Arunachal Pradesh: East-West Industrial Corridor Highway Project

At a Glance

Title: Arunachal Pradesh: East-West Industrial Corridor Highway Project

Total Categories: 5

Category Stats

  • Project Scope and Strategic Importance: 9 flashcards, 11 questions
  • Phased Development and Route Details: 14 flashcards, 22 questions
  • Regional and International Connectivity: 14 flashcards, 17 questions
  • Project Implementation Challenges and Stakeholders: 13 flashcards, 12 questions
  • Ancillary Developments and Related Infrastructure: 3 flashcards, 4 questions

Total Stats

  • Total Flashcards: 53
  • True/False Questions: 40
  • Multiple Choice Questions: 26
  • Total Questions: 66

Instructions

Click the button to expand the instructions for how to use the Wiki2Web Teacher studio in order to print, edit, and export data about Arunachal Pradesh: East-West Industrial Corridor Highway Project

Welcome to Your Curriculum Command Center

This guide will turn you into a Wiki2web Studio power user. Let's unlock the features designed to give you back your weekends.

The Core Concept: What is a "Kit"?

Think of a Kit as your all-in-one digital lesson plan. It's a single, portable file that contains every piece of content for a topic: your subject categories, a central image, all your flashcards, and all your questions. The true power of the Studio is speed—once a kit is made (or you import one), you are just minutes away from printing an entire set of coursework.

Getting Started is Simple:

  • Create New Kit: Start with a clean slate. Perfect for a brand-new lesson idea.
  • Import & Edit Existing Kit: Load a .json kit file from your computer to continue your work or to modify a kit created by a colleague.
  • Restore Session: The Studio automatically saves your progress in your browser. If you get interrupted, you can restore your unsaved work with one click.

Step 1: Laying the Foundation (The Authoring Tools)

This is where you build the core knowledge of your Kit. Use the left-side navigation panel to switch between these powerful authoring modules.

⚙️ Kit Manager: Your Kit's Identity

This is the high-level control panel for your project.

  • Kit Name: Give your Kit a clear title. This will appear on all your printed materials.
  • Master Image: Upload a custom cover image for your Kit. This is essential for giving your content a professional visual identity, and it's used as the main graphic when you export your Kit as an interactive game.
  • Topics: Create the structure for your lesson. Add topics like "Chapter 1," "Vocabulary," or "Key Formulas." All flashcards and questions will be organized under these topics.

🃏 Flashcard Author: Building the Knowledge Blocks

Flashcards are the fundamental concepts of your Kit. Create them here to define terms, list facts, or pose simple questions.

  • Click "➕ Add New Flashcard" to open the editor.
  • Fill in the term/question and the definition/answer.
  • Assign the flashcard to one of your pre-defined topics.
  • To edit or remove a flashcard, simply use the ✏️ (Edit) or ❌ (Delete) icons next to any entry in the list.

✍️ Question Author: Assessing Understanding

Create a bank of questions to test knowledge. These questions are the engine for your worksheets and exams.

  • Click "➕ Add New Question".
  • Choose a Type: True/False for quick checks or Multiple Choice for more complex assessments.
  • To edit an existing question, click the ✏️ icon. You can change the question text, options, correct answer, and explanation at any time.
  • The Explanation field is a powerful tool: the text you enter here will automatically appear on the teacher's answer key and on the Smart Study Guide, providing instant feedback.

🔗 Intelligent Mapper: The Smart Connection

This is the secret sauce of the Studio. The Mapper transforms your content from a simple list into an interconnected web of knowledge, automating the creation of amazing study guides.

  • Step 1: Select a question from the list on the left.
  • Step 2: In the right panel, click on every flashcard that contains a concept required to answer that question. They will turn green, indicating a successful link.
  • The Payoff: When you generate a Smart Study Guide, these linked flashcards will automatically appear under each question as "Related Concepts."

Step 2: The Magic (The Generator Suite)

You've built your content. Now, with a few clicks, turn it into a full suite of professional, ready-to-use materials. What used to take hours of formatting and copying-and-pasting can now be done in seconds.

🎓 Smart Study Guide Maker

Instantly create the ultimate review document. It combines your questions, the correct answers, your detailed explanations, and all the "Related Concepts" you linked in the Mapper into one cohesive, printable guide.

📝 Worksheet & 📄 Exam Builder

Generate unique assessments every time. The questions and multiple-choice options are randomized automatically. Simply select your topics, choose how many questions you need, and generate:

  • A Student Version, clean and ready for quizzing.
  • A Teacher Version, complete with a detailed answer key and the explanations you wrote.

🖨️ Flashcard Printer

Forget wrestling with table layouts in a word processor. Select a topic, choose a cards-per-page layout, and instantly generate perfectly formatted, print-ready flashcard sheets.

Step 3: Saving and Collaborating

  • 💾 Export & Save Kit: This is your primary save function. It downloads the entire Kit (content, images, and all) to your computer as a single .json file. Use this to create permanent backups and share your work with others.
  • ➕ Import & Merge Kit: Combine your work. You can merge a colleague's Kit into your own or combine two of your lessons into a larger review Kit.

You're now ready to reclaim your time.

You're not just a teacher; you're a curriculum designer, and this is your Studio.

This page is an interactive visualization based on the Wikipedia article "East-West Industrial Corridor Highway, Arunachal Pradesh" (opens in new tab) and its cited references.

Text content is available under the Creative Commons Attribution-ShareAlike 4.0 License (opens in new tab). Additional terms may apply.

Disclaimer: This website is for informational purposes only and does not constitute any kind of advice. The information is not a substitute for consulting official sources or records or seeking advice from qualified professionals.


Owned and operated by Artificial General Intelligence LLC, a Michigan Registered LLC
Prompt engineering done with Gracekits.com
All rights reserved
Sitemaps | Contact

Export Options





Study Guide: Arunachal Pradesh: East-West Industrial Corridor Highway Project

Study Guide: Arunachal Pradesh: East-West Industrial Corridor Highway Project

Project Scope and Strategic Importance

The East-West Industrial Corridor Highway in Arunachal Pradesh is primarily designed as a route for passenger tourism.

Answer: False

The highway is designated as an industrial corridor intended to facilitate economic activity and development, rather than primarily serving passenger tourism.

Related Concepts:

  • What is the primary designation and purpose of the East-West Industrial Corridor Highway in Arunachal Pradesh?: The East-West Industrial Corridor Highway in Arunachal Pradesh is a proposed 2-lane highway intended to function as an industrial corridor, facilitating economic activity and development along its route through the lower foothills of the state.
  • What is the intended function of the highway being designated as an 'industrial corridor'?: The designation as an 'industrial corridor' suggests the highway is intended to stimulate economic growth by facilitating the movement of goods and supporting industrial development along its route in the foothills of Arunachal Pradesh.

The western terminus of the East-West Industrial Corridor Highway is located within Arunachal Pradesh at Pasighat.

Answer: False

The western terminus of the East-West Industrial Corridor Highway is located at Bhairabkunda in Assam's Udalguri district, not within Arunachal Pradesh at Pasighat.

Related Concepts:

  • What are the geographical endpoints of the East-West Industrial Corridor Highway?: The highway's western end is located at Bhairabkunda in Assam's Udalguri district, at the tri-junction of Bhutan, Assam, and Arunachal Pradesh. Its eastern end is situated at Ruksin in Arunachal Pradesh's East Siang district, connecting to the Kanubari tri-junction involving Nagaland, Assam, and Arunachal Pradesh.

The total length of the East-West Industrial Corridor Highway project is approximately 274 km.

Answer: False

The total length of the East-West Industrial Corridor Highway project is 966.78 km; the 274.20 km figure refers to an existing route segment within the project.

Related Concepts:

  • What is the total length of the East-West Industrial Corridor Highway project?: The East-West Industrial Corridor Highway project encompasses a total length of 966.78 km. This measurement includes an existing route segment of 274.20 km between Pasighat and Manmao.
  • What is the total length of the highway project as stated in the introduction?: The introduction states the total length of the East-West Industrial Corridor Highway, Arunachal Pradesh, is 966.78 km, which includes existing road segments.

The East-West Industrial Corridor Highway is expected to enhance India's national security by improving strategic access in the region.

Answer: True

The highway is considered vital for bolstering India's national security posture by improving strategic access and infrastructure in the sensitive border region.

Related Concepts:

  • How is the East-West Industrial Corridor Highway expected to contribute to Arunachal Pradesh's development and India's national security?: The highway is considered vital for Arunachal Pradesh's overall development, bolstering India's national security posture, and enhancing international connectivity under the 'Look East' policy, thereby improving strategic access and infrastructure in the region.

The designation 'industrial corridor' implies the highway is mainly for military troop movement.

Answer: False

The designation 'industrial corridor' suggests the highway is intended to stimulate economic growth by facilitating the movement of goods and supporting industrial development.

Related Concepts:

  • What is the intended function of the highway being designated as an 'industrial corridor'?: The designation as an 'industrial corridor' suggests the highway is intended to stimulate economic growth by facilitating the movement of goods and supporting industrial development along its route in the foothills of Arunachal Pradesh.

Bhairabkunda's location at a tri-junction with Bhutan makes it strategically unimportant for the highway's western terminus.

Answer: False

Bhairabkunda's location at the tri-junction of Bhutan, Assam, and Arunachal Pradesh makes it a critical and strategically important starting point for the highway.

Related Concepts:

  • What is the strategic importance of Bhairabkunda as the western terminus of the highway?: Bhairabkunda's location at the tri-junction of Bhutan, Assam, and Arunachal Pradesh makes it a critical starting point for the highway, establishing a connection between an international border and multiple Indian states.
  • What are the geographical endpoints of the East-West Industrial Corridor Highway?: The highway's western end is located at Bhairabkunda in Assam's Udalguri district, at the tri-junction of Bhutan, Assam, and Arunachal Pradesh. Its eastern end is situated at Ruksin in Arunachal Pradesh's East Siang district, connecting to the Kanubari tri-junction involving Nagaland, Assam, and Arunachal Pradesh.

Ruksin serves as the western endpoint of the East-West Industrial Corridor Highway.

Answer: False

Ruksin serves as the eastern endpoint of the East-West Industrial Corridor Highway.

Related Concepts:

  • What is the strategic importance of Ruksin as the eastern terminus of the highway?: Ruksin, situated in the East Siang district of Arunachal Pradesh, serves as the eastern endpoint, linking the corridor to the eastern parts of the state and ultimately connecting towards the Kanubari tri-junction.

What is the primary purpose of the East-West Industrial Corridor Highway in Arunachal Pradesh?

Answer: To function as an industrial corridor facilitating economic activity and development.

Related Concepts:

  • What is the primary designation and purpose of the East-West Industrial Corridor Highway in Arunachal Pradesh?: The East-West Industrial Corridor Highway in Arunachal Pradesh is a proposed 2-lane highway intended to function as an industrial corridor, facilitating economic activity and development along its route through the lower foothills of the state.
  • What is the intended function of the highway being designated as an 'industrial corridor'?: The designation as an 'industrial corridor' suggests the highway is intended to stimulate economic growth by facilitating the movement of goods and supporting industrial development along its route in the foothills of Arunachal Pradesh.

What is the total length of the East-West Industrial Corridor Highway project?

Answer: 966.78 km

Related Concepts:

  • What is the total length of the East-West Industrial Corridor Highway project?: The East-West Industrial Corridor Highway project encompasses a total length of 966.78 km. This measurement includes an existing route segment of 274.20 km between Pasighat and Manmao.
  • What is the total length of the highway project as stated in the introduction?: The introduction states the total length of the East-West Industrial Corridor Highway, Arunachal Pradesh, is 966.78 km, which includes existing road segments.

How is the East-West Industrial Corridor Highway expected to contribute to India's national security?

Answer: By enhancing strategic access and infrastructure in the region.

Related Concepts:

  • How is the East-West Industrial Corridor Highway expected to contribute to Arunachal Pradesh's development and India's national security?: The highway is considered vital for Arunachal Pradesh's overall development, bolstering India's national security posture, and enhancing international connectivity under the 'Look East' policy, thereby improving strategic access and infrastructure in the region.

The East-West Industrial Corridor Highway is planned to run through approximately how many districts in Arunachal Pradesh?

Answer: 12

Related Concepts:

  • How many districts in Arunachal Pradesh are expected to be served by the East-West Industrial Corridor Highway?: The highway is planned to run through at least 12 districts of Arunachal Pradesh, serving as a vital link and industrial corridor for the region.

Phased Development and Route Details

Phase-I of the East-West Industrial Corridor Highway covers a length of 147.13 km.

Answer: False

Phase-I of the East-West Industrial Corridor Highway covers a total length of 545.45 km; 147.13 km is the length of Phase-II.

Related Concepts:

  • Could you describe the scope and components of Phase-I of the East-West Industrial Corridor Highway?: Phase-I covers a total length of 545.45 km, extending from Pasighat to Bhairabkunda. This phase is further divided into four packages: Package-1 (Pasighat to Naharlagun), Package-2A (Naharlagun to Seijosa), Package-2B (Seijosa to Bhalukpong), and Package-2C (Bhalukpong to Bhairabkund), the last of which spans parts of both Arunachal Pradesh and Assam.

Phase-II of the highway connects Manmao in the Changlang district to Kanubari in the Longding district.

Answer: True

Phase-II of the highway spans 147.13 km and connects Manmao in Changlang district to Kanubari in Longding district, passing through Khonsa.

Related Concepts:

  • What specific route does Phase-II of the East-West Industrial Corridor Highway cover, and what is its length?: Phase-II of the highway spans 147.13 km. It connects Manmao in the Changlang district to Kanubari in the Longding district, passing through Khonsa in the Tirap district and Longding.

Phase-III of the project involves upgrading roads and constructing a bridge over the Noadhiang River near Miao.

Answer: True

Phase-III focuses on the route from Wakro to Nampong, including upgrades to existing roads and the construction of a bridge over the Noadhiang River near Miao.

Related Concepts:

  • What are the key aspects of Phase-III of the East-West Industrial Corridor Highway project?: Phase-III focuses on the route from Wakro to Nampong, involving upgrades to existing roads and the construction of new infrastructure like a bridge over the Noadhiang River near Miao. It also includes upgrading village roads along the Namphuk river.

The primary objective of Phase-IV is to connect Arunachal Pradesh to Bhutan.

Answer: False

The primary objective of Phase-IV is to significantly shorten the travel distance between Sille-Oyan and Sadiya by constructing a new bridge over the Brahmaputra River.

Related Concepts:

  • What is the primary objective of Phase-IV of the East-West Industrial Corridor Highway?: Phase-IV aims to significantly shorten the travel distance between Sille-Oyan and Sadiya by approximately 140 km (from 180 km to 40 km) through the construction of a new greenfield bridge over the Brahmaputra River and associated road links, connecting to National Waterway 2.
  • What is the significance of the proposed Sadiya Sille-Oyan bridge in Phase-IV of the project?: The Sadiya Sille-Oyan bridge is a key component of Phase-IV, designed to drastically reduce the travel distance between Sille-Oyan and Sadiya from 180 km to 40 km. It also connects to National Waterway 2 at Sadiya, an important port town.

Phase-V of the East-West Industrial Corridor Highway focuses on extending connectivity westward into Assam.

Answer: False

Phase-V represents an eastern extension, connecting east Assam and southeast Arunachal Pradesh to areas like Nampong and Vijoynagar.

Related Concepts:

  • What geographical areas does Phase-V of the East-West Industrial Corridor Highway project focus on?: Phase-V represents an eastern extension, connecting east Assam and southeast Arunachal Pradesh to areas such as Nampong, Vijoynagar, and the Dong-Walong-Kibithu region, improving connectivity in the easternmost parts of the state.

Phase-VI proposes a northern Assam extension of the highway.

Answer: False

Phase-VI proposes a central Assam extension, linking southeastern Arunachal Pradesh to Sivasagar and potentially Gogamukh.

Related Concepts:

  • How does Phase-VI of the East-West Industrial Corridor Highway plan to enhance connectivity in central Assam?: Phase-VI proposes a central Assam extension, linking southeastern Arunachal Pradesh to Sivasagar and potentially further north to Gogamukh and Daporijo. This involves upgrading existing routes and constructing new greenfield sections to improve regional transport networks.

Phase-VII of the highway project is planned as a southern extension towards Bangladesh.

Answer: False

Phase-VII is planned as a western extension, aiming to connect Arunachal Pradesh westward through northern India towards Pakistan.

Related Concepts:

  • What is the strategic aim of Phase-VII, the western extension of the East-West Industrial Corridor Highway?: Phase-VII aims to extend connectivity westward from Arunachal Pradesh towards Pakistan, traversing through northern India, including Assam, West Bengal, Bihar, Uttar Pradesh, Haryana, and Punjab. This extension is part of the Bharatmala-II plan.

Phase-VIII aims to connect the region southward to Nagaland, Assam, Meghalaya, and Bangladesh.

Answer: True

Phase-VIII focuses on connecting east Assam and southeast Arunachal Pradesh southward to Nagaland, southern Assam, Meghalaya, and Bangladesh.

Related Concepts:

  • What connectivity goals does Phase-VIII, the southern extension, aim to achieve?: Phase-VIII focuses on connecting east Assam and southeast Arunachal Pradesh southward to Nagaland, southern Assam, Meghalaya, Bangladesh, central West Bengal, and central Bihar. It involves upgrading existing roads and building new greenfield links, including cross-border connections to Bangladesh.
  • What specific connection does Phase-VIII of the highway project aim to establish towards Bangladesh?: Phase-VIII plans to connect southeast Arunachal Pradesh and east Assam southward to Bangladesh by upgrading existing roads and building new greenfield links through Nagaland, Assam, Meghalaya, and Tripura, including routes to border crossings like Hatsingimari and Mahendraganj.

The Sadiya Sille-Oyan bridge in Phase-IV is intended to connect Arunachal Pradesh with Myanmar.

Answer: False

The Sadiya Sille-Oyan bridge in Phase-IV is intended to significantly reduce travel distance between Sille-Oyan and Sadiya and connect to National Waterway 2, not to Myanmar.

Related Concepts:

  • What is the significance of the proposed Sadiya Sille-Oyan bridge in Phase-IV of the project?: The Sadiya Sille-Oyan bridge is a key component of Phase-IV, designed to drastically reduce the travel distance between Sille-Oyan and Sadiya from 180 km to 40 km. It also connects to National Waterway 2 at Sadiya, an important port town.
  • What is the primary objective of Phase-IV of the East-West Industrial Corridor Highway?: Phase-IV aims to significantly shorten the travel distance between Sille-Oyan and Sadiya by approximately 140 km (from 180 km to 40 km) through the construction of a new greenfield bridge over the Brahmaputra River and associated road links, connecting to National Waterway 2.

Future expansion phases (VI, VII, VIII) aim to connect Arunachal Pradesh only to neighboring states within India.

Answer: False

Future phases aim for broader connectivity, including westward extensions towards Pakistan (Phase VII) and southward connections to Bangladesh (Phase VIII).

Related Concepts:

  • What is the strategic aim of Phase-VII, the western extension of the East-West Industrial Corridor Highway?: Phase-VII aims to extend connectivity westward from Arunachal Pradesh towards Pakistan, traversing through northern India, including Assam, West Bengal, Bihar, Uttar Pradesh, Haryana, and Punjab. This extension is part of the Bharatmala-II plan.
  • What geographical areas does Phase-V of the East-West Industrial Corridor Highway project focus on?: Phase-V represents an eastern extension, connecting east Assam and southeast Arunachal Pradesh to areas such as Nampong, Vijoynagar, and the Dong-Walong-Kibithu region, improving connectivity in the easternmost parts of the state.
  • What connectivity goals does Phase-VIII, the southern extension, aim to achieve?: Phase-VIII focuses on connecting east Assam and southeast Arunachal Pradesh southward to Nagaland, southern Assam, Meghalaya, Bangladesh, central West Bengal, and central Bihar. It involves upgrading existing roads and building new greenfield links, including cross-border connections to Bangladesh.

Phase-VII intends to create missing links and upgrade routes across northern India, extending towards Pakistan.

Answer: True

Phase-VII is designed to extend connectivity westward through northern India, aiming towards Pakistan, and is incorporated into the Bharatmala-II plan.

Related Concepts:

  • What is the strategic aim of Phase-VII, the western extension of the East-West Industrial Corridor Highway?: Phase-VII aims to extend connectivity westward from Arunachal Pradesh towards Pakistan, traversing through northern India, including Assam, West Bengal, Bihar, Uttar Pradesh, Haryana, and Punjab. This extension is part of the Bharatmala-II plan.
  • What is the significance of the Bharatmala-II plan in relation to Phase-VII of the highway project?: Phase-VII's western extension is incorporated into the Bharatmala-II plan, signifying that this highway development is part of a larger national strategy to enhance road infrastructure, particularly focusing on economic corridors and border connectivity across India.

Phase-VIII plans to connect the region southward to Bangladesh via Meghalaya and Tripura.

Answer: True

Phase-VIII focuses on southward connections to Bangladesh, utilizing routes through Nagaland, Assam, Meghalaya, and Tripura.

Related Concepts:

  • What connectivity goals does Phase-VIII, the southern extension, aim to achieve?: Phase-VIII focuses on connecting east Assam and southeast Arunachal Pradesh southward to Nagaland, southern Assam, Meghalaya, Bangladesh, central West Bengal, and central Bihar. It involves upgrading existing roads and building new greenfield links, including cross-border connections to Bangladesh.
  • What specific connection does Phase-VIII of the highway project aim to establish towards Bangladesh?: Phase-VIII plans to connect southeast Arunachal Pradesh and east Assam southward to Bangladesh by upgrading existing roads and building new greenfield links through Nagaland, Assam, Meghalaya, and Tripura, including routes to border crossings like Hatsingimari and Mahendraganj.

A 'greenfield route' indicates the highway follows an existing, upgraded path.

Answer: False

A 'greenfield route' signifies the construction of a new highway or road section on undeveloped land, rather than upgrading an existing path.

Related Concepts:

  • What does the term 'greenfield route' imply in the context of this highway project?: A 'greenfield route' signifies the construction of a new highway or road section on undeveloped land, meaning it does not follow or upgrade an existing path. This approach is often used to create direct alignments or bypass challenging terrain.

What is the length of Phase-II of the East-West Industrial Corridor Highway?

Answer: 147.13 km

Related Concepts:

  • What specific route does Phase-II of the East-West Industrial Corridor Highway cover, and what is its length?: Phase-II of the highway spans 147.13 km. It connects Manmao in the Changlang district to Kanubari in the Longding district, passing through Khonsa in the Tirap district and Longding.

Which phase of the East-West Industrial Corridor Highway project includes the construction of a bridge over the Noadhiang River near Miao?

Answer: Phase-III

Related Concepts:

  • What are the key aspects of Phase-III of the East-West Industrial Corridor Highway project?: Phase-III focuses on the route from Wakro to Nampong, involving upgrades to existing roads and the construction of new infrastructure like a bridge over the Noadhiang River near Miao. It also includes upgrading village roads along the Namphuk river.

What is the main goal of Phase-IV of the East-West Industrial Corridor Highway?

Answer: To significantly shorten the travel distance between Sille-Oyan and Sadiya.

Related Concepts:

  • What is the primary objective of Phase-IV of the East-West Industrial Corridor Highway?: Phase-IV aims to significantly shorten the travel distance between Sille-Oyan and Sadiya by approximately 140 km (from 180 km to 40 km) through the construction of a new greenfield bridge over the Brahmaputra River and associated road links, connecting to National Waterway 2.
  • What is the significance of the proposed Sadiya Sille-Oyan bridge in Phase-IV of the project?: The Sadiya Sille-Oyan bridge is a key component of Phase-IV, designed to drastically reduce the travel distance between Sille-Oyan and Sadiya from 180 km to 40 km. It also connects to National Waterway 2 at Sadiya, an important port town.

Which geographical areas does Phase-V of the East-West Industrial Corridor Highway project focus on?

Answer: Eastern Assam and southeast Arunachal Pradesh towards the easternmost regions.

Related Concepts:

  • What geographical areas does Phase-V of the East-West Industrial Corridor Highway project focus on?: Phase-V represents an eastern extension, connecting east Assam and southeast Arunachal Pradesh to areas such as Nampong, Vijoynagar, and the Dong-Walong-Kibithu region, improving connectivity in the easternmost parts of the state.

What is the proposed focus of Phase-VI of the East-West Industrial Corridor Highway?

Answer: A central Assam extension linking to Sivasagar and Gogamukh.

Related Concepts:

  • How does Phase-VI of the East-West Industrial Corridor Highway plan to enhance connectivity in central Assam?: Phase-VI proposes a central Assam extension, linking southeastern Arunachal Pradesh to Sivasagar and potentially further north to Gogamukh and Daporijo. This involves upgrading existing routes and constructing new greenfield sections to improve regional transport networks.

What is the strategic aim of Phase-VII of the East-West Industrial Corridor Highway?

Answer: To extend connectivity westward through northern India towards Pakistan.

Related Concepts:

  • What is the strategic aim of Phase-VII, the western extension of the East-West Industrial Corridor Highway?: Phase-VII aims to extend connectivity westward from Arunachal Pradesh towards Pakistan, traversing through northern India, including Assam, West Bengal, Bihar, Uttar Pradesh, Haryana, and Punjab. This extension is part of the Bharatmala-II plan.

Which phase of the highway project focuses on connecting the region southward to Bangladesh?

Answer: Phase-VIII

Related Concepts:

  • What connectivity goals does Phase-VIII, the southern extension, aim to achieve?: Phase-VIII focuses on connecting east Assam and southeast Arunachal Pradesh southward to Nagaland, southern Assam, Meghalaya, Bangladesh, central West Bengal, and central Bihar. It involves upgrading existing roads and building new greenfield links, including cross-border connections to Bangladesh.
  • What specific connection does Phase-VIII of the highway project aim to establish towards Bangladesh?: Phase-VIII plans to connect southeast Arunachal Pradesh and east Assam southward to Bangladesh by upgrading existing roads and building new greenfield links through Nagaland, Assam, Meghalaya, and Tripura, including routes to border crossings like Hatsingimari and Mahendraganj.

What is the significance of the proposed Sadiya Sille-Oyan bridge in Phase-IV?

Answer: It significantly reduces travel distance between Sille-Oyan and Sadiya.

Related Concepts:

  • What is the significance of the proposed Sadiya Sille-Oyan bridge in Phase-IV of the project?: The Sadiya Sille-Oyan bridge is a key component of Phase-IV, designed to drastically reduce the travel distance between Sille-Oyan and Sadiya from 180 km to 40 km. It also connects to National Waterway 2 at Sadiya, an important port town.
  • What is the primary objective of Phase-IV of the East-West Industrial Corridor Highway?: Phase-IV aims to significantly shorten the travel distance between Sille-Oyan and Sadiya by approximately 140 km (from 180 km to 40 km) through the construction of a new greenfield bridge over the Brahmaputra River and associated road links, connecting to National Waterway 2.

What is the overarching goal of Phase-VII of the East-West Industrial Corridor Highway?

Answer: To extend connectivity westward through northern India towards Pakistan.

Related Concepts:

  • What is the strategic aim of Phase-VII, the western extension of the East-West Industrial Corridor Highway?: Phase-VII aims to extend connectivity westward from Arunachal Pradesh towards Pakistan, traversing through northern India, including Assam, West Bengal, Bihar, Uttar Pradesh, Haryana, and Punjab. This extension is part of the Bharatmala-II plan.

Regional and International Connectivity

The Trans-Arunachal Highway divides Arunachal Pradesh into its upper and lower portions.

Answer: True

The Trans-Arunachal Highway is described as a partially existing highway that roughly divides Arunachal Pradesh into its upper two-thirds and lower one-third portions.

Related Concepts:

  • What is the general alignment of the Trans-Arunachal Highway mentioned in the article?: The Trans-Arunachal Highway is described as a partially existing highway that roughly divides Arunachal Pradesh into its upper two-thirds and lower one-third portions.

The 'Six Inter-corridor highways' are designed to connect the East-West Industrial Corridor Highway with the Arunachal Frontier Highway.

Answer: True

The Six Inter-corridor highways are designed to provide interconnectivity between the main horizontal highways in Arunachal Pradesh, including the East-West Industrial Corridor Highway and the Frontier Highway.

Related Concepts:

  • What are the 'Six Inter-corridor highways' and why are they significant?: The Six Inter-corridor highways are a network of six vertical and diagonal national highway corridors totaling 2178 km. They are designed to provide crucial interconnectivity between the three main horizontal highways in Arunachal Pradesh (Frontier Highway, Trans-Arunachal Highway, and East-West Industrial Corridor Highway) and improve access to strategic border areas.

The Kanubari-Longding Highway is the shortest among the six proposed inter-corridor highways.

Answer: False

The Kanubari-Longding Highway is 404 km, while the Gogamukh-Taliha-Tato Highway is listed as 285 km, making it the shortest among the six.

Related Concepts:

  • Can you list the six proposed inter-corridor highways mentioned in the article?: The six inter-corridor highways, listed from west to east, are: Thelamara-Tawang-Nelia Highway (402 km), Itakhola-Pakke-Kessang-Seppa-Parsi Parlo Highway (391 km), Gogamukh-Taliha-Tato Highway (285 km), Akajan-Jorging-Pango Highway (398 km), Pasighat-Bishing Highway (298 km), and Kanubari-Longding Highway (404 km).

The East-West Industrial Corridor Highway project is planned to connect with the BCIM Economic Corridor.

Answer: True

The project is planned to connect with the BCIM (Bangladesh-China-India-Myanmar) Economic Corridor, enhancing regional integration.

Related Concepts:

  • How does the East-West Industrial Corridor Highway project relate to the BCIM Economic Corridor?: The East-West Industrial Corridor Highway, along with the Arunachal Frontier Highway, is planned to connect with the BCIM (Bangladesh-China-India-Myanmar) Economic Corridor, thereby enhancing regional connectivity and integration.

The Trans-Arunachal Highway divides the state into upper and lower thirds.

Answer: True

The Trans-Arunachal Highway is described as dividing Arunachal Pradesh into its upper and lower portions.

Related Concepts:

  • What is the general alignment of the Trans-Arunachal Highway mentioned in the article?: The Trans-Arunachal Highway is described as a partially existing highway that roughly divides Arunachal Pradesh into its upper two-thirds and lower one-third portions.

The Arunachal Frontier Highway is planned to run close to the India-Bangladesh border.

Answer: False

The Arunachal Frontier Highway is proposed to run along and close to the India-China Line of Actual Control (LAC).

Related Concepts:

  • What is the defining characteristic of the proposed alignment for the Arunachal Frontier Highway?: The Arunachal Frontier Highway is proposed to run along and as close as possible to the India-China Line of Actual Control (LAC), utilizing parts of the India-China Border Roads (ICBR) being constructed by the BRO.

The East-West Industrial Corridor Highway project is linked to the India-Myanmar-Thailand Friendship Highway.

Answer: True

The project is mentioned in the context of broader Northeast connectivity initiatives, including the India-Myanmar-Thailand Friendship Highway.

Related Concepts:

  • Which Northeast connectivity projects are mentioned as being related to the East-West Industrial Corridor Highway?: Related projects include general Northeast connectivity initiatives, Look-East Connectivity projects, the North-South and East-West Corridor, the India-Myanmar-Thailand Friendship Highway, the BCIM Economic Corridor, and the Asian Highway Network.

The six inter-corridor highways collectively span a total length of 966.78 km.

Answer: False

The six inter-corridor highways collectively span a total length of 2178 km.

Related Concepts:

  • What is the total combined length of the six inter-corridor highways planned for Arunachal Pradesh?: The six inter-corridor highways collectively span a total length of 2178 km. They are designed to link the major east-west highway networks within the state.

The Pasighat-Bishing Highway is one of the six inter-corridor highways and measures 298 km.

Answer: True

The Pasighat-Bishing Highway is listed as one of the six inter-corridor highways and has a specified length of 298 km.

Related Concepts:

  • What is the length of the Pasighat-Bishing Highway, one of the six inter-corridor highways?: The Pasighat-Bishing Highway is specified as having a length of 298 km. It is one of the six corridors planned to connect the major east-west routes within Arunachal Pradesh.
  • Can you list the six proposed inter-corridor highways mentioned in the article?: The six inter-corridor highways, listed from west to east, are: Thelamara-Tawang-Nelia Highway (402 km), Itakhola-Pakke-Kessang-Seppa-Parsi Parlo Highway (391 km), Gogamukh-Taliha-Tato Highway (285 km), Akajan-Jorging-Pango Highway (398 km), Pasighat-Bishing Highway (298 km), and Kanubari-Longding Highway (404 km).

The 'Look East connectivity' policy aims to strengthen ties with Southeast Asian nations.

Answer: True

'Look East connectivity' refers to India's policy focused on enhancing economic and strategic ties with Southeast Asian nations.

Related Concepts:

  • What is the meaning of 'Look East connectivity' in relation to this highway project?: 'Look East connectivity' refers to India's policy aimed at enhancing economic and strategic ties with Southeast Asian nations. This highway project contributes to that policy by improving infrastructure that links India's northeastern region to its eastern neighbors.

The Bharatmala-II plan is relevant to Phase-VII's western extension, focusing on border connectivity.

Answer: True

Phase-VII's western extension is incorporated into the Bharatmala-II plan, highlighting its role in enhancing national road infrastructure and border connectivity.

Related Concepts:

  • What is the significance of the Bharatmala-II plan in relation to Phase-VII of the highway project?: Phase-VII's western extension is incorporated into the Bharatmala-II plan, signifying that this highway development is part of a larger national strategy to enhance road infrastructure, particularly focusing on economic corridors and border connectivity across India.

Which highway project divides Arunachal Pradesh into upper and lower thirds?

Answer: Trans-Arunachal Highway

Related Concepts:

  • What is the general alignment of the Trans-Arunachal Highway mentioned in the article?: The Trans-Arunachal Highway is described as a partially existing highway that roughly divides Arunachal Pradesh into its upper two-thirds and lower one-third portions.

What is the total combined length of the 'Six Inter-corridor highways'?

Answer: 2178 km

Related Concepts:

  • What is the total combined length of the six inter-corridor highways planned for Arunachal Pradesh?: The six inter-corridor highways collectively span a total length of 2178 km. They are designed to link the major east-west highway networks within the state.

Which of the following is NOT one of the six proposed inter-corridor highways?

Answer: Manmao-Kanubari Highway

Related Concepts:

  • Can you list the six proposed inter-corridor highways mentioned in the article?: The six inter-corridor highways, listed from west to east, are: Thelamara-Tawang-Nelia Highway (402 km), Itakhola-Pakke-Kessang-Seppa-Parsi Parlo Highway (391 km), Gogamukh-Taliha-Tato Highway (285 km), Akajan-Jorging-Pango Highway (398 km), Pasighat-Bishing Highway (298 km), and Kanubari-Longding Highway (404 km).

How does the East-West Industrial Corridor Highway project relate to the BCIM Economic Corridor?

Answer: It is planned to connect with the BCIM Economic Corridor.

Related Concepts:

  • How does the East-West Industrial Corridor Highway project relate to the BCIM Economic Corridor?: The East-West Industrial Corridor Highway, along with the Arunachal Frontier Highway, is planned to connect with the BCIM (Bangladesh-China-India-Myanmar) Economic Corridor, thereby enhancing regional connectivity and integration.

What is the alignment characteristic of the Arunachal Frontier Highway?

Answer: It runs along and close to the India-China Line of Actual Control (LAC).

Related Concepts:

  • What is the defining characteristic of the proposed alignment for the Arunachal Frontier Highway?: The Arunachal Frontier Highway is proposed to run along and as close as possible to the India-China Line of Actual Control (LAC), utilizing parts of the India-China Border Roads (ICBR) being constructed by the BRO.

Which of the following connectivity projects is mentioned as being related to the East-West Industrial Corridor Highway?

Answer: The India-Myanmar-Thailand Friendship Highway.

Related Concepts:

  • Which Northeast connectivity projects are mentioned as being related to the East-West Industrial Corridor Highway?: Related projects include general Northeast connectivity initiatives, Look-East Connectivity projects, the North-South and East-West Corridor, the India-Myanmar-Thailand Friendship Highway, the BCIM Economic Corridor, and the Asian Highway Network.

Project Implementation Challenges and Stakeholders

The Ministry of Road Transport and Highways (MoRTH) is solely responsible for preparing the Detailed Project Report (DPR) for the East-West Industrial Corridor Highway.

Answer: False

The Government of Arunachal Pradesh (GoAP) is responsible for preparing the Detailed Project Report (DPR), with the Ministry of Road Transport and Highways (MoRTH) granting the final approval.

Related Concepts:

  • Which government bodies are primarily responsible for the planning and approval of the East-West Industrial Corridor Highway?: The Government of Arunachal Pradesh (GoAP) is responsible for preparing the Detailed Project Report (DPR), which involves planning, surveys, and obtaining environmental and land acquisition approvals. Subsequently, the Ministry of Road Transport and Highways (MoRTH) grants the final approval for the project.

As of March 2021, the Detailed Project Report (DPR) for Phase-I was completed and approved for all packages.

Answer: False

As of March 2021, while the DPR for Phase-I was ready, approvals were pending for some packages, and land acquisition and environmental issues were causing delays.

Related Concepts:

  • What was the status of the East-West Industrial Corridor Highway project as of March 2021?: As of March 2021, the Detailed Project Report (DPR) for Phase-I was ready, and pre-DPR surveys for Phase-II were in progress. However, approvals were pending for some packages, and land acquisition and environmental issues, particularly concerning the Pakke Tiger Reserve for Package 2B, were causing delays.

Encumbrance-free land availability certificates were readily provided for all packages of Phase-I by March 2021.

Answer: False

The submission of DPRs for Packages 1 and 2A of Phase-I was delayed because Deputy Commissioners had not yet provided the necessary encumbrance-free land availability certificates.

Related Concepts:

  • What specific obstacles prevented the submission of DPRs for Packages 1 and 2A of Phase-I by March 2021?: The submission of DPRs for Package-1 (Pasighat-Naharlagun) and Package-2A (Naharlagun-Seijosa) was delayed because the respective Deputy Commissioners had not yet provided the necessary encumbrance-free land availability certificates.
  • What specific land-related issues were causing delays for Packages 1 and 2A of Phase-I as of March 2021?: The submission of DPRs for Packages 1 and 2A was delayed because the relevant Deputy Commissioners had not yet provided the necessary encumbrance-free land availability certificates.

Package 2B of Phase-I faced no environmental concerns regarding its alignment.

Answer: False

Package 2B faced land acquisition and environmental approval challenges due to its alignment passing through the Pakke Tiger Reserve.

Related Concepts:

  • What environmental challenge was identified for Package 2B of Phase-I?: Package 2B, covering the Seijosa to Bhalukpong section, faced hurdles related to land acquisition and environmental approvals due to its proposed alignment passing through the Pakke Tiger Reserve.
  • What environmental concern was highlighted for Package 2B of Phase-I?: Package 2B, which covers the route from Seijosa to Bhalukpong, faced land acquisition and environmental approval challenges because its planned alignment passes through the Pakke Tiger Reserve.

As of March 2021, planning and DPR preparation for Phase-III and Phase-IV had made significant progress.

Answer: False

As of March 2021, there were no media reports indicating significant progress on planning or DPR preparation for Phase-III and Phase-IV.

Related Concepts:

  • What was the status regarding planning for Phase-III and Phase-IV projects as of March 2021?: As of March 2021, there were no media reports indicating any progress on the planning, surveys, or DPR preparation for the important Phase-III and Phase-IV segments of the East-West Industrial Corridor Highway.
  • What was the reported status of planning for Phase-III, Phase-IV, and future expansion projects as of March 2021?: As of March 2021, there were no media reports indicating any progress on integrated planning, surveys, or DPR preparation for the crucial Phase-III, Phase-IV, and the future expansion phases (V-VIII) of the East-West Industrial Corridor Highway.

The Border Roads Organisation (BRO) is responsible for the long-term maintenance of all completed highway projects in Arunachal Pradesh.

Answer: False

Ideally, the BRO should transfer completed basic roads to agencies like NHAI or state PWDs for maintenance, allowing the BRO to focus on new strategic routes.

Related Concepts:

  • What is the role of the Border Roads Organisation (BRO) in the context of these highway projects?: The BRO is involved in constructing some of the existing strategic border roads. The article suggests that ideally, the BRO should hand over completed basic roads to agencies like NHAI or state PWDs so the BRO can focus on building new strategic routes in inaccessible areas.
  • What are the key challenges faced due to the involvement of multiple agencies like the Border Roads Organisation (BRO) and National Highways Authority of India (NHAI) in Arunachal Pradesh's highway projects?: Challenges include potential inter-agency conflicts ('turf wars'), inadequate justification for project execution, suboptimal connectivity planning, and reduced return on investment. Ideally, completed roads by the BRO should be transferred to agencies like NHAI or state Public Works Departments (PWDs) for maintenance and civilian use.

The Ministry of Defence (MoD) is involved in coordinating the highway project due to its strategic alignment near border areas.

Answer: True

The Ministry of Defence (MoD) is a key entity requiring coordination due to the highway's strategic alignment near sensitive border regions.

Related Concepts:

  • What role does the Ministry of Defence (MoD) play in the coordination of this highway project?: The Ministry of Defence (MoD) is listed as one of the key entities that the Government of Arunachal Pradesh must coordinate with, highlighting the strategic importance and security considerations associated with the highway's alignment near border areas.

Who is responsible for preparing the Detailed Project Report (DPR) for the East-West Industrial Corridor Highway?

Answer: The Government of Arunachal Pradesh (GoAP).

Related Concepts:

  • Which government bodies are primarily responsible for the planning and approval of the East-West Industrial Corridor Highway?: The Government of Arunachal Pradesh (GoAP) is responsible for preparing the Detailed Project Report (DPR), which involves planning, surveys, and obtaining environmental and land acquisition approvals. Subsequently, the Ministry of Road Transport and Highways (MoRTH) grants the final approval for the project.

Which of the following is a key challenge mentioned regarding the involvement of multiple agencies like BRO and NHAI in highway projects?

Answer: Potential inter-agency conflicts and suboptimal connectivity planning.

Related Concepts:

  • What are the key challenges faced due to the involvement of multiple agencies like the Border Roads Organisation (BRO) and National Highways Authority of India (NHAI) in Arunachal Pradesh's highway projects?: Challenges include potential inter-agency conflicts ('turf wars'), inadequate justification for project execution, suboptimal connectivity planning, and reduced return on investment. Ideally, completed roads by the BRO should be transferred to agencies like NHAI or state Public Works Departments (PWDs) for maintenance and civilian use.

What issue caused delays in submitting DPRs for Packages 1 and 2A of Phase-I as of March 2021?

Answer: Deputy Commissioners not providing encumbrance-free land availability certificates.

Related Concepts:

  • What specific obstacles prevented the submission of DPRs for Packages 1 and 2A of Phase-I by March 2021?: The submission of DPRs for Package-1 (Pasighat-Naharlagun) and Package-2A (Naharlagun-Seijosa) was delayed because the respective Deputy Commissioners had not yet provided the necessary encumbrance-free land availability certificates.
  • What specific land-related issues were causing delays for Packages 1 and 2A of Phase-I as of March 2021?: The submission of DPRs for Packages 1 and 2A was delayed because the relevant Deputy Commissioners had not yet provided the necessary encumbrance-free land availability certificates.

What was the status of planning for Phase-III and Phase-IV as of March 2021?

Answer: No media reports indicated progress on planning or DPR preparation.

Related Concepts:

  • What was the reported status of planning for Phase-III, Phase-IV, and future expansion projects as of March 2021?: As of March 2021, there were no media reports indicating any progress on integrated planning, surveys, or DPR preparation for the crucial Phase-III, Phase-IV, and the future expansion phases (V-VIII) of the East-West Industrial Corridor Highway.
  • What was the status regarding planning for Phase-III and Phase-IV projects as of March 2021?: As of March 2021, there were no media reports indicating any progress on the planning, surveys, or DPR preparation for the important Phase-III and Phase-IV segments of the East-West Industrial Corridor Highway.

What is the suggested ideal role for the Border Roads Organisation (BRO) regarding completed roads?

Answer: To transfer completed basic roads to agencies like NHAI or state PWDs.

Related Concepts:

  • What is the role of the Border Roads Organisation (BRO) in the context of these highway projects?: The BRO is involved in constructing some of the existing strategic border roads. The article suggests that ideally, the BRO should hand over completed basic roads to agencies like NHAI or state PWDs so the BRO can focus on building new strategic routes in inaccessible areas.
  • What are the key challenges faced due to the involvement of multiple agencies like the Border Roads Organisation (BRO) and National Highways Authority of India (NHAI) in Arunachal Pradesh's highway projects?: Challenges include potential inter-agency conflicts ('turf wars'), inadequate justification for project execution, suboptimal connectivity planning, and reduced return on investment. Ideally, completed roads by the BRO should be transferred to agencies like NHAI or state Public Works Departments (PWDs) for maintenance and civilian use.

Ancillary Developments and Related Infrastructure

Tourist circuits have been developed under the Swadesh Darshan Scheme, linking highways with key tourist destinations.

Answer: True

Tourist circuits have indeed been developed under the Swadesh Darshan Scheme, connecting highways with significant tourist destinations in the region.

Related Concepts:

  • How has tourism development been integrated with the highway projects in Arunachal Pradesh?: Tourist circuits have been developed under the Swadesh Darshan Scheme, linking highways like the Arunachal Frontier Highway and the East-West Industrial Corridor Highway with key tourist destinations. Examples include the Bhalukpong-Bomdila-Tawang circuit and a circuit connecting Nafra, Seppa, Ziro, and Yomcha.
  • Which tourist circuit is associated with the East-West Industrial Corridor Highway under the Swadesh Darshan Scheme?: A tourist circuit developed under the Swadesh Darshan Scheme connects key locations like Nafra, Seppa, Ziro, and Yomcha, utilizing segments of both the Trans-Arunachal Highway and the East-West Industrial Corridor Highway.

Connecting the highway to National Waterway 2 is significant because Sadiya is a major port town.

Answer: True

Connecting the highway to National Waterway 2 at Sadiya is significant as Sadiya serves as an important port town, integrating land and water transport infrastructure.

Related Concepts:

  • What is the significance of connecting the highway project to National Waterway 2 (NW2)?: Connecting the highway, particularly through Phase-IV involving the Sadiya Sille-Oyan bridge, to National Waterway 2 at Sadiya is significant because Sadiya is an important port town, integrating land and water transport infrastructure.
  • What is the significance of the proposed Sadiya Sille-Oyan bridge in Phase-IV of the project?: The Sadiya Sille-Oyan bridge is a key component of Phase-IV, designed to drastically reduce the travel distance between Sille-Oyan and Sadiya from 180 km to 40 km. It also connects to National Waterway 2 at Sadiya, an important port town.

Under which scheme have tourist circuits been developed linking highways in Arunachal Pradesh?

Answer: Swadesh Darshan Scheme

Related Concepts:

  • How has tourism development been integrated with the highway projects in Arunachal Pradesh?: Tourist circuits have been developed under the Swadesh Darshan Scheme, linking highways like the Arunachal Frontier Highway and the East-West Industrial Corridor Highway with key tourist destinations. Examples include the Bhalukpong-Bomdila-Tawang circuit and a circuit connecting Nafra, Seppa, Ziro, and Yomcha.
  • Which tourist circuit is associated with the East-West Industrial Corridor Highway under the Swadesh Darshan Scheme?: A tourist circuit developed under the Swadesh Darshan Scheme connects key locations like Nafra, Seppa, Ziro, and Yomcha, utilizing segments of both the Trans-Arunachal Highway and the East-West Industrial Corridor Highway.

What is the significance of connecting the highway project to National Waterway 2 (NW2)?

Answer: It integrates land transport with water transport at Sadiya, an important port town.

Related Concepts:

  • What is the significance of connecting the highway project to National Waterway 2 (NW2)?: Connecting the highway, particularly through Phase-IV involving the Sadiya Sille-Oyan bridge, to National Waterway 2 at Sadiya is significant because Sadiya is an important port town, integrating land and water transport infrastructure.