Naharlagun Station: An Overview

Strategic Location

Naharlagun railway station serves as a crucial railhead in the Papum Pare district of Arunachal Pradesh, India. It is strategically situated approximately 15 kilometers (9.3 miles) from the state capital, Itanagar, acting as a vital link for transportation and commerce into this northeastern region.

Geographical Context

The station's coordinates are 27°06′11″N 93°42′03″E. It is located at an elevation of 138 meters (453 feet) above sea level, placing it within the transitional zone between the plains and the Himalayan foothills, a region of significant geographical and logistical importance.

Operational Details

Owned and operated by Indian Railways through its Northeast Frontier Railway zone, Naharlagun station is a key node on the Harmuti-Naharlagun section. It is classified as a functioning station, identified by the station code NHLN.

A Milestone in Connectivity: Station History

Genesis of the Line

The initiative to establish rail connectivity to Arunachal Pradesh began with initial surveys for the Harmuti–Naharlagun line conducted in 1997. The project was formally sanctioned in the 1996-97 Railway Budget, initially planned as a metre-gauge line, signifying a major step towards integrating the remote northeastern state into the national railway network.

Inauguration and Operations

Following extensive development, an engine trial run was successfully completed on October 15, 2012. The station and the associated railway line were officially operationalized on April 7, 2014. On the same day, the inaugural Naharlagun–Dekargaon Passenger train service commenced, marking a historic moment for Arunachal Pradesh's transportation infrastructure.

Station Infrastructure

Platform Capacity

Naharlagun railway station is equipped with three platforms, designed to handle passenger and freight traffic efficiently. This infrastructure supports the station's role as a primary entry point for rail-borne passengers and goods into Arunachal Pradesh.

Key Services: Trains at Naharlagun

Serving the Region

Naharlagun station hosts several important train services connecting it to major cities and regions. These include:

  • 15618/ Naharlagun–Shokhüvi Donyi Polo Express
  • 22411/ Naharlagun–Anand Vihar Terminal Arunachal AC SF Express
  • 12087/ Naharlagun–Guwahati Shatabdi Express
  • 15908/ Naharlagun–Tinsukia Intercity Express
  • Naharlagun – Dekargaon Passenger

Arunachal Pradesh: Expanding Rail Network

Existing Operational Lines

The current railway network in Arunachal Pradesh, anchored by stations like Naharlagun, is steadily expanding. Key operational lines include:

  • Harmuti–Naharlagun line: This 20 km line connects Harmuti in Assam to Naharlagun, serving as the primary rail link to the state capital. It is electrified and operational.
  • Dekargaon–Bhalukpong Line: Extending 63 km, this line provides vital rail access to the western part of Arunachal Pradesh, connecting Bhalukpong on the Assam border to the broader Indian railway network.

Future Connectivity: Under-Construction Projects

Strategic Rail Development

Several ambitious railway projects are underway or in the planning stages to further enhance connectivity across Arunachal Pradesh. These projects are critical for regional development, security, and economic growth.

Tinsukia–Dambuk Line

This extensive ~300 km line aims to connect Tinsukia (Assam) to Pasighat via multiple towns including Kanubari, Deomali, Lekhapani, Jairampur, Kharsang, Miao, Diyun, Tezu, Bhishmaknagar, Roing, and Dambuk. Survey work was in progress as of February 2023.

Murkongselek–Sille-Pasighat Line

A subset of the above, this 26.15 km line is approximately 45% complete, with significant progress on Phase I (Murkongselek-Sille). The project is targeted for completion by February 2026, with an update on April 30, 2025, indicating substantial progress.

Bhalukpong–Tawang Line

Declared a "Strategic Project," this ~201.46 km line involves extensive tunneling (estimated 80% of the route) and has an estimated cost of INR 70,000 crore. The Detailed Project Report (DPR) was completed and submitted to the Ministry of Defence in February 2023, though physical construction had not commenced as of July 2025.

Lakhimpur-Bame-Silapathar Line

This ~96.02 km line, connecting North Lakhimpur–Bame–Aalo–Silapathar, has been designated a "strategic project." Survey and DPR were completed in February 2023, but progress has stalled as of July 2025.

Pasighat–Tezu–Parshuram Kund–Rupai Line

Spanning approximately 217.83 km, the DPR for this line is complete. However, the project awaits funding approval, with no timelines announced as of July 2025.

Lekhapani–Deban Line

This 71.85 km line via Nampong has had its survey completed. However, it was declared financially unviable, leading to no further progress as of July 2025.

Naharkatia–Deomali Line

Costing ₹1260.13 crore for its 21.13 km stretch, this line's survey is complete. Progress has been halted due to financial unviability as of July 2025.

Itakhola–Seijosa Line

An 18 km line whose survey was completed by 2018. No further progress has been reported as of July 2025.

Dumduma–Namsai–Wakro Line

This 96 km line had its survey completed in 2018, but no progress has been made since, as of July 2025.

Dangri–Roing Line

A 60 km line for which the survey was completed in 2018. No further development has occurred as of July 2025.

Teacher's Corner

Edit and Print this course in the Wiki2Web Teacher Studio

Edit and Print Materials from this study in the wiki2web studio
Click here to open the "Naharlagun Railway Station" Wiki2Web Studio curriculum kit

Use the free Wiki2web Studio to generate printable flashcards, worksheets, exams, and export your materials as a web page or an interactive game.

True or False?

Test Your Knowledge!

Gamer's Corner

Are you ready for the Wiki2Web Clarity Challenge?

Learn about naharlagun_railway_station while playing the wiki2web Clarity Challenge game.
Unlock the mystery image and prove your knowledge by earning trophies. This simple game is addictively fun and is a great way to learn!

Play now

References

References

A full list of references for this article are available at the Naharlagun railway station Wikipedia page

Feedback & Support

To report an issue with this page, or to find out ways to support the mission, please click here.

Disclaimer

Important Notice

This page has been generated by an Artificial Intelligence and is intended for informational and educational purposes only. The content is derived from publicly available data and may not reflect the most current status or complete details of railway projects or station operations.

This is not official transportation or infrastructure advice. The information provided is not a substitute for consulting official Indian Railways documentation, project updates, or seeking advice from qualified transportation planners or civil engineers. Always verify critical information with official sources.

The creators of this page are not responsible for any errors or omissions, or for any actions taken based on the information provided herein. Users are encouraged to cross-reference information with official government and railway sources.