefit event.

Related Concepts:

  • Describe the event that constituted the opening night of The Summit.: The opening night of The Summit featured the benefit event "Heart To Heart," with Andy Williams serving as the headline performer.

Identify the professional sports team among the options provided that did not utilize The Summit/Compaq Center as its home venue.

Answer: Houston Oilers (NFL)

The Houston Oilers, an NFL team, never played their home games at The Summit/Compaq Center.

Related Concepts:

  • Enumerate the significant sporting events hosted at The Summit.: The Summit hosted multiple NBA Finals in 1981, 1986, 1994, and 1995. It also hosted the WNBA championships from 1997 through 2000, all of which were won by the Houston Comets. Additionally, it hosted professional wrestling events, including the WWF's Royal Rumble in 1989.

Identify the major sporting event finals that The Summit hosted on multiple occasions.

Answer: NBA Finals

The NBA Finals were held at The Summit in multiple years, underscoring its significance in professional basketball.

Related Concepts:

  • Discuss the significance of the 1994 and 1995 NBA Finals hosted at The Summit.: The Summit hosted the deciding games of the 1994 and 1995 NBA Finals, which were won by the Houston Rockets, and the subsequent championship celebrations took place there.
  • Enumerate the significant sporting events hosted at The Summit.: The Summit hosted multiple NBA Finals in 1981, 1986, 1994, and 1995. It also hosted the WNBA championships from 1997 through 2000, all of which were won by the Houston Comets. Additionally, it hosted professional wrestling events, including the WWF's Royal Rumble in 1989.

The concert footage of which artist, recorded at The Summit, was utilized for the promotional video of the song "Money Changes Everything"?

Answer: Cyndi Lauper

Cyndi Lauper's performance at The Summit provided the visual content for her music video.

Related Concepts:

  • Describe The Summit's role in the filming of Cyndi Lauper's "Money Changes Everything" video.: The performance by Cyndi Lauper at The Summit on October 10, 1984, provided the footage for her promotional video for the song "Money Changes Everything." The show was also broadcast locally over the radio that evening.

The Run-DMC "Run's House Tour" at The Summit featured which ensemble of opening acts?

Answer: Public Enemy, DJ Jazzy Jeff & the Fresh Prince, EPMD, and J. J. Fad

The tour's supporting lineup included Public Enemy, DJ Jazzy Jeff & the Fresh Prince, EPMD, and J. J. Fad.

Related Concepts:

  • List the artists who performed during the Run-DMC "Run's House Tour" at The Summit on July 14, 1988.: The Run-DMC "Run's House Tour" at The Summit featured opening acts including Public Enemy, DJ Jazzy Jeff & the Fresh Prince, EPMD, and J. J. Fad.

What was the significance of the N.W.A concert held at The Summit on June 11, 1989?

Answer: It was part of their "Straight Outta Compton Tour" and featured several notable supporting acts.

The concert was a notable stop on N.W.A's "Straight Outta Compton Tour" and featured a diverse array of supporting artists.

Related Concepts:

  • Discuss the significance of the N.W.A concert on June 11, 1989.: The N.W.A concert on June 11, 1989, was part of their "Straight Outta Compton Tour" and featured supporting acts like Too Short, Kid 'n Play, Kwamé, Sir Mix-a-Lot, and J. J. Fad.

How many performances did Madonna conduct at The Summit as part of her 1990 Blond Ambition World Tour?

Answer: Two

Madonna held two concerts at The Summit during this tour.

Related Concepts:

  • State the number of shows Madonna performed at The Summit during her Blond Ambition World Tour.: Madonna performed two shows at The Summit on May 4-5, 1990, as part of her Blond Ambition World Tour, with Technotronic as the opening act.

Identify the WNBA team that achieved championship victories at The Summit during the period of 1997 to 2000.

Answer: Houston Comets

The Houston Comets were the dominant WNBA franchise during this era, securing multiple championships at The Summit.

Related Concepts:

  • Identify the WNBA team that secured championships at The Summit.: The Houston Comets won the WNBA championships from 1997 through 2000 at The Summit.
  • Enumerate the significant sporting events hosted at The Summit.: The Summit hosted multiple NBA Finals in 1981, 1986, 1994, and 1995. It also hosted the WNBA championships from 1997 through 2000, all of which were won by the Houston Comets. Additionally, it hosted professional wrestling events, including the WWF's Royal Rumble in 1989.

The Compaq Center Era (1998-2003)

In 1998, the venue was rebranded as the Compaq Center subsequent to a naming rights agreement with Compaq Computer Corporation, valued at an annual sum of $900,000.

Answer: True

The naming rights agreement with Compaq Computer Corporation marked a new phase in the venue's history, officially renaming it the Compaq Center.

Related Concepts:

  • Explain the process by which The Summit was renamed the Compaq Center.: In 1998, the arena sold its naming rights to Compaq Computer Corporation, a Houston-based technology firm. This deal, worth $900,000 per year for five years, led to the venue being renamed Compaq Center.

The Arena Operating Company was the entity holding the lease for the Compaq Center during the period when sports teams utilized it as their home venue.

Answer: True

The lease agreement with The Arena Operating Company governed the usage of the Compaq Center by its sports tenants.

Related Concepts:

  • Identify the name of the arena operating company that held the lease on the Compaq Center.: The Arena Operating Company held the lease on the Compaq Center.

The naming rights agreement with Compaq Computer Corporation for the venue spanned five years, from 1998 to 2003.

Answer: True

The naming rights deal with Compaq Computer Corporation was established for a five-year term, concluding in 2003.

Related Concepts:

  • Specify the duration of the naming rights deal with Compaq Computer Corporation.: The naming rights deal with Compaq Computer Corporation was for five years, from 1998 until 2003.
  • Explain the process by which The Summit was renamed the Compaq Center.: In 1998, the arena sold its naming rights to Compaq Computer Corporation, a Houston-based technology firm. This deal, worth $900,000 per year for five years, led to the venue being renamed Compaq Center.

The Compaq Center in San Jose, California, is a distinct venue and not the same facility formerly known as The Summit in Houston.

Answer: True

It is important to distinguish The Summit/Compaq Center in Houston from other venues that may share similar names, such as the Compaq Center in San Jose.

Related Concepts:

  • Specify the name of the arena in San Jose, California, which also bore the designation Compaq Center.: There was another arena named the Compaq Center in San Jose, California, which has since been renamed the SAP Center.

Which corporate entity's name was prominently associated with the arena during the period spanning 1998 to 2003?

Answer: Compaq

Compaq Computer Corporation held the naming rights for the arena during this specific timeframe.

Related Concepts:

  • Explain the process by which The Summit was renamed the Compaq Center.: In 1998, the arena sold its naming rights to Compaq Computer Corporation, a Houston-based technology firm. This deal, worth $900,000 per year for five years, led to the venue being renamed Compaq Center.
  • Identify the name of the arena operating company that held the lease on the Compaq Center.: The Arena Operating Company held the lease on the Compaq Center.

What was the annual financial revenue derived from the naming rights agreement with Compaq Computer Corporation?

Answer: $900,000

The naming rights deal generated an annual revenue of $900,000.

Related Concepts:

  • Quantify the annual revenue generated from the Compaq naming rights deal.: The naming rights deal with Compaq generated $900,000 per year.
  • Explain the process by which The Summit was renamed the Compaq Center.: In 1998, the arena sold its naming rights to Compaq Computer Corporation, a Houston-based technology firm. This deal, worth $900,000 per year for five years, led to the venue being renamed Compaq Center.

Transition to Lakewood Church Central Campus (2003-Present)

The Lakewood Church Central Campus is located in Houston, Texas, approximately five miles southwest of the city center.

Answer: True

The Lakewood Church Central Campus is situated in Houston, Texas, approximately five miles southwest of Downtown Houston.

Related Concepts:

  • State the approximate distance of the Lakewood Church Central Campus from Downtown Houston.: The Lakewood Church Central Campus is located approximately five miles southwest of Downtown Houston.
  • Specify the geographical location of the Lakewood Church Central Campus.: The Lakewood Church Central Campus is located in Houston, Texas, specifically at 3700 Southwest Freeway. It is situated approximately five miles southwest of Downtown Houston and is adjacent to Greenway Plaza.

The financial outlay for the renovation project to transform the arena into Lakewood Church's facility amounted to $95 million, equivalent to approximately $158 million in 2024 U.S. dollars.

Answer: True

The extensive renovation required a significant investment of $95 million, adjusted to approximately $158 million in 2024 currency.

Related Concepts:

  • State the renovation cost for converting the arena into Lakewood Church Central Campus and its approximate 2024 equivalent value.: The renovation cost to convert the arena into the church's facility was $95 million. In 2024 dollars, this is equivalent to approximately $158 million.
  • Detail the significant renovations undertaken by Lakewood Church subsequent to leasing the building.: Lakewood Church invested $95 million in renovations that took over 15 months to complete. These renovations included adding five stories to increase capacity and reconfiguring the space to suit the church's needs.

The venue ceased its operations as a sports arena on December 1, 2003, and subsequently commenced its function as Lakewood Church Central Campus on July 16, 2005.

Answer: True

The transition from a sports venue to a religious facility occurred over a period of approximately 19 months, from December 2003 to July 2005.

Related Concepts:

  • Specify the date The Summit ceased sports arena operations and the date it reopened as Lakewood Church.: The building closed as a sports arena on December 1, 2003. It reopened as Lakewood Church Central Campus on July 16, 2005, after extensive renovations.

The departure of sports franchises from the Compaq Center in 2003 was primarily attributed to the expiration of the arena's lease and the teams' pursuit of more modern facilities.

Answer: True

The relocation of sports teams was driven by the conclusion of the lease agreement for the aging venue and the availability of newer arenas.

Related Concepts:

  • Articulate the factors that precipitated the departure of sports teams from The Summit/Compaq Center.: The sports teams moved out of the venue in 2003 because the lease for the aging arena was expiring, and tenants were advocating for a new, more modern facility. The new Toyota Center opened in downtown Houston that year, serving as the replacement venue.

Lakewood Church finalized the acquisition of the former Compaq Center through a direct purchase from the City of Houston in March 2010, for a sum of $7.5 million.

Answer: True

The property transfer occurred in March 2010, when Lakewood Church purchased the facility outright from the municipal government for $7.5 million.

Related Concepts:

  • State the sale price at which Lakewood Church acquired the former Compaq Center from the city.: Lakewood Church purchased the former Compaq Center from the City of Houston for $7.5 million.
  • Specify the date Lakewood Church purchased the building outright from the City of Houston.: Lakewood Church announced its intention to purchase the campus outright from the City of Houston in March 2010, and the Houston City Council voted to approve the sale on March 31, 2010.

The renovation project undertaken by Lakewood Church involved the addition of five stories to the existing structure, thereby enhancing its capacity.

Answer: True

A significant architectural modification during the renovation was the vertical expansion of the building by five stories.

Related Concepts:

  • Detail the significant renovations undertaken by Lakewood Church subsequent to leasing the building.: Lakewood Church invested $95 million in renovations that took over 15 months to complete. These renovations included adding five stories to increase capacity and reconfiguring the space to suit the church's needs.
  • State the number of stories added to the building during the renovations for Lakewood Church.: Five stories were added to the building during the renovations to accommodate Lakewood Church's needs.

The final concert staged at the venue prior to its conversion into Lakewood Church was performed by ZZ Top on November 22, 2003.

Answer: True

ZZ Top's performance marked the conclusion of the venue's operational history as a concert arena.

Related Concepts:

  • Identify the final concert held at The Summit/Compaq Center prior to its renovation into a church.: The last concert held at the venue before its renovation into Lakewood Church was by ZZ Top on November 22, 2003, as part of their Beer Drinkers and Hell Raisers Tour.

During the renovations for Lakewood Church, the building's height was increased by the addition of five stories.

Answer: True

The vertical expansion of the structure involved adding five stories to accommodate the expanded needs of Lakewood Church.

Related Concepts:

  • Detail the significant renovations undertaken by Lakewood Church subsequent to leasing the building.: Lakewood Church invested $95 million in renovations that took over 15 months to complete. These renovations included adding five stories to increase capacity and reconfiguring the space to suit the church's needs.
  • State the number of stories added to the building during the renovations for Lakewood Church.: Five stories were added to the building during the renovations to accommodate Lakewood Church's needs.

The comprehensive renovation process to convert the arena into a church facility required over fifteen months to complete.

Answer: True

The extensive conversion project spanned more than fifteen months, indicating a substantial undertaking.

Related Concepts:

  • Provide the approximate duration of the renovations undertaken to convert the arena into a church.: The renovations to convert the arena into a church took over 15 months to complete.

The Lakewood Church Central Campus is geographically situated approximately five miles southwest of Downtown Houston.

Answer: True

The campus's proximity to Downtown Houston is a key locational characteristic.

Related Concepts:

  • State the approximate distance of the Lakewood Church Central Campus from Downtown Houston.: The Lakewood Church Central Campus is located approximately five miles southwest of Downtown Houston.
  • Specify the geographical location of the Lakewood Church Central Campus.: The Lakewood Church Central Campus is located in Houston, Texas, specifically at 3700 Southwest Freeway. It is situated approximately five miles southwest of Downtown Houston and is adjacent to Greenway Plaza.

Currently, the Lakewood Church Central Campus primarily functions as a religious facility, not as a venue for professional basketball games.

Answer: True

The facility's primary use has transitioned from sports and entertainment to religious services and community activities.

Related Concepts:

  • Describe the primary function of the Lakewood Church Central Campus in contemporary times.: Today, the Lakewood Church Central Campus serves as the main facility for Lakewood Church, hosting its services and activities.

The sale of the former Compaq Center to Lakewood Church received formal approval from the Houston City Council on March 31, 2010.

Answer: True

The City Council's approval marked a critical step in the transfer of ownership from the municipality to Lakewood Church.

Related Concepts:

  • Specify the date Lakewood Church purchased the building outright from the City of Houston.: Lakewood Church announced its intention to purchase the campus outright from the City of Houston in March 2010, and the Houston City Council voted to approve the sale on March 31, 2010.
  • Describe the process by which Lakewood Church acquired the former Compaq Center.: After the sports teams moved out in 2003, the City of Houston leased the arena to Lakewood Church. The church invested significantly in renovations and eventually purchased the building outright from the city in March 2010 for $7.5 million, terminating its lease.

What was the total financial expenditure for the renovations undertaken by Lakewood Church to convert the arena?

Answer: $95 million

The conversion project required an investment of $95 million.

Related Concepts:

  • State the renovation cost for converting the arena into Lakewood Church Central Campus and its approximate 2024 equivalent value.: The renovation cost to convert the arena into the church's facility was $95 million. In 2024 dollars, this is equivalent to approximately $158 million.
  • Detail the significant renovations undertaken by Lakewood Church subsequent to leasing the building.: Lakewood Church invested $95 million in renovations that took over 15 months to complete. These renovations included adding five stories to increase capacity and reconfiguring the space to suit the church's needs.

On what date did the building formally conclude its operations as a sports arena?

Answer: December 1, 2003

The venue's final day of operation as a sports arena was December 1, 2003.

Related Concepts:

  • Specify the date The Summit ceased sports arena operations and the date it reopened as Lakewood Church.: The building closed as a sports arena on December 1, 2003. It reopened as Lakewood Church Central Campus on July 16, 2005, after extensive renovations.

What were the principal reasons for the sports teams vacating The Summit/Compaq Center in 2003?

Answer: The lease was expiring and tenants sought a newer facility.

The expiration of the lease and the availability of newer facilities were the primary drivers for the teams' departure.

Related Concepts:

  • Articulate the factors that precipitated the departure of sports teams from The Summit/Compaq Center.: The sports teams moved out of the venue in 2003 because the lease for the aging arena was expiring, and tenants were advocating for a new, more modern facility. The new Toyota Center opened in downtown Houston that year, serving as the replacement venue.

What was the acquisition price when Lakewood Church purchased the former Compaq Center directly from the City of Houston?

Answer: $7.5 million

The transaction involved Lakewood Church acquiring the property for $7.5 million.

Related Concepts:

  • State the sale price at which Lakewood Church acquired the former Compaq Center from the city.: Lakewood Church purchased the former Compaq Center from the City of Houston for $7.5 million.
  • Specify the date Lakewood Church purchased the building outright from the City of Houston.: Lakewood Church announced its intention to purchase the campus outright from the City of Houston in March 2010, and the Houston City Council voted to approve the sale on March 31, 2010.

What notable structural enhancement was incorporated during the renovations undertaken for Lakewood Church?

Answer: Five additional stories

The addition of five stories represented a major structural modification to increase the building's capacity.

Related Concepts:

  • Detail the significant renovations undertaken by Lakewood Church subsequent to leasing the building.: Lakewood Church invested $95 million in renovations that took over 15 months to complete. These renovations included adding five stories to increase capacity and reconfiguring the space to suit the church's needs.
  • State the number of stories added to the building during the renovations for Lakewood Church.: Five stories were added to the building during the renovations to accommodate Lakewood Church's needs.

Identify the musical group that performed the final concert at the venue prior to its conversion into Lakewood Church.

Answer: ZZ Top

ZZ Top delivered the final concert performance at the venue before its transformation into Lakewood Church.

Related Concepts:

  • Identify the final concert held at The Summit/Compaq Center prior to its renovation into a church.: The last concert held at the venue before its renovation into Lakewood Church was by ZZ Top on November 22, 2003, as part of their Beer Drinkers and Hell Raisers Tour.

What is the approximate distance between the Lakewood Church Central Campus and Downtown Houston?

Answer: 5 miles

The campus is located approximately five miles from the central business district of Houston.

Related Concepts:

  • State the approximate distance of the Lakewood Church Central Campus from Downtown Houston.: The Lakewood Church Central Campus is located approximately five miles southwest of Downtown Houston.
  • Specify the geographical location of the Lakewood Church Central Campus.: The Lakewood Church Central Campus is located in Houston, Texas, specifically at 3700 Southwest Freeway. It is situated approximately five miles southwest of Downtown Houston and is adjacent to Greenway Plaza.

What is the principal current function of the facility formerly designated as The Summit/Compaq Center?

Answer: The Central Campus facility for Lakewood Church

The building now serves as the Central Campus facility for Lakewood Church.

Related Concepts:

  • Describe the primary function of the Lakewood Church Central Campus in contemporary times.: Today, the Lakewood Church Central Campus serves as the main facility for Lakewood Church, hosting its services and activities.

Architectural, Financial, and Operational Details

The architectural design for the original construction of The Summit was undertaken by Kenneth Bentsen Associates and Lloyd Jones Associates.

Answer: True

The original architectural vision for The Summit was realized by the firms Kenneth Bentsen Associates and Lloyd Jones Associates.

Related Concepts:

  • Identify the architectural firms responsible for the original construction of The Summit.: The architects responsible for the original construction of The Summit were Kenneth Bentsen Associates and Lloyd Jones Associates.

The seating capacity of The Summit varied depending on the configuration, with general estimates around 16,800, while specific capacities for sports like basketball and ice hockey differed.

Answer: True

While often cited around 15,000, the venue's total capacity was 16,800, with specific figures adjusted for different event types.

Related Concepts:

  • Provide the general seating capacity of The Summit.: The general seating capacity of The Summit was 16,800. Specific capacities varied slightly for different sports, such as basketball (up to 16,611) and ice hockey (up to 15,256).
  • Provide the seating capacity of The Summit for basketball games.: The capacity for basketball games at The Summit varied over the years, ranging from 15,676 in its early years (1975–1983) up to 16,611 by 1987.
  • Provide the seating capacity of the arena for ice hockey games.: The capacity for ice hockey games at The Summit ranged from 14,906 in its early years (1975–1983) up to 15,256 by 1994.

Walter P Moore provided structural engineering services for both the original construction of The Summit and its subsequent renovation into Lakewood Church.

Answer: True

The firm Walter P Moore maintained a consistent role as the structural engineer throughout the building's history, from its initial construction to its renovation.

Related Concepts:

  • Describe the role of Walter P Moore in the history of the building.: Walter P Moore served as the structural engineer for the original construction of The Summit and also for the renovations undertaken by Lakewood Church.

The seating capacity for basketball games at The Summit ranged from approximately 15,676 in its early years to up to 16,611 by 1987.

Answer: True

Basketball game capacity fluctuated over the venue's operational lifespan, reflecting updates and configurations.

Related Concepts:

  • Provide the seating capacity of The Summit for basketball games.: The capacity for basketball games at The Summit varied over the years, ranging from 15,676 in its early years (1975–1983) up to 16,611 by 1987.
  • Provide the general seating capacity of The Summit.: The general seating capacity of The Summit was 16,800. Specific capacities varied slightly for different sports, such as basketball (up to 16,611) and ice hockey (up to 15,256).
  • Provide the seating capacity of the arena for ice hockey games.: The capacity for ice hockey games at The Summit ranged from 14,906 in its early years (1975–1983) up to 15,256 by 1994.

The Summit was equipped with Fair-Play scoreboards, which were subsequently enhanced in 1986 with the integration of videoboards.

Answer: True

Technological upgrades, including the addition of videoboards in 1986, modernized the scoreboard system at The Summit.

Related Concepts:

  • Describe the type of scoreboard system utilized at The Summit.: The Summit utilized Fair-Play scoreboards. These were later upgraded in 1986 with the addition of three front-projection videoboards on top of each scoreboard.

The seating capacity for ice hockey games at The Summit was generally lower than its capacity for basketball games.

Answer: True

Capacity figures indicate that basketball configurations typically accommodated more spectators than ice hockey setups.

Related Concepts:

  • Provide the seating capacity of the arena for ice hockey games.: The capacity for ice hockey games at The Summit ranged from 14,906 in its early years (1975–1983) up to 15,256 by 1994.
  • Provide the general seating capacity of The Summit.: The general seating capacity of The Summit was 16,800. Specific capacities varied slightly for different sports, such as basketball (up to 16,611) and ice hockey (up to 15,256).
  • Provide the seating capacity of The Summit for basketball games.: The capacity for basketball games at The Summit varied over the years, ranging from 15,676 in its early years (1975–1983) up to 16,611 by 1987.

The videoboards installed in 1986 served dual purposes, displaying live game footage and fan content alongside advertisements for the arena's sponsors.

Answer: True

The videoboards provided dynamic content beyond simple advertisements, enhancing the spectator experience.

Related Concepts:

  • Explain the purpose of the videoboards added to the scoreboards in 1986.: The videoboards added in 1986 were used to show live game footage and fan shots on the center videoboard, while the left and right videoboards displayed advertisements for the arena's sports team sponsors.

Identify the architectural firms credited with the original design and construction of The Summit.

Answer: Kenneth Bentsen Associates and Lloyd Jones Associates

Kenneth Bentsen Associates and Lloyd Jones Associates were the principal architectural firms involved in the original construction of The Summit.

Related Concepts:

  • Identify the architectural firms responsible for the original construction of The Summit.: The architects responsible for the original construction of The Summit were Kenneth Bentsen Associates and Lloyd Jones Associates.

What was the approximate seating capacity of The Summit specifically for basketball games?

Answer: Up to 16,611

The venue could accommodate up to 16,611 spectators for basketball contests.

Related Concepts:

  • Provide the seating capacity of The Summit for basketball games.: The capacity for basketball games at The Summit varied over the years, ranging from 15,676 in its early years (1975–1983) up to 16,611 by 1987.
  • Provide the general seating capacity of The Summit.: The general seating capacity of The Summit was 16,800. Specific capacities varied slightly for different sports, such as basketball (up to 16,611) and ice hockey (up to 15,256).
  • Provide the seating capacity of the arena for ice hockey games.: The capacity for ice hockey games at The Summit ranged from 14,906 in its early years (1975–1983) up to 15,256 by 1994.

Identify the architectural firms responsible for the design of the renovations that transformed the arena into Lakewood Church.

Answer: Morris Architects and Shaw Architects

Morris Architects and Shaw Architects were the lead firms for the renovation design, with Walter P Moore providing structural engineering.

Related Concepts:

  • Identify the architectural firms responsible for designing the renovations during the conversion into Lakewood Church.: The renovations for Lakewood Church were designed by Morris Architects and Shaw Architects. Walter P Moore served as the structural engineer for both the original construction and the renovations.
  • Describe the role of Walter P Moore in the history of the building.: Walter P Moore served as the structural engineer for the original construction of The Summit and also for the renovations undertaken by Lakewood Church.

What was the seating capacity of The Summit specifically for ice hockey games?

Answer: Up to 15,256

The venue could accommodate up to 15,256 spectators for ice hockey contests.

Related Concepts:

  • Provide the seating capacity of the arena for ice hockey games.: The capacity for ice hockey games at The Summit ranged from 14,906 in its early years (1975–1983) up to 15,256 by 1994.
  • Provide the general seating capacity of The Summit.: The general seating capacity of The Summit was 16,800. Specific capacities varied slightly for different sports, such as basketball (up to 16,611) and ice hockey (up to 15,256).
  • Provide the seating capacity of The Summit for basketball games.: The capacity for basketball games at The Summit varied over the years, ranging from 15,676 in its early years (1975–1983) up to 16,611 by 1987.

What was the seating capacity of The Summit specifically for indoor soccer games?

Answer: 14,848

The venue could accommodate 14,848 spectators for indoor soccer matches.

Related Concepts:

  • Provide the seating capacity of the arena for indoor soccer games.: The capacity for indoor soccer games at The Summit was 14,848.
  • Provide the general seating capacity of The Summit.: The general seating capacity of The Summit was 16,800. Specific capacities varied slightly for different sports, such as basketball (up to 16,611) and ice hockey (up to 15,256).
  • Provide the seating capacity of The Summit for basketball games.: The capacity for basketball games at The Summit varied over the years, ranging from 15,676 in its early years (1975–1983) up to 16,611 by 1987.

Identify the individual or firm that served as the structural engineer for both the original construction and the subsequent renovations of the building.

Answer: Walter P Moore

Walter P Moore provided structural engineering expertise for both the initial construction phase and the later renovation project.

Related Concepts:

  • Describe the role of Walter P Moore in the history of the building.: Walter P Moore served as the structural engineer for the original construction of The Summit and also for the renovations undertaken by Lakewood Church.

Home | Sitemaps | Contact | Terms | Privacy