Strategic Energy Link
TurkStream is a significant natural gas pipeline system originating in Russia and terminating in Turkey, traversing the Black Sea. It serves as a critical conduit for Russian gas exports, primarily targeting the Turkish and European markets.
Route and Terminals
The pipeline commences at the Russkaya compressor station near Anapa, Russia. It extends approximately 930 km (580 mi) across the Black Sea seabed, making landfall at Kıyıköy in Turkey's Kırklareli Province. From Turkey, gas flows onward to Southeast and Central Europe.
Operators and Stakeholders
The project involves major energy entities from both nations. Gazprom manages the Russian onshore section and the offshore segments, while BOTAŞ oversees the Turkish onshore infrastructure. The pipeline's operation significantly influences regional energy dynamics.
Historical Context
Genesis and Evolution
The concept evolved from earlier proposals like Blue Stream II and the ultimately cancelled South Stream project. TurkStream was officially announced by President Putin in December 2014, following a memorandum of understanding between Gazprom and BOTAŞ. The project faced geopolitical headwinds, including a temporary suspension in late 2015 following the downing of a Russian jet by Turkey, but was revived after diplomatic reconciliation.
Replacing Existing Routes
Upon its commissioning, TurkStream began diverting gas transit away from Ukraine and the Trans-Balkan pipeline system. This strategic shift aimed to enhance supply security for recipient countries and alter established energy transit dynamics in Eastern Europe.
Technical Specifications
Dimensions and Capacity
The TurkStream pipeline comprises two parallel lines, each designed for specific delivery routes.
- Total Length: Approximately 930 km (580 mi).
- Total Capacity: 31.5 billion cubic meters per year (bcm/a).
- Line 1 Capacity: 15.75 bcm/a (for Turkey).
- Line 2 Capacity: 15.75 bcm/a (for Europe).
Pipeline Construction
The physical infrastructure is built to withstand deep-sea conditions and high pressures.
- Pipe Diameter: 810 mm (32 inches) outer diameter.
- Wall Thickness: 39 mm (1.5 inches).
- Concrete Coating: 80 mm (3.1 inches).
- Maximum Internal Pressure: 300 bar (4,400 psi).
- Maximum Water Depth: Up to 2,200 meters (7,200 ft).
Estimated Cost
The project represented a substantial investment in energy infrastructure, with estimates placing the total cost around €11.4 billion. This figure underscores the scale and economic significance of the undertaking.
Pipeline Route
Russian Origin
The journey begins at the Russkaya compressor station, located near Anapa in the Krasnodar Krai region of Russia. This facility is crucial for regulating gas pressure before it enters the offshore section.
Black Sea Crossing
The most technically challenging segment involves laying two parallel lines across the Black Sea seabed. This offshore section spans approximately 700 km (435 mi) within Turkish waters and 230 km (140 mi) within Russian maritime zones, reaching depths of up to 2,200 meters.
Turkish Landing and Distribution
The pipeline makes landfall at Kıyıköy, a coastal village in northwestern Turkey. From here, the first line supplies gas directly to the Turkish market. The second line continues overland towards the Bulgarian border, connecting to the European network.
European Extension
The second line facilitates gas transit into Southeastern and Central Europe. Initial connections extend through Bulgaria, Serbia, and Hungary, with potential future branches planned for other nations like Slovakia and Austria, aiming to establish a broader energy corridor.
Key Contractors
Project Implementation
The construction and operation of TurkStream involved several key entities, leveraging specialized expertise for different segments of the project.
- Offshore Laying: Allseas, utilizing vessels like Audacia and Pioneering Spirit for near-shore and deep-sea sections, respectively.
- Turkish Section: Petrofac acted as the contractor, with Tekfen serving as the subcontractor for the receiving terminal construction.
- Onshore Construction (Turkey): TurkAkim Gaz Tasima A. S., a joint venture between Gazprom and BOTAŞ, managed the land-based construction.
- Pipeline Manufacturing: Pipes were supplied by Europipe GmbH (Germany) and Russian manufacturers including Vyksa Steel Works (OMK) and Izhora Pipe Mill (Severstal), alongside a Japanese consortium (Marubeni, Itochu, Sumitomo).
Geopolitical and Economic Impact
Shifting Gas Flows
TurkStream fundamentally altered regional gas transit patterns, significantly reducing reliance on pipelines transiting Ukraine. This strategic redirection enhances Russia's direct supply routes to Europe and positions Turkey as a key transit country.
Turkey as an Energy Hub
Discussions have centered on Turkey potentially becoming a broader energy hub, consolidating gas from various sources—including Russia, Azerbaijan, Iran, and liquefied natural gas (LNG)—for distribution across Europe. This ambition aims to leverage Turkey's strategic location.
Security and Recent Events
The pipeline's strategic importance has made it a subject of geopolitical tension. Reports indicate attempts to disrupt the pipeline, including a failed Ukrainian attack in 2022 and a drone incident targeting a compressor station in January 2025. These events highlight the critical infrastructure's vulnerability and the ongoing complexities surrounding energy security.
Sources
Cited Information
The content presented herein is synthesized from a comprehensive review of available data. For detailed sourcing and further information, please refer to the placeholder below, which will be populated programmatically.
Teacher's Corner
Edit and Print this course in the Wiki2Web Teacher Studio

Click here to open the "Turkstream" Wiki2Web Studio curriculum kit
Use the free Wiki2web Studio to generate printable flashcards, worksheets, exams, and export your materials as a web page or an interactive game.
True or False?
Test Your Knowledge!
Gamer's Corner
Are you ready for the Wiki2Web Clarity Challenge?
Unlock the mystery image and prove your knowledge by earning trophies. This simple game is addictively fun and is a great way to learn!
Play now
References
References
Feedback & Support
To report an issue with this page, or to find out ways to support the mission, please click here.
Disclaimer
Important Notice
This document was generated by an Artificial Intelligence and is intended for informational and educational purposes only. While efforts have been made to ensure accuracy based on the provided source material, the content may not be exhaustive, entirely up-to-date, or reflect all nuances of the subject matter.
This is not professional advice. The information provided does not constitute financial, investment, geopolitical, or engineering advice. Users should consult with qualified professionals for specific advice related to energy markets, infrastructure projects, or international relations. Reliance on this information is solely at the user's own risk.
The creators of this page are not responsible for any errors or omissions, or for any actions taken based on the information provided herein. Always consult official documentation and expert analysis for critical decision-making.